Project intelligenceTDLR TABS2026028507Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Fire Station No. 28 in El Paso, TX

10820 McCombs 10820 McCombs, El Paso, TX, 79924

Opening ~Aug 2027Project Registered

Fire Station No. 28 is a renovation/alteration project at 10820 McCombs 10820 McCombs, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $106.5M across about 6,470 sq ft.

Estimated project value
$106.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,470 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$16.46K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 21, 2026375 days across supplied datesAug 31, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    334 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Fire Station No. 28

The City of El Paso is undertaking a renovation of Fire Station No. 28, a 6,470 sq ft facility located at 10820 McCombs in El Paso, TX 79924. This project involves the alteration of the existing structure to meet current operational and accessibility standards. The estimated cost for this work is $106,500,000, a figure that places the project in the top quarter of similar renovation filings in El Paso County.

Exigo Architects serves as the design firm of record for this initiative. The registered accessibility specialist for the project is Julie Ericson Gereda. The project was registered with TDLR in August 2026, and construction is scheduled to begin in October 2026. The filing indicates that plan review is pending, and completion is targeted for August 2027.

Project Scope and Financials

The scope of work is defined strictly as renovation. The estimated cost of $106,500,000 results in a computed cost per square foot of $16461. This per-square-foot figure is above the county median of $66 for renovation and alteration projects. The total estimated cost is also above the county median of $204,000 for this type of work. The scheduled build window is 334 days, which is longer than the county median of 120 days.

This project involves public funds and public land. The City of El Paso is the owner of record. The firm Exigo Architects has six other TDLR-registered projects in the area, totaling $9,550,000. The City of El Paso has six other registered projects totaling $57,293,528. The project status is Project Registered.

Local Context

The project is located in ZIP code 79924. U.S. Census ACS 2023 five-year estimates indicate a population of about 60,399 in this area. The median household income is estimated at $56,786. There are approximately 23,009 housing units, with a median owner-occupied home value of $131,200. Housing in this area is mostly owner-occupied. El Paso County unemployment rate (FRED, July 2026) is 4.8 percent, higher than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79924 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

Fire Station No. 28 is a Renovation/Alteration project located at 10820 McCombs 10820 McCombs, El Paso, TX 79924 in El Paso, Texas. The project has an estimated value of $106.5M covering 6,470 sq ft. City of El Paso is the property owner and Exigo Architects is the design firm of record. The project was registered with TDLR on August 21, 2026.

Frequently Asked Questions

What is the status of the Fire Station No. 28 renovation?

The project was registered with TDLR in August 2026. Plan review is pending, and construction is targeted for August 2027 completion.

Who is designing the new Fire Station No. 28?

Exigo Architects is the design firm of record for this renovation project in El Paso.

How much does the renovation cost?

The estimated cost for the Fire Station No. 28 renovation is $106,500,000.

When does construction start?

Construction is scheduled to begin in October 2026 according to the TDLR filing.

Is the fire station open to the public?

The TDLR record tracks construction status, not business operations. The project is targeted for August 2027 completion.

What is Fire Station No. 28?

Fire Station No. 28 is a renovation/alteration project at 10820 McCombs 10820 McCombs in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation

Is Fire Station No. 28 open in El Paso?

Fire Station No. 28 is still under construction in El Paso, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Fire Station No. 28 located?

Fire Station No. 28 is located at 10820 McCombs 10820 McCombs, El Paso, TX, 79924, in El Paso County.

Who is the owner or developer of Fire Station No. 28?

City of El Paso is the property owner/developer of record for Fire Station No. 28, per its TDLR project registration.

Who is the architect or design firm for Fire Station No. 28?

Exigo Architects is the design firm of record for Fire Station No. 28, according to its TDLR filing.

How much does Fire Station No. 28 cost and how big is it?

Fire Station No. 28 has an estimated construction value of $106.5M and approximately 6,470 square feet (about $16.46K/sqft), based on its TDLR filing.

Scope of Work

Renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

10820 McCombs 10820 McCombs, El Paso, TX, 79924

31.92727, -106.40691

Watch all construction in 79924 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.