Project intelligenceTDLR TABS2026028691New Construction
Funding type

This project is privately funded, on private land for private use.

Eagle Creek Phase 3B in Denton, TX

2801 Highland Park Road, Denton, TX, 76205

Target date passed (Oct 2026)Project Registered

Eagle Creek Phase 3B is a new construction project at 2801 Highland Park Road, Denton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $60K across about 1,620 sq ft.

Estimated project value
$60K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,620 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$37/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 24, 202652 days across supplied datesOct 15, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    22 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Eagle Creek Phase 3B

Eagle Creek Phase 3B is a new construction project located at 2801 Highland Park Road in Denton, Texas. The filing specifies a scope of 18 BFRs covering 1,620 sq ft. This small-scale development is registered with TDLR under the accessibility program, with plan review pending.

The project is owned by Forestar Real Estate Group Inc. and designed by Kimley Horn. The estimated cost for this build is $60,000, which calculates to $37 per square foot. This figure is below the county median of $121 per square foot for similar new construction filings in Denton County.

Construction is scheduled to begin in September 2026. The completion date on the filing is targeted for October 2026. This represents a scheduled build window of 30 days, which is shorter than the county median of 219 days for comparable projects.

Project Context and Local Data

The ZIP code 76205, where the project is situated, has a population of about 19,651 according to U.S. Census estimates. The median household income in this area is $65,322. Housing in this ZIP code is mostly renter-occupied, with a median owner-occupied home value of $307,900. The project is privately funded on private land for private use.

Kimley Horn, the design firm of record, has six other TDLR-registered projects in Texas. These include developments in Celina, Leander, Anna, New Braunfels, and San Antonio. The total value of these other projects is $1,673,890. This indicates the firm handles a variety of commercial and retail construction projects across the state.

The registered accessibility specialist for this specific filing is Mary Rae Davies. The project registration date with TDLR is August 2026. The status remains Project Registered as the administrative review process continues. The low cost per square foot and short build timeline suggest a focused, efficient construction effort for this specific scope of work.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76205 (Denton)

One email per change. Unsubscribe in one click. Privacy.

Eagle Creek Phase 3B is a New Construction project located at 2801 Highland Park Road, Denton, TX 76205 in Denton, Texas. The project has an estimated value of $60K covering 1,620 sq ft. Forestar Real Estate Group Inc. is the property owner and Kimley Horn is the design firm of record. The project was registered with TDLR on August 24, 2026.

Frequently Asked Questions

When is Eagle Creek Phase 3B expected to be finished?

The filing lists a completion date targeted for October 2026. Construction is scheduled to start in September 2026, resulting in a 30-day build window.

How much does the Eagle Creek Phase 3B project cost?

The estimated cost is $60,000. This amounts to $37 per square foot for the 1,620 sq ft site, which is below the Denton County median for new construction.

Who is the owner and developer of this project?

Forestar Real Estate Group Inc. is the owner and developer of record. The design firm of record is Kimley Horn, with Mary Rae Davies as the registered accessibility specialist.

Is the business at 2801 Highland Park Road open?

The TDLR record only tracks construction status. The project is targeted for October 2026 completion, and plan review is pending. There is no information in the record confirming business operations.

What is the square footage of the Eagle Creek Phase 3B site?

The scope of work covers 1,620 sq ft. The filing also specifies 18 BFRs as part of the new construction details for this Denton County project.

What is Eagle Creek Phase 3B?

Eagle Creek Phase 3B is a new construction project at 2801 Highland Park Road in Denton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 18 BFR's, 1620 sf.

Is Eagle Creek Phase 3B open in Denton?

Eagle Creek Phase 3B was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Eagle Creek Phase 3B located?

Eagle Creek Phase 3B is located at 2801 Highland Park Road, Denton, TX, 76205, in Denton County.

Who is the owner or developer of Eagle Creek Phase 3B?

Forestar Real Estate Group Inc. is the property owner/developer of record for Eagle Creek Phase 3B, per its TDLR project registration.

Who is the architect or design firm for Eagle Creek Phase 3B?

Kimley Horn is the design firm of record for Eagle Creek Phase 3B, according to its TDLR filing.

How much does Eagle Creek Phase 3B cost and how big is it?

Eagle Creek Phase 3B has an estimated construction value of $60K and approximately 1,620 square feet (about $37/sqft), based on its TDLR filing.

Scope of Work

18 BFR's, 1620 sf.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2801 Highland Park Road, Denton, TX, 76205

Loading location map…
33.20001, -97.15471

Watch all construction in 76205 (Denton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.