Project intelligenceTDLR TABS2026028749Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

Medical City McKinney Temporary Kitchen

4500 Medical Center Drive, Mckinney, TX, 75069

Opening ~Nov 2026Project Registered

Medical City McKinney Temporary Kitchen is a additions to existing building project at 4500 Medical Center Drive, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $150K across about 2,500 sq ft.

Estimated project value
$150K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$60/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 25, 202694 days across supplied datesNov 27, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    87 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Medical City McKinney Temporary Kitchen

MCM Rehabilitation is adding a 2,500 sq ft temporary kitchen to Medical City McKinney at 4500 Medical Center Drive in Mckinney. The project, filed under the name Medical City McKinney Temporary Kitchen, is designed to serve patients and staff while the hospital's existing kitchen undergoes renovation. This addition is a distinct construction phase within the larger medical campus in Collin County.

The estimated cost for this specific addition is $150,000. This figure is below the median estimated cost of $490,000 for similar additions to existing buildings in Collin County. The per-square-foot cost of $60 is also below the county median of $149, reflecting the temporary and modular nature of the structure compared to permanent hospital expansions.

Project Details and Status

The owner of record is Columbia Medical Center of McKinney Subsidiary LP, which has one other TDLR-registered project in the area. The design firm of record is Devenney Group, a firm with a broader portfolio including other medical facility projects in Texas. The registered accessibility specialist for this filing is Bonita L Anderson. The project is privately funded on private land for private use.

According to the TDLR filing, construction is scheduled to begin in September 2026. The project was registered with TDLR in August 2026, and plan review is pending. The completion date listed on the filing is November 2026, meaning the work is targeted for November 2026. This scheduled build window of 87 days is shorter than the county median of 153 days for comparable projects.

This zoning status indicates a lower risk of flooding for the construction site. The surrounding area, ZIP code 75069, has a population of about 39,332 and a median household income of $82,804 according to U.S. Census estimates. The housing market in this ZIP is an even mix of owner- and renter-occupied units.

The project status is Project Registered. This means the application has been received and is in the queue for review. No further construction milestones are confirmed in the record beyond the scheduled start and completion dates. The temporary kitchen will likely be a modular or prefabricated structure given the short timeline and cost per square foot, allowing for quick installation to maintain hospital food service continuity during the renovation of the main kitchen.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75069 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

Medical City McKinney Temporary Kitchen is a Additions to Existing Building project located at 4500 Medical Center Drive, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $150K covering 2,500 sq ft. Columbia Medical Center of McKinney Subsidiary LP is the property owner and Devenney Group is the design firm of record. The project was registered with TDLR on August 25, 2026.

Frequently Asked Questions

Is MCM Rehabilitation open?

The TDLR record shows a construction project for a temporary kitchen at Medical City McKinney. It does not indicate that a business named MCM Rehabilitation is open or operating. The filing describes construction work, not business operations.

Who is building the temporary kitchen?

The owner of record is Columbia Medical Center of McKinney Subsidiary LP. The design firm of record is Devenney Group. The registered accessibility specialist is Bonita L Anderson. The filing does not specify the general contractor.

When will the temporary kitchen be finished?

The filing states construction start is September 2026 and completion is targeted for November 2026. The project is registered with TDLR, and plan review is pending.

How big is the addition?

The addition is 2,500 sq ft. The estimated cost is $150,000, which works out to $60 per square foot. This is below the county median for similar projects in Collin County.

Why is a temporary kitchen being built?

The scope of work states the addition is to serve the hospital while the existing kitchen is being renovated. This allows food service to continue uninterrupted during the main kitchen upgrades.

What is Medical City McKinney Temporary Kitchen?

Medical City McKinney Temporary Kitchen is a additions to existing building project at 4500 Medical Center Drive in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of a temporary kitchen to serve the hospital while the existing kitchen is being renovated

Is Medical City McKinney Temporary Kitchen open in Mckinney?

Medical City McKinney Temporary Kitchen is still under construction in Mckinney, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is Medical City McKinney Temporary Kitchen located?

Medical City McKinney Temporary Kitchen is located at 4500 Medical Center Drive, Mckinney, TX, 75069, in Collin County.

Who is the owner or developer of Medical City McKinney Temporary Kitchen?

Columbia Medical Center of McKinney Subsidiary LP is the property owner/developer of record for Medical City McKinney Temporary Kitchen, per its TDLR project registration.

Who is the architect or design firm for Medical City McKinney Temporary Kitchen?

Devenney Group is the design firm of record for Medical City McKinney Temporary Kitchen, according to its TDLR filing.

How much does Medical City McKinney Temporary Kitchen cost and how big is it?

Medical City McKinney Temporary Kitchen has an estimated construction value of $150K and approximately 2,500 square feet (about $60/sqft), based on its TDLR filing.

Scope of Work

Addition of a temporary kitchen to serve the hospital while the existing kitchen is being renovated

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4500 Medical Center Drive, Mckinney, TX, 75069

Loading location map…
33.16149, -96.63552

Watch all construction in 75069 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.