Funding type
This project is privately funded, on private land for private use.
North Campus Manufacturing in Austin, TX
1 Harold Green Road, Austin, TX, 78725
North Campus Manufacturing is a new construction project at 1 Harold Green Road, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2029. The project has an estimated value of $50K across about 69,784,854 sq ft.
- Estimated project value
- $50K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 69,784,854 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $0/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,224 days after the preceding date shown.
Source: TDLR filing
View source record
📰About North Campus Manufacturing
Tesla, Inc. is developing a massive semiconductor facility at 1 Harold Green Road in Austin, Texas. The project involves the ground-up construction and complete interior finish of a manufacturing plant, with a stated scope of 6,974,854 square feet. This development represents a significant industrial addition to the Travis County landscape, focusing on high-tech production capabilities within the city limits.
The project was registered with the Texas Department of Licensing and Regulation (TDLR) in August 2026. According to the filing, construction is scheduled to begin in August 2026, and completion is targeted for December 2029. This timeline indicates a scheduled build window of 1,224 days, which is longer than the county median of 304 days for similar new construction filings in Travis County.
Mark S Robinson is the registered accessibility specialist associated with this filing. The project is privately funded and located on private land for private use. The estimated cost listed in the TDLR record is $50,000, which places the project in the bottom quarter of estimated costs for new construction filings in the county. This figure is below the county median of $1,000,000 for comparable projects registered in the last 24 months.
Tesla, Inc. holds six other TDLR-registered projects, totaling $1,125,000 in estimated costs. These include locations in Brookshire, Cotulla, and Waco, as well as other Austin-based filings such as Cortex 2.0 and Austin Semiconductor Fab. The North Campus Manufacturing project stands out due to its specified scope of over 6.9 million square feet, a figure that significantly exceeds the median size of 12,000 square feet for new construction in Travis County.
The address is situated in ZIP code 78725, where the U.S. Census estimates the population at about 10,810 residents. The median household income in this area is $102,819, and the median owner-occupied home value is $306,800. City of Austin permit records show one plumbing permit issued at this street address in May 2021, though this specific record may relate to other tenants or suites at the location. The TDLR status remains Project Registered, with plan review pending.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78725 (Austin)
One email per change. Unsubscribe in one click. Privacy.
North Campus Manufacturing is a New Construction project located at 1 Harold Green Road, Austin, TX 78725 in Austin, Texas. The project has an estimated value of $50K covering 69,784,854 sq ft. Tesla, Inc. is the property owner. The project was registered with TDLR on August 25, 2026.
Frequently Asked Questions
What is the current status of the North Campus Manufacturing project?
The project was registered with TDLR in August 2026. Plan review is pending, and completion is targeted for December 2029. It is not yet finished.
Who is the owner of the semiconductor facility at 1 Harold Green Road?
Tesla, Inc. is the owner and developer of record for this project. The work is privately funded on private land.
How large is the new construction project in Austin?
The filing specifies a scope of 6,974,854 square feet for the ground-up construction and interior finish of the facility.
When is the project expected to be completed?
Construction start is listed for August 2026, and the completion date on the filing is December 2029.
Is the facility open for business?
No. The TDLR record indicates the project is in the registration phase with plan review pending. It is not operating.
What is North Campus Manufacturing?
North Campus Manufacturing is a new construction project at 1 Harold Green Road in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 6,974,854 SF, Ground up and complete interior finish out of the semiconductor facility.
Is North Campus Manufacturing open in Austin?
North Campus Manufacturing is still under construction in Austin, TX, with an estimated completion of Dec 2029 according to its TDLR registration.
Where is North Campus Manufacturing located?
North Campus Manufacturing is located at 1 Harold Green Road, Austin, TX, 78725, in Travis County.
Who is the owner or developer of North Campus Manufacturing?
Tesla, Inc. is the property owner/developer of record for North Campus Manufacturing, per its TDLR project registration.
How much does North Campus Manufacturing cost and how big is it?
North Campus Manufacturing has an estimated construction value of $50K and approximately 69,784,854 square feet (about $0/sqft), based on its TDLR filing.
Scope of Work
6,974,854 SF, Ground up and complete interior finish out of the semiconductor facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1 Harold Green Road, Austin, TX, 78725
Related Projects
Nearby Projects
Within 0.6 miRelated City Permits
Building permits found at or near this location
Retroactively seeking permit for unpermitted work for a converted carport. The carport was converted into additional space for the living/dining area. We will need to get this work inspected for the owners can receive their Certificate of Occupancy.
Generator gas line
Replacement of Tankless Water Heater Like for Like
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Covered Porch and Attached Garage. 1508 EAST SIDE DR
New Service for SFR in ETJ. 3227 sq ft.
Watch all construction in 78725 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.