City of Waxahachie Fire Rescue Station No. 1
1475 Spur 394, Waxahachie, TX, 75165
City of Waxahachie Fire Rescue Station No. 1 is a renovation/alteration project at 1475 Spur 394, Waxahachie, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $10.0M across about 11,498 sq ft.
- Estimated project value
- $10.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,498 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $870/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
35 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
1 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
394 days after the preceding date shown.
Source: TDLR filing
View source record
📰About City of Waxahachie Fire Rescue Station No. 1
The City of Waxahachie Fire Rescue Station No. 1 is a new 11,498-square-foot facility located at 1475 Spur 394 in Waxahachie, Texas. The project is registered as a renovation or alteration, though the scope of work describes the new construction of the station, which includes four bays, crew quarters, and related support spaces. The estimated cost for this public infrastructure project is $10,000,000.
Construction is scheduled to begin in October 2026, with completion targeted for October 2027. The project was registered with the Texas Department of Licensing and Regulation in August 2026. This timeline places the build window at 395 days, which is longer than the 92-day median scheduled build window for renovation and alteration filings in Ellis County.
Project Scale and Cost
At $10,000,000, the estimated cost is above the county median of $230,000 for similar registered work. The cost per square foot is computed at $870, significantly above the county median of $84 per square foot for renovation and alteration projects. The size of 11,498 square feet is also larger than the median size of 3,700 square feet for comparable filings in the region. These figures reflect a substantial investment in local emergency services infrastructure.
Rbdr, PLLC is the design firm of record for the project. Michael Lynn Kelley is the registered accessibility specialist associated with the filing. The City of Waxahachie is the owner and developer of record. The city has six other TDLR-registered projects totaling $11,803,870, including the Central Offices renovation and various sidewalk improvements. Rbdr, PLLC has six other registered projects totaling $19,513,730, including work in Waco and Whitney.
Local Context
The project is situated in ZIP code 75165, which has a population of about 51,203 according to U.S. Census American Community Survey 2023 five-year estimates. The median household income in the area is $84,780, and the median owner-occupied home value is $308,100. Housing in the area is mostly owner-occupied. The Ellis County unemployment rate was 4.5 percent in July 2026, higher than a year earlier. This construction project represents a significant development in the Ellis County labor market and local infrastructure.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75165 (Waxahachie)
One email per change. Unsubscribe in one click. Privacy.
City of Waxahachie Fire Rescue Station No. 1 is a Renovation/Alteration project located at 1475 Spur 394, Waxahachie, TX 75165 in Waxahachie, Texas. The project has an estimated value of $10.0M covering 11,498 sq ft. City of Waxahachie is the property owner and RBDR, PLLC is the design firm of record. The project was registered with TDLR on August 27, 2026.
Frequently Asked Questions
What is the estimated cost of the Waxahachie Fire Station No. 1 project?
The estimated cost for the City of Waxahachie Fire Rescue Station No. 1 project is $10,000,000. This figure is above the county median for renovation and alteration filings in Ellis County.
When is the construction scheduled to be completed?
The project is targeted for October 2027. Construction is scheduled to start in October 2026, with the registration filed in August 2026.
Who is the design firm for the fire station?
Rbdr, PLLC is the design firm of record for the City of Waxahachie Fire Rescue Station No. 1 project. Michael Lynn Kelley is the registered accessibility specialist.
Is the fire station open for public access?
The project is in the construction phase and is targeted for October 2027. The TDLR record indicates the project is registered, but it does not confirm public opening dates.
What is the square footage of the new fire station?
The City of Waxahachie Fire Rescue Station No. 1 is 11,498 square feet. This includes four bays, crew quarters, and related support spaces.
What is City of Waxahachie Fire Rescue Station No. 1?
City of Waxahachie Fire Rescue Station No. 1 is a renovation/alteration project at 1475 Spur 394 in Waxahachie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of a 11,498 square foot Fire Station generally including 4 bays, crew quarters, & related support spaces
Is City of Waxahachie Fire Rescue Station No. 1 open in Waxahachie?
City of Waxahachie Fire Rescue Station No. 1 is still under construction in Waxahachie, TX, with an estimated completion of Oct 2027 according to its TDLR registration.
Where is City of Waxahachie Fire Rescue Station No. 1 located?
City of Waxahachie Fire Rescue Station No. 1 is located at 1475 Spur 394, Waxahachie, TX, 75165, in Ellis County.
Who is the owner or developer of City of Waxahachie Fire Rescue Station No. 1?
City of Waxahachie is the property owner/developer of record for City of Waxahachie Fire Rescue Station No. 1, per its TDLR project registration.
Who is the architect or design firm for City of Waxahachie Fire Rescue Station No. 1?
RBDR, PLLC is the design firm of record for City of Waxahachie Fire Rescue Station No. 1, according to its TDLR filing.
How much does City of Waxahachie Fire Rescue Station No. 1 cost and how big is it?
City of Waxahachie Fire Rescue Station No. 1 has an estimated construction value of $10.0M and approximately 11,498 square feet (about $870/sqft), based on its TDLR filing.
Scope of Work
New construction of a 11,498 square foot Fire Station generally including 4 bays, crew quarters, & related support spaces
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1475 Spur 394, Waxahachie, TX, 75165
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$33.3M totalWatch all construction in 75165 (Waxahachie)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Waxahachie?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.