The Grove Church - Pavilion in Argyle, TX
825 Sam Davis Rd, Argyle, TX, 76226
The Grove Church - Pavilion is a new construction project at 825 Sam Davis Rd, Argyle, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $300K across about 1,956 sq ft.
- Estimated project value
- $300K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,956 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $153/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
140 days after the preceding date shown.
Source: TDLR filing
View source record
📰About The Grove Church - Pavilion
The Grove Church is constructing a new 1,956 sq ft pavilion at 825 Sam Davis Rd in Argyle, Texas. This new construction project serves as an accessory space for the existing sanctuary and is registered with TDLR with a status of Project Registered.
The estimated cost for the build is $300,000, resulting in a computed cost of $153 per square foot. The project is privately funded on private land for private use. The design firm of record is Holtman Designworks, and Marc S Frame is the registered accessibility specialist. The construction start date per the filing is October 2026, and completion is targeted for March 2027.
Project Scale and Context
In Denton County, the median estimated cost for new construction filings is $900,000. This project’s cost is below the county median for its type. The median size for these filings is 8,015 sq ft, while this pavilion is significantly smaller at 1,956 sq ft. The median cost per square foot in the county is $121, making this project’s rate of $153 above the county median.
The scheduled build window for this project is 140 days, which is shorter than the county median of 219 days. The Grove Church has two other TDLR-registered projects totaling $4,800,000, both of which are closed. Holtman Designworks has six other TDLR-registered projects totaling $13,900,000, with varying statuses including review complete and inspection complete.
Location and Demographics
According to U.S. Census ACS 2023 five-year estimates for ZIP 76226, the population is about 40,516. The median household income is $170,530, and the median owner-occupied home value is $554,900. Housing in the area is predominantly owner-occupied, with 13,668 housing units recorded.
Plan review is pending following the registration in September 2026. The project remains in the registration phase, with construction scheduled to begin in October 2026. All details reflect the official TDLR filing and available public data for this specific accessibility project.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76226 (Argyle)
One email per change. Unsubscribe in one click. Privacy.
The Grove Church - Pavilion is a New Construction project located at 825 Sam Davis Rd, Argyle, TX 76226 in Argyle, Texas. The project has an estimated value of $300K covering 1,956 sq ft. The Grove Church is the property owner and Holtman Designworks is the design firm of record. The project was registered with TDLR on September 4, 2026.
Frequently Asked Questions
What is the estimated cost of the pavilion?
The estimated cost for the new pavilion at The Grove Church is $300,000. This figure is based on the TDLR filing for the new construction project in Argyle.
Who is the design firm for this project?
Holtman Designworks is the design firm of record. Marc S Frame is the registered accessibility specialist for the pavilion construction.
Is the construction finished?
No, the project is not finished. Plan review is pending, and completion is targeted for March 2027. Construction is scheduled to start in October 2026.
What is the square footage of the new building?
The new pavilion is 1,956 sq ft. This size is smaller than the median new construction size in Denton County, which is 8,015 sq ft.
Is the business open?
The TDLR record indicates the project is under construction and targeted for March 2027. It does not confirm that the business is open or operating.
What is The Grove Church - Pavilion?
The Grove Church - Pavilion is a new construction project at 825 Sam Davis Rd in Argyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New pavilion to act as accessory space for existing sanctuary
Is The Grove Church - Pavilion open in Argyle?
The Grove Church - Pavilion is still under construction in Argyle, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is The Grove Church - Pavilion located?
The Grove Church - Pavilion is located at 825 Sam Davis Rd, Argyle, TX, 76226, in Denton County.
Who is the owner or developer of The Grove Church - Pavilion?
The Grove Church is the property owner/developer of record for The Grove Church - Pavilion, per its TDLR project registration.
Who is the architect or design firm for The Grove Church - Pavilion?
Holtman Designworks is the design firm of record for The Grove Church - Pavilion, according to its TDLR filing.
How much does The Grove Church - Pavilion cost and how big is it?
The Grove Church - Pavilion has an estimated construction value of $300K and approximately 1,956 square feet (about $153/sqft), based on its TDLR filing.
Scope of Work
New pavilion to act as accessory space for existing sanctuary
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
825 Sam Davis Rd, Argyle, TX, 76226
Related Projects
Same Owner
$5.1M totalNearby Projects
Within 0.6 miWatch all construction in 76226 (Argyle)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Argyle?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.