Dr. M Dental in Leander, TX
156 COLLECTIVE WAY, SUITE 110, Leander, TX, 78641
Dr. M Dental is a new construction project at 156 COLLECTIVE WAY, SUITE 110, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $400K across about 2,479 sq ft.
- Estimated project value
- $400K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,479 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $161/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
21 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
33 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
80 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Dr. M Dental
Collective Leander is a 2,479 sq ft new construction project located at 156 Collective Way, Suite 110, in Leander. The filing identifies the specific business tenant as Dr. M Dental, which will occupy the space after renovation. The project is registered with TDLR and is targeted for January 2027.
Ishav Properties LLC is the owner of record for this development. The scope of work involves the first-time finish out of a shell space to create a functional dental office. This includes installing new ADA-compliant restrooms, along with new mechanical, electrical, and plumbing systems and finishes. The estimated cost for this work is $400,000.
Construction Details and Timeline
The construction start date is listed as November 2026, with a scheduled completion date of January 2027. This creates a planned build window of 80 days. The project was registered in September 2026, and plan review is pending. The status is Project Registered.
The site is situated in Williamson County within a FEMA Special Flood Hazard Area, specifically zone AE. This designation is based on the site coordinates provided in the FEMA National Flood Hazard Layer. The project is privately funded and located on private land for private use.
Compared to other new construction filings in Williamson County, this project’s estimated cost is below the county median of $850,000. The median size for similar projects is 9,014 sq ft, making this space significantly smaller. The cost per square foot is $161, which is above the county median of $110 per sq ft. The scheduled build window is shorter than the county median of 245 days.
Ishav Properties LLC has one other TDLR-registered project in Leander called Frontier ER, with an estimated cost of $2,025,000. The local area profile for ZIP code 78641 indicates a population of about 93,399 people. The median household income in this area is $131,421, and the median owner-occupied home value is $453,100.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78641 (Leander)
One email per change. Unsubscribe in one click. Privacy.
Dr. M Dental is a New Construction project located at 156 COLLECTIVE WAY, SUITE 110, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $400K covering 2,479 sq ft. Ishav Properties LLC is the property owner. The project was registered with TDLR on September 8, 2026.
Frequently Asked Questions
Is Collective Leander open for business?
No. The TDLR record shows the project is in the construction phase with a target completion date of January 2027. It is not yet open.
Who owns the property at 156 Collective Way?
Ishav Properties LLC is the owner of record for this project. They are also the owner of the Frontier ER project in Leander.
What type of business will occupy the space?
The filing identifies the tenant as Dr. M Dental. The space is being finished out specifically for use as a dental office.
How much does the project cost?
The estimated cost for the new construction and finish out is $400,000. This translates to approximately $161 per square foot.
When is the construction expected to finish?
The completion date on the filing is January 2027. Construction is scheduled to start in November 2026.
What is Dr. M Dental?
Dr. M Dental is a new construction project at 156 COLLECTIVE WAY, SUITE 110 in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First time finish out to the shell space for the purpose of a Dental Office. New ADA compliant restrooms in addition to new MEP and finishes.
Is Dr. M Dental open in Leander?
Dr. M Dental is still under construction in Leander, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Where is Dr. M Dental located?
Dr. M Dental is located at 156 COLLECTIVE WAY, SUITE 110, Leander, TX, 78641, in Williamson County.
Who is the owner or developer of Dr. M Dental?
Ishav Properties LLC is the property owner/developer of record for Dr. M Dental, per its TDLR project registration.
How much does Dr. M Dental cost and how big is it?
Dr. M Dental has an estimated construction value of $400K and approximately 2,479 square feet (about $161/sqft), based on its TDLR filing.
Scope of Work
First time finish out to the shell space for the purpose of a Dental Office. New ADA compliant restrooms in addition to new MEP and finishes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
156 COLLECTIVE WAY, SUITE 110, Leander, TX, 78641
Related Projects
Same Owner
$3.1M totalNearby Projects
Within 0.6 miRelated City Permits
Building permits found at or near this location
Enclose existing back porch
Extending existing covered porch to add an outdoor kitchen on existing 2 story sfr.
Installation of a new internally illuminated pylon sign for Steve Muckleroy. Existing sign to be removed.
Utility disconnect/reconnect. Tesla Back up switch. Underground service. AE. Meter Can does not need replacing- NO ESPA attached
ETJ - BASE: Installing a backup battery system and additional meter socket.
Watch all construction in 78641 (Leander)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Leander?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.