Project intelligenceTDLR TABS2027000513Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Texas Health Allen NUC Med Replacement and Refresh

1105 North central Expressway, Allen, TX, 75013

Opening ~Apr 2027Review Complete

Texas Health Allen NUC Med Replacement and Refresh is a renovation/alteration project at 1105 North central Expressway, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $1.7M across about 5,000 sq ft.

Estimated project value
$1.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$343/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 1, 2026243 days across supplied datesApr 1, 2027

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    175 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Texas Health Allen NUC Med Replacement and Refresh

Texas Health Allen Hospital is undergoing a $1,716,500 renovation at 1105 North Central Expressway in Allen, Texas. The project, filed under the name Texas Health Allen NUC Med Replacement and Refresh, covers 5,000 square feet of interior work within the nuclear medicine area. This specific alteration is scheduled to finish in April 2027, with construction starting in August 2026.

The scope of work involves equipment replacement and interior finishes for the NUC Med area. Texas Health Presbyterian Hospital Allen is the owner of record for this privately funded project on private land. The design firm of record is Perkins Will, which has four other TDLR-registered projects totaling $17,400,000 in the Dallas-Fort Worth area, including Redbird Dallas and Baylor Scott and White Medical Center - Grapevine.

The estimated cost of $343 per square foot is above the Collin County median of $78 per square foot for renovation and alteration filings. The total project cost is in the top quarter of the 11,155 similar filings in the county, where the median estimated cost is $220,000. The scheduled build window of 243 days is longer than the county median of 92 days for this type of work.

TDLR completed plan review in October 2026. The registered accessibility specialist for the project is Glenn Thomas Comtois. The Allen ZIP code 75013 has a median household income of $151,618 and a median owner-occupied home value of $561,000 according to U.S. Census ACS 2023 five-year estimates.

Construction is scheduled to finish in April 2027. The project is privately funded and does not involve public land or use. The design firm Perkins Will is responsible for the architectural plans. The work is strictly limited to the nuclear medicine area and associated interior finishes, with no expansion of the building footprint.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75013 (Allen)

One email per change. Unsubscribe in one click. Privacy.

Texas Health Allen NUC Med Replacement and Refresh is a Renovation/Alteration project located at 1105 North central Expressway, Allen, TX 75013 in Allen, Texas. The project has an estimated value of $1.7M covering 5,000 sq ft. Texas Health Presbyterian Hospital Allen is the property owner and Perkins Will is the design firm of record. The project was registered with TDLR on September 8, 2026.

Frequently Asked Questions

When will the Texas Health Allen Hospital renovation be finished?

The project is scheduled to finish in April 2027. Construction started in August 2026, and TDLR completed plan review in October 2026.

What is the cost of the NUC Med replacement project?

The estimated cost is $1,716,500. This equates to $343 per square foot for the 5,000 square feet of work involved.

Who is designing the Texas Health Allen Hospital renovation?

Perkins Will is the design firm of record. They have other registered projects in the area, including Redbird Dallas and Baylor Scott and White Medical Center - Grapevine.

What is Texas Health Allen NUC Med Replacement and Refresh?

Texas Health Allen NUC Med Replacement and Refresh is a renovation/alteration project at 1105 North central Expressway in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Equipment replacement in NUC Med area and interior finishes

Is Texas Health Allen NUC Med Replacement and Refresh open in Allen?

Texas Health Allen NUC Med Replacement and Refresh is still under construction in Allen, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is Texas Health Allen NUC Med Replacement and Refresh located?

Texas Health Allen NUC Med Replacement and Refresh is located at 1105 North central Expressway, Allen, TX, 75013, in Collin County.

Who is the owner or developer of Texas Health Allen NUC Med Replacement and Refresh?

Texas Health Presbyterian Hospital Allen is the property owner/developer of record for Texas Health Allen NUC Med Replacement and Refresh, per its TDLR project registration.

Who is the architect or design firm for Texas Health Allen NUC Med Replacement and Refresh?

Perkins Will is the design firm of record for Texas Health Allen NUC Med Replacement and Refresh, according to its TDLR filing.

How much does Texas Health Allen NUC Med Replacement and Refresh cost and how big is it?

Texas Health Allen NUC Med Replacement and Refresh has an estimated construction value of $1.7M and approximately 5,000 square feet (about $343/sqft), based on its TDLR filing.

Scope of Work

Equipment replacement in NUC Med area and interior finishes

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1105 North central Expressway, Allen, TX, 75013

Loading location map…
33.08061, -96.68386

Watch all construction in 75013 (Allen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.