Project intelligenceTDLR TABS2027000694New Construction
Funding type

This project is privately funded, on private land for private use.

New Building G- Phase 2B, Mitchell Buick GMC in San Angelo, TX

4105 Sherwood Way, San Angelo, TX, 76901

Opening ~Jan 2027Review Complete

New Building G- Phase 2B, Mitchell Buick GMC is a new construction project at 4105 Sherwood Way, San Angelo, in Tom Green County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $2.1M across about 4,177 sq ft.

Estimated project value
$2.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,177 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$503/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 10, 2026143 days across supplied datesJan 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    115 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About New Building G- Phase 2B, Mitchell Buick GMC

Mitchell Buick GMC is constructing a 4,177 sq ft wash bay building at 4105 Sherwood Way in San Angelo. Filed as New Building G- Phase 2B, this new construction project is estimated at $2,100,000, placing the cost at $503 per square foot.

The project is privately funded on private land for private use. Mitchell Michael D, Sr & Susan C are the owners of record, while KFW Architects serves as the design firm. Susan D Gregonis is the registered accessibility specialist for the filing. TDLR completed plan review in October 2026, and construction is scheduled to finish in January 2027, with work starting September 2026.

Project Scale and Context

This build is significantly larger and more expensive than typical new construction filings in the area. Among 438 TDLR-registered new construction filings in Tom Green County, the median estimated cost is $677,895 and the median size is 5,267 sq ft. This project’s cost is in the top quarter of that range, while its $503 per square foot is above the county median of $134. The scheduled build window of 143 days is shorter than the county median of 216 days.

KFW Architects has six other TDLR-registered projects totaling $27,200,000. These include a $15,000,000 project for Fannin Elementary School in San Angelo and a $2,000,000 project for Lake View High School. The firm also registered a $2,000,000 project for Michell Buick GMC in San Angelo, which is review complete.

The surrounding area, ZIP 76901, has a population of about 31,581 according to U.S. Census ACS 2023 five-year estimates. The median household income is $64,542, and there are 13,783 housing units. The median owner-occupied home value is $169,500, with housing predominantly owner-occupied. Tom Green County’s unemployment rate was 3.8 percent in July 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76901 (San Angelo)

One email per change. Unsubscribe in one click. Privacy.

New Building G- Phase 2B, Mitchell Buick GMC is a New Construction project located at 4105 Sherwood Way, San Angelo, TX 76901 in San Angelo, Texas. The project has an estimated value of $2.1M covering 4,177 sq ft. Mitchell Michael D, Sr & Susan C is the property owner and KFW Architects is the design firm of record. The project was registered with TDLR on September 10, 2026.

Frequently Asked Questions

Is Mitchell Buick GMC open?

The TDLR record indicates construction is scheduled to finish in January 2027. It does not confirm whether the business is open to the public.

What is the address of the new wash bay?

The new wash bay building is located at 4105 Sherwood Way, San Angelo, TX 76901, in Tom Green County.

How much is the project estimated to cost?

The total estimated cost for the 4,177 sq ft structure is $2,100,000, which works out to $503 per square foot.

Who is the architect for this project?

KFW Architects is the design firm of record for this new construction project filed with TDLR.

When did construction start?

Construction on the new wash bay building started in September 2026, following the completion of plan review.

What is New Building G- Phase 2B, Mitchell Buick GMC?

New Building G- Phase 2B, Mitchell Buick GMC is a new construction project at 4105 Sherwood Way in San Angelo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of (1) 4,177 sq ft Wash bay Bldg G

Is New Building G- Phase 2B, Mitchell Buick GMC open in San Angelo?

New Building G- Phase 2B, Mitchell Buick GMC is still under construction in San Angelo, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is New Building G- Phase 2B, Mitchell Buick GMC located?

New Building G- Phase 2B, Mitchell Buick GMC is located at 4105 Sherwood Way, San Angelo, TX, 76901, in Tom Green County.

Who is the owner or developer of New Building G- Phase 2B, Mitchell Buick GMC?

Mitchell Michael D, Sr & Susan C is the property owner/developer of record for New Building G- Phase 2B, Mitchell Buick GMC, per its TDLR project registration.

Who is the architect or design firm for New Building G- Phase 2B, Mitchell Buick GMC?

KFW Architects is the design firm of record for New Building G- Phase 2B, Mitchell Buick GMC, according to its TDLR filing.

How much does New Building G- Phase 2B, Mitchell Buick GMC cost and how big is it?

New Building G- Phase 2B, Mitchell Buick GMC has an estimated construction value of $2.1M and approximately 4,177 square feet (about $503/sqft), based on its TDLR filing.

Scope of Work

Construction of (1) 4,177 sq ft Wash bay Bldg G

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4105 Sherwood Way, San Angelo, TX, 76901

Loading location map…
31.44002, -100.48946

Watch all construction in 76901 (San Angelo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Angelo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.