Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
BISD - Shannon High School Demolition Master Plan in Haltom City, TX
6010 Walker Street, Haltom City, TX, 76117
BISD - Shannon High School Demolition Master Plan is a renovation/alteration project at 6010 Walker Street, Haltom City, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $5.0M across about 9,600 sq ft.
- Estimated project value
- $5.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 9,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $521/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 9 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
27 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
25 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
273 days after the preceding date shown.
Source: TDLR filing
View source record
📰About BISD - Shannon High School Demolition Master Plan
Birdville ISD is executing a $5,000,000 renovation and alteration project at Shannon High School, located at 6010 Walker Street in Haltom City. The scope involves the demolition of existing classrooms and gyms followed by the construction of new parking areas, covering a total area of 9,600 sq ft. This work is registered with TDLR under the filing name BISD - Shannon High School Demolition Master Plan.
TDLR completed plan review in October 2026 and construction is scheduled to finish in August 2027, with work starting November 2026. The project status is listed as Review Complete. The estimated cost of $5,000,000 translates to $521 per square foot, a figure above the county median of $79 per square foot for similar renovation and alteration filings in Tarrant County.
Project Scope and Design
IN2 Architecture, Inc. serves as the design firm of record for this project. The registered accessibility specialist is Glenn Thomas Comtois. The filing indicates that the project involves public funds, public land, or is a Federally funded roadway project.
Birdville ISD has six other TDLR-registered projects totaling $66,724,015, including work at Grace Hardeman ES in Watauga and the Birdville Administrative Complex in North Richland Hills. IN2 Architecture, Inc. has six other registered projects totaling $23,400,000, including the AISD Administration Building in Aubrey and the Dallas College Brookhaven Campus in Farmers Branch.
Local Context
The Haltom City area, ZIP code 76117, has a population of about 32,086 according to U.S. Census ACS 2023 five-year estimates. The median household income is $49,041, and the median owner-occupied home value is $185,300. The housing stock is an even mix of owner- and renter-occupied units. Tarrant County’s unemployment rate was 4.6 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76117 (Haltom City)
One email per change. Unsubscribe in one click. Privacy.
BISD - Shannon High School Demolition Master Plan is a Renovation/Alteration project located at 6010 Walker Street, Haltom City, TX 76117 in Haltom City, Texas. The project has an estimated value of $5.0M covering 9,600 sq ft. Birdville ISD is the property owner and IN2 Architecture, Inc. is the design firm of record. The project was registered with TDLR on September 10, 2026.
Frequently Asked Questions
When is construction starting?
Construction is scheduled to start in November 2026. TDLR completed plan review in October 2026, clearing the path for the work to begin at the Haltom City site.
What is the total estimated cost?
The estimated cost for the Shannon High School renovation and alteration is $5,000,000. This covers the demolition of existing structures and the construction of new parking areas.
Who is the design firm?
IN2 Architecture, Inc. is the design firm of record for this project. They are responsible for the architectural plans that passed TDLR review in October 2026.
Is the site in a flood zone?
It is classified as zone X on the National Flood Hazard Layer.
What is the square footage of the project?
The project covers 9,600 sq ft. This area includes the spaces designated for the demolition of classrooms and gyms and the new parking construction.
What is BISD - Shannon High School Demolition Master Plan?
BISD - Shannon High School Demolition Master Plan is a renovation/alteration project at 6010 Walker Street in Haltom City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of existing classrooms and gyms and construction of new parking areas.
Is BISD - Shannon High School Demolition Master Plan open in Haltom City?
BISD - Shannon High School Demolition Master Plan is still under construction in Haltom City, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is BISD - Shannon High School Demolition Master Plan located?
BISD - Shannon High School Demolition Master Plan is located at 6010 Walker Street, Haltom City, TX, 76117, in Tarrant County.
Who is the owner or developer of BISD - Shannon High School Demolition Master Plan?
Birdville ISD is the property owner/developer of record for BISD - Shannon High School Demolition Master Plan, per its TDLR project registration.
Who is the architect or design firm for BISD - Shannon High School Demolition Master Plan?
IN2 Architecture, Inc. is the design firm of record for BISD - Shannon High School Demolition Master Plan, according to its TDLR filing.
How much does BISD - Shannon High School Demolition Master Plan cost and how big is it?
BISD - Shannon High School Demolition Master Plan has an estimated construction value of $5.0M and approximately 9,600 square feet (about $521/sqft), based on its TDLR filing.
Scope of Work
Demolition of existing classrooms and gyms and construction of new parking areas.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6010 Walker Street, Haltom City, TX, 76117
Related Projects
Same Owner
$60.4M totalNearby Projects
Within 0.6 miWatch all construction in 76117 (Haltom City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Haltom City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.