Funding type
This project is privately funded, on private land for private use.
TIRR MH Dialysis EVS and Main Entry Relocation
1333 Moursund Street, Houston, TX, 77030
TIRR MH Dialysis EVS and Main Entry Relocation is a renovation/alteration project at 1333 Moursund Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $1.7M across about 3,100 sq ft.
- Estimated project value
- $1.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,100 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $550/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
36 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
146 days after the preceding date shown.
Source: TDLR filing
View source record
📰About TIRR MH Dialysis EVS and Main Entry Relocation
TIRR Memorial Hermann is executing a $1,705,000 renovation at 1333 Moursund Street in Houston, Harris County. The filing, titled TIRR MH Dialysis EVS and Main Entry Relocation, details the relocation of hospital support spaces and the entry lobby to prepare for future expansion. This work covers 3,100 square feet of existing space, representing a significant alteration to the facility's current layout and circulation paths.
The project was registered with TDLR in September 2026, with construction scheduled to begin in October 2026. The filing indicates a completion date targeted for March 2027. This timeline creates a scheduled build window of 146 days, which is longer than the county median of 92 days for similar renovation and alteration projects in Harris County. The extended duration reflects the complexity of moving critical support functions and the main entrance within an active healthcare environment.
Cost and Design Context
Heitkamp Swift Architects serves as the design firm of record, while William T Winning is the registered accessibility specialist. The estimated cost of $1,705,000 places this project in the top quarter of costs for renovation and alteration filings in the county. The computed cost of $550 per square foot is above the county median of $80 per square foot. These figures align with the specialized nature of relocating dialysis equipment and main entry infrastructure, which requires precise coordination to maintain patient safety and operational continuity during the transition.
The project is privately funded on private land for private use. TIRR Memorial Hermann has one other registered project, the TIRR Research Building, which is closed. Heitkamp Swift Architects has six other registered projects in the state, including Texas City ED and Valley Regional Medical Center. The area profile for ZIP 77030 indicates a population of about 12,976, with a median household income of $79,415. The Harris County unemployment rate was 5.2 percent in July 2026.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77030 (Houston)
One email per change. Unsubscribe in one click. Privacy.
TIRR MH Dialysis EVS and Main Entry Relocation is a Renovation/Alteration project located at 1333 Moursund Street, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $1.7M covering 3,100 sq ft. TIRR Memorial Hermann is the property owner and Heitkamp Swift Architects is the design firm of record. The project was registered with TDLR on September 15, 2026.
Frequently Asked Questions
What is the scope of the TIRR Memorial Hermann renovation?
The scope includes the relocation of hospital support spaces and the entry lobby to facilitate future expansion. The work covers 3,100 square feet and is classified as a renovation and alteration project.
When is the project expected to be completed?
Construction is scheduled to start in October 2026. The filing lists a completion date targeted for March 2027, following the initial registration in September 2026.
Who is the design firm for this project?
Heitkamp Swift Architects is the design firm of record. William T Winning is the registered accessibility specialist listed on the filing for this renovation.
Is the TIRR Memorial Hermann facility open?
The TDLR record tracks construction status, not operational hours. The project is registered with construction starting in October 2026 and completion targeted for March 2027. No operational status is provided in the filing.
What is TIRR MH Dialysis EVS and Main Entry Relocation?
TIRR MH Dialysis EVS and Main Entry Relocation is a renovation/alteration project at 1333 Moursund Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Relocation of hospital support spaces and entry lobby for future expansion.
Is TIRR MH Dialysis EVS and Main Entry Relocation open in Houston?
TIRR MH Dialysis EVS and Main Entry Relocation is still under construction in Houston, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is TIRR MH Dialysis EVS and Main Entry Relocation located?
TIRR MH Dialysis EVS and Main Entry Relocation is located at 1333 Moursund Street, Houston, TX, 77030, in Harris County.
Who is the owner or developer of TIRR MH Dialysis EVS and Main Entry Relocation?
TIRR Memorial Hermann is the property owner/developer of record for TIRR MH Dialysis EVS and Main Entry Relocation, per its TDLR project registration.
Who is the architect or design firm for TIRR MH Dialysis EVS and Main Entry Relocation?
Heitkamp Swift Architects is the design firm of record for TIRR MH Dialysis EVS and Main Entry Relocation, according to its TDLR filing.
How much does TIRR MH Dialysis EVS and Main Entry Relocation cost and how big is it?
TIRR MH Dialysis EVS and Main Entry Relocation has an estimated construction value of $1.7M and approximately 3,100 square feet (about $550/sqft), based on its TDLR filing.
Scope of Work
Relocation of hospital support spaces and entry lobby for future expansion.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1333 Moursund Street, Houston, TX, 77030
Related Projects
Same Owner
$1.9M totalNearby Projects
Within 1 kmWatch all construction in 77030 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.