SH 21 (CSJ: 0116-03-074) in Caldwell, TX
From: Stone St To: SH 36, Caldwell, TX, 77836
SH 21 (CSJ: 0116-03-074) is a new construction project at From: Stone St To: SH 36, Caldwell, in Burleson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $279K across about 17,523 sq ft.
- Estimated project value
- $279K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 17,523 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $16/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
13 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
306 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
395 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SH 21 (CSJ: 0116-03-074)
The TxDOT District: Bryan is undertaking the construction of pedestrian infrastructure along a stretch of State Highway 21 in Caldwell, Texas. This new construction project, identified by the filing number Csj: 0116-03-074, focuses on improving walkability and safety for residents and travelers in Burleson County. The scope includes grading, the installation of sidewalks, curb ramps, and traffic signals to create a cohesive pedestrian network.
The work covers a total area of 17,523 sq ft with an estimated cost of $279,487. This valuation places the project at $16 per sq ft, a figure that is below the county median of $168 for similar new construction filings. The lower cost per square foot reflects the specific nature of the infrastructure work, which prioritizes functional accessibility elements over large-scale building development.
Project Timeline and Status
The project was registered with TDLR in September 2026. According to the official filing, plan review is pending, and the construction phase is scheduled to begin in August 2027. The entire project is targeted for August 2028. This timeline represents a scheduled build window of 395 days, which is longer than the 182-day median build window for comparable projects in Burleson County.
The area profile for this ZIP code indicates a population of about 12,469 people and a median household income of $79,567. The housing stock consists of 5,990 units, predominantly owner-occupied, with a median home value of $199,000. These Census estimates provide context for the community that will benefit from the new pedestrian infrastructure.
TxDOT District: Bryan has other registered projects across the state, including work in Thorndale, Navasota, Brenham, Bryan, and College Station. The total value of these six other projects is $15,335,621. This Caldwell project is one of many initiatives by the district to improve roadway safety and accessibility throughout its service area.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77836 (Caldwell)
One email per change. Unsubscribe in one click. Privacy.
SH 21 (CSJ: 0116-03-074) is a New Construction project located at From: Stone St To: SH 36, Caldwell, TX 77836 in Caldwell, Texas. The project has an estimated value of $279K covering 17,523 sq ft. TxDOT District: Bryan is the property owner. The project was registered with TDLR on September 16, 2026.
Frequently Asked Questions
What is the scope of work for this project?
The scope includes the construction of pedestrian infrastructure consisting of grading, sidewalks, curb ramps, and signals to improve accessibility.
Who is the owner of record?
The owner of record for this project is TxDOT District: Bryan, which manages the construction and funding.
What is the estimated cost?
The estimated cost for the construction of the pedestrian infrastructure is $279,487, which is below the county median.
When is construction scheduled to start?
Construction is scheduled to start in August 2027, following the registration and plan review phases.
What is SH 21 (CSJ: 0116-03-074)?
SH 21 (CSJ: 0116-03-074) is a new construction project at From: Stone St To: SH 36 in Caldwell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: For the construction of pedestrian infrastructure consisting of grading, sidewalks, curb ramps and signals.
Is SH 21 (CSJ: 0116-03-074) open in Caldwell?
SH 21 (CSJ: 0116-03-074) is still under construction in Caldwell, TX, with an estimated completion of Aug 2028 according to its TDLR registration.
Where is SH 21 (CSJ: 0116-03-074) located?
SH 21 (CSJ: 0116-03-074) is located at From: Stone St To: SH 36, Caldwell, TX, 77836, in Burleson County.
Who is the owner or developer of SH 21 (CSJ: 0116-03-074)?
TxDOT District: Bryan is the property owner/developer of record for SH 21 (CSJ: 0116-03-074), per its TDLR project registration.
How much does SH 21 (CSJ: 0116-03-074) cost and how big is it?
SH 21 (CSJ: 0116-03-074) has an estimated construction value of $279K and approximately 17,523 square feet (about $16/sqft), based on its TDLR filing.
Scope of Work
For the construction of pedestrian infrastructure consisting of grading, sidewalks, curb ramps and signals.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: Stone St To: SH 36, Caldwell, TX, 77836
Related Projects
Watch all construction in 77836 (Caldwell)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Caldwell?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.