Project intelligenceTDLR TABS2027001236Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Smoothie King Tenant Buildout in Dallas, TX

9411 Webb Chapel Rd, Suite 104, Dallas, TX, 75200

Opening ~Dec 2026Project Registered

Smoothie King Tenant Buildout is a renovation/alteration project at 9411 Webb Chapel Rd, Suite 104, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $250K across about 1,590 sq ft.

Estimated project value
$250K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,590 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$157/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 17, 202697 days across supplied datesDec 23, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    69 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Smoothie King Tenant Buildout

Smoothie King is undergoing a tenant buildout at 9411 Webb Chapel Rd, Suite 104, in Dallas. The project involves the interior renovation of a 1,590 sq ft space within Dallas County. This work is registered with TDLR and is targeted for December 2026.

The scope of work includes the demolition of existing partitions, finishes, and equipment to prepare the previously occupied space for new construction. New partitions, finishes, and equipment will be installed to accommodate the new tenant. The estimated cost for this renovation/alteration is $250,000.

Project Details and Ownership

Webb Chapel Blends LLC is the owner of record for this development. The project is privately funded on private land for private use. Marcela Abadi Rhoads is the registered accessibility specialist associated with the filing. The construction start date listed in the filing is October 2026.

The estimated cost of $250,000 is close to the county median for renovation/alteration filings in Dallas County, which is $249,000. The project’s size of 1,590 sq ft is below the county median of 4,226 sq ft. The calculated cost per square foot is $157, which is above the county median of $72 per square foot.

The scheduled build window is 69 days, which is shorter than the county median of 92 days for similar projects. The Dallas County unemployment rate in July 2026 was 3.3 percent.

Plan review is pending, and the project status is listed as Project Registered. The registration with TDLR occurred in September 2026. The completion date on the filing is December 2026, aligning with the targeted timeline for the renovation work.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75200 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Smoothie King Tenant Buildout is a Renovation/Alteration project located at 9411 Webb Chapel Rd, Suite 104, Dallas, TX 75200 in Dallas, Texas. The project has an estimated value of $250K covering 1,590 sq ft. Webb Chapel Blends LLC is the property owner. The project was registered with TDLR on September 17, 2026.

Frequently Asked Questions

Is the Smoothie King location open?

The TDLR record indicates the project is under renovation with a completion date targeted for December 2026. The filing does not confirm that the business is open or operating.

What is the address of this project?

The project is located at 9411 Webb Chapel Rd, Suite 104, Dallas, TX 75200.

Who owns the property?

Webb Chapel Blends LLC is listed as the owner/developer of record for this tenant buildout.

What is the estimated cost?

The estimated cost for the interior renovation and tenant buildout is $250,000.

When is the project expected to finish?

The filing states the completion date is December 2026, and the project is targeted for December 2026.

What is Smoothie King Tenant Buildout?

Smoothie King Tenant Buildout is a renovation/alteration project at 9411 Webb Chapel Rd, Suite 104 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation, tenant buildout, for a new tenant to occupy a previously occupied space. Scope consist of demo of existing partitions, finishes, and equipment before new construction of new partitions, finishes, and equipment.

Is Smoothie King Tenant Buildout open in Dallas?

Smoothie King Tenant Buildout is still under construction in Dallas, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Smoothie King Tenant Buildout located?

Smoothie King Tenant Buildout is located at 9411 Webb Chapel Rd, Suite 104, Dallas, TX, 75200, in Dallas County.

Who is the owner or developer of Smoothie King Tenant Buildout?

Webb Chapel Blends LLC is the property owner/developer of record for Smoothie King Tenant Buildout, per its TDLR project registration.

How much does Smoothie King Tenant Buildout cost and how big is it?

Smoothie King Tenant Buildout has an estimated construction value of $250K and approximately 1,590 square feet (about $157/sqft), based on its TDLR filing.

Scope of Work

Interior renovation, tenant buildout, for a new tenant to occupy a previously occupied space. Scope consist of demo of existing partitions, finishes, and equipment before new construction of new partitions, finishes, and equipment.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9411 Webb Chapel Rd, Suite 104, Dallas, TX, 75200

Loading location map…
32.86117, -96.85887

Watch all construction in 75200 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.