Project intelligenceTDLR TABS2027001280New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Cunningham Road HROM

2201 Dottie Lynn Parkway Suite 119, Fort Worth, TX, 76120

Opening ~Mar 2028Project Registered

Cunningham Road HROM is a new construction project at 2201 Dottie Lynn Parkway Suite 119, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2028. The project has an estimated value of $7.9M across about 162,500 sq ft.

Estimated project value
$7.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
162,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$49/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 17, 2026547 days across supplied datesMar 17, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    366 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Cunningham Road HROM

Cunningham Road HROM is a new construction project by the City of Fort Worth with an estimated cost of $7,900,000. The initiative addresses frequent flooding on Cunningham Road by redesigning and widening the roadway. A key component of the scope is the construction of a bridge over the local creek to improve safety and functionality in Tarrant County.

The project covers an area of 162,500 square feet. At an estimated cost of $49 per square foot, this figure is below the Tarrant County median of $120 for similar new construction filings. The total budget places the project in the top quarter of cost for its type in the county, reflecting the scale of the civil engineering work involved in roadway expansion.

James DeOtte Engineering Inc serves as the design firm of record. Michael J Love is the registered accessibility specialist for the filing. The project involves public funds and is situated on public land, meeting standards for federally funded roadway projects.

Timeline and Status

The project was registered with TDLR in September 2026. Construction is scheduled to begin in March 2027, following a pending plan review. Completion is targeted for March 2028. This scheduled build window of 366 days is longer than the county median of 214 days, allowing time for the complex tasks of road widening and bridge construction to proceed methodically.

The City of Fort Worth has other registered projects, including the Fort Worth Zoo and McLeland Tennis Center, but Cunningham Road HROM stands as a distinct civil works project. The focus remains on enhancing local infrastructure resilience through specific improvements to the road and bridge infrastructure in the Fort Worth area.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76120 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Cunningham Road HROM is a New Construction project located at 2201 Dottie Lynn Parkway Suite 119, Fort Worth, TX 76120 in Fort Worth, Texas. The project has an estimated value of $7.9M covering 162,500 sq ft. City of Fort Worth is the property owner and James DeOtte Engineering Inc is the design firm of record. The project was registered with TDLR on September 17, 2026.

Frequently Asked Questions

When is the Cunningham Road HROM project expected to be finished?

Completion is targeted for March 2028. Construction is scheduled to start in March 2027, with plan review pending.

Who is the owner of the Cunningham Road HROM project?

The owner of record is the City of Fort Worth. The project involves public funds and is situated on public land in Tarrant County.

What is the primary purpose of the Cunningham Road HROM construction?

The project aims to remedy frequent flooding by redesigning and widening the road. It also includes the construction of a bridge over the local creek.

Is the Cunningham Road HROM project currently open to the public?

No, the project is under construction. The status is Project Registered, with construction scheduled to begin in March 2027.

How does the cost of Cunningham Road HROM compare to other Tarrant County filings?

The estimated cost of $7,900,000 is above the county median for new construction. The cost per square foot of $49 is below the county median of $120.

What is Cunningham Road HROM?

Cunningham Road HROM is a new construction project at 2201 Dottie Lynn Parkway Suite 119 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Cunningham road is currently subjected to relatively frequent flooding, so to remedy that this project is to redesign and widen the road and construct a bridge over the creek.

Is Cunningham Road HROM open in Fort Worth?

Cunningham Road HROM is still under construction in Fort Worth, TX, with an estimated completion of Mar 2028 according to its TDLR registration.

Where is Cunningham Road HROM located?

Cunningham Road HROM is located at 2201 Dottie Lynn Parkway Suite 119, Fort Worth, TX, 76120, in Tarrant County.

Who is the owner or developer of Cunningham Road HROM?

City of Fort Worth is the property owner/developer of record for Cunningham Road HROM, per its TDLR project registration.

Who is the architect or design firm for Cunningham Road HROM?

James DeOtte Engineering Inc is the design firm of record for Cunningham Road HROM, according to its TDLR filing.

How much does Cunningham Road HROM cost and how big is it?

Cunningham Road HROM has an estimated construction value of $7.9M and approximately 162,500 square feet (about $49/sqft), based on its TDLR filing.

Scope of Work

Cunningham road is currently subjected to relatively frequent flooding, so to remedy that this project is to redesign and widen the road and construct a bridge over the creek.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2201 Dottie Lynn Parkway Suite 119, Fort Worth, TX, 76120

32.74914, -97.17174

Watch all construction in 76120 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.