Camp Aranzazu - Health Center Expansion
5420 FM 1781, Rockport, TX, 78382
Camp Aranzazu - Health Center Expansion is a additions to existing building project at 5420 FM 1781, Rockport, in Aransas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $940K across about 5,989 sq ft.
- Estimated project value
- $940K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,989 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $157/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
78 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
244 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Camp Aranzazu - Health Center Expansion
Camp Aranzazu Health Center is expanding its facility at 5420 FM 1781 in Rockport, Texas, with a project registered under the name Camp Aranzazu - Health Center Expansion. The work involves two additions to the existing building, totaling 5,989 sq ft of new space. The filing identifies the scope as including two bedrooms with bathrooms, a small kitchen and work area, a medication storage room, laundry facilities, and an exam room. Minor site work and a septic system are also part of the construction plan.
The estimated cost for this expansion is $940,000, which works out to $157 per square foot. This figure is close to the county median of $167 per square foot for similar additions to existing buildings in Aransas County. The total cost is above the county median of $250,000 for this project type, placing it in the top quarter of recent filings. The scheduled build window is 244 days, which is longer than the county median of 184 days for comparable projects.
Project Details and Status
Camp Aranzazu is the owner of record, and RMA Architects is the design firm listed on the filing. Holly Respondek is the registered accessibility specialist for this project. The project was registered with TDLR in September 2026. According to the filing, construction is planned to start in December 2026. The completion date on the filing is August 2027, and the project is targeted for August 2027. The current TDLR status is Project Registered, with plan review pending.
The site is located in Aransas County, within FEMA Special Flood Hazard Area zone AE. The project is privately funded on private land for private use. Camp Aranzazu has one other TDLR-registered project in Rockport valued at $775,000, which is closed. RMA Architects has six other registered projects totaling $9,691,000, including facilities in Victoria, Cuero, Seadrift, Corpus Christi, and Yoakum.
Rockport is in ZIP code 78382, which has a population of about 20,043 according to U.S. Census ACS 2023 estimates. The median household income in this area is $63,434, and the median owner-occupied home value is $238,200. Housing in this ZIP code is predominantly owner-occupied. The Aransas County unemployment rate was 5.2 percent in July 2026, higher than a year earlier.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78382 (Rockport)
One email per change. Unsubscribe in one click. Privacy.
Camp Aranzazu - Health Center Expansion is a Additions to Existing Building project located at 5420 FM 1781, Rockport, TX 78382 in Rockport, Texas. The project has an estimated value of $940K covering 5,989 sq ft. Camp Aranzazu is the property owner and RMA Architects is the design firm of record. The project was registered with TDLR on September 18, 2026.
Frequently Asked Questions
Is Camp Aranzazu Health Center open for business?
The TDLR record shows the project is registered and targeted for August 2027. It does not confirm whether the existing facility is open or when the new expansion will open.
What is the total cost of the expansion?
The estimated cost for the Camp Aranzazu Health Center expansion is $940,000. This includes two additions, site work, and a septic system.
Who is the architect for this project?
RMA Architects is the design firm of record for the Camp Aranzazu Health Center expansion in Rockport.
When is construction scheduled to finish?
The filing lists August 2027 as the completion date, and the project is targeted for August 2027.
Is the site in a flood zone?
Yes, the site is inside a FEMA Special Flood Hazard Area, specifically zone AE, according to the National Flood Hazard Layer.
What is Camp Aranzazu - Health Center Expansion?
Camp Aranzazu - Health Center Expansion is a additions to existing building project at 5420 FM 1781 in Rockport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Two additions to the existing health center facility featuring 2 bedrooms with bathrooms, small kitchen/work area, medication storage room, laundry and exam room. Additional minor site work and septic system included
Is Camp Aranzazu - Health Center Expansion open in Rockport?
Camp Aranzazu - Health Center Expansion is still under construction in Rockport, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Camp Aranzazu - Health Center Expansion located?
Camp Aranzazu - Health Center Expansion is located at 5420 FM 1781, Rockport, TX, 78382, in Aransas County.
Who is the owner or developer of Camp Aranzazu - Health Center Expansion?
Camp Aranzazu is the property owner/developer of record for Camp Aranzazu - Health Center Expansion, per its TDLR project registration.
Who is the architect or design firm for Camp Aranzazu - Health Center Expansion?
RMA Architects is the design firm of record for Camp Aranzazu - Health Center Expansion, according to its TDLR filing.
How much does Camp Aranzazu - Health Center Expansion cost and how big is it?
Camp Aranzazu - Health Center Expansion has an estimated construction value of $940K and approximately 5,989 square feet (about $157/sqft), based on its TDLR filing.
Scope of Work
Two additions to the existing health center facility featuring 2 bedrooms with bathrooms, small kitchen/work area, medication storage room, laundry and exam room. Additional minor site work and septic system included
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5420 FM 1781, Rockport, TX, 78382
Related Projects
Same Owner
$1.7M totalNearby Projects
Within 1 kmWatch all construction in 78382 (Rockport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rockport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.