Project intelligenceTDLR TABS2027001529Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

PNC Bank ADA Remediation Design - E485

3545 Gulf Fwy., Dickinson, TX, 77539

Opening ~Jan 2027Project Registered

PNC Bank ADA Remediation Design - E485 is a renovation/alteration project at 3545 Gulf Fwy., Dickinson, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $425K across about 4,000 sq ft.

Estimated project value
$425K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$106/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 21, 2026131 days across supplied datesJan 30, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    90 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About PNC Bank ADA Remediation Design - E485

PNC Bank ADA Remediation Design - E485 Dickinson is a renovation and alteration project at 3545 Gulf Fwy., Dickinson, TX 77539. The scope of work involves replacing the sidewalk and providing concrete ADA parking. The project covers an area of 4,000 sq ft with an estimated cost of $425,000.

The facility is situated in Galveston County and falls within a FEMA Special Flood Hazard Area, specifically zone AE. The project is privately funded and conducted on private land for private use. Michael Baker International serves as the design firm of record, while Clinton P Ryan is the registered accessibility specialist.

Project Status and Timeline

The project was registered with TDLR in September 2026. Plan review is pending, and the filing indicates a construction start date of November 2026. Completion is targeted for January 2027. This scheduled build window of 90 days is close to the county median of 120 days for similar renovation and alteration filings.

The estimated cost of $425,000 places the project above the median estimated cost of $250,000 for this type of work in Galveston County. The cost per square foot is $106, which is above the county median of $74. The project size of 4,000 sq ft is near the county median size of 3,956 sq ft.

PNC Bank, N.A. has six other TDLR-registered projects totaling $2,075,000 in various Texas cities, including Dallas, Beaumont, and Plano. Michael Baker International has also worked on six other TDLR-registered projects totaling $2,175,000. The Dickinson project is part of a broader portfolio of accessibility improvements managed by the bank and its design partners.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77539 (Dickinson)

One email per change. Unsubscribe in one click. Privacy.

PNC Bank ADA Remediation Design - E485 is a Renovation/Alteration project located at 3545 Gulf Fwy., Dickinson, TX 77539 in Dickinson, Texas. The project has an estimated value of $425K covering 4,000 sq ft. PNC Bank, N.A. is the property owner and Michael Baker International is the design firm of record. The project was registered with TDLR on September 21, 2026.

Frequently Asked Questions

What is the scope of the PNC Bank Dickinson project?

The work includes replacing the sidewalk and providing concrete ADA parking at the 3545 Gulf Fwy. location.

When is the PNC Bank Dickinson renovation expected to be finished?

The project is targeted for January 2027, with construction starting in November 2026.

Who is the design firm for this project?

Michael Baker International is the design firm of record for the PNC Bank Dickinson ADA remediation.

Is the PNC Bank Dickinson branch open?

The TDLR record documents construction status and does not indicate business operating hours or opening status.

What is PNC Bank ADA Remediation Design - E485?

PNC Bank ADA Remediation Design - E485 is a renovation/alteration project at 3545 Gulf Fwy. in Dickinson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacing sidewalk and providing Concrete ADA parking

Is PNC Bank ADA Remediation Design - E485 open in Dickinson?

PNC Bank ADA Remediation Design - E485 is still under construction in Dickinson, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is PNC Bank ADA Remediation Design - E485 located?

PNC Bank ADA Remediation Design - E485 is located at 3545 Gulf Fwy., Dickinson, TX, 77539, in Galveston County.

Who is the owner or developer of PNC Bank ADA Remediation Design - E485?

PNC Bank, N.A. is the property owner/developer of record for PNC Bank ADA Remediation Design - E485, per its TDLR project registration.

Who is the architect or design firm for PNC Bank ADA Remediation Design - E485?

Michael Baker International is the design firm of record for PNC Bank ADA Remediation Design - E485, according to its TDLR filing.

How much does PNC Bank ADA Remediation Design - E485 cost and how big is it?

PNC Bank ADA Remediation Design - E485 has an estimated construction value of $425K and approximately 4,000 square feet (about $106/sqft), based on its TDLR filing.

Scope of Work

Replacing sidewalk and providing Concrete ADA parking

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3545 Gulf Fwy., Dickinson, TX, 77539

29.44919, -95.07697

Watch all construction in 77539 (Dickinson)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dickinson?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.