Bridgeland Central Josey Lake Trail Extension Site Improvements

20100 Bridgeland Creek Parkway, Cypress, TX, 77433

Opening ~Apr 2027Project Registered

Bridgeland Central Josey Lake Trail Extension Site Improvements is a new construction project at 20100 Bridgeland Creek Parkway, Cypress, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $2.5M across about 239,580 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
239,580 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$10/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 22, 2026195 days across supplied datesApr 5, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Bridgeland Central Josey Lake Trail Extension Site Improvements

Bridgeland Central Josey Lake Trail Extension Site Improvements is a new construction project located at 20100 Bridgeland Creek Parkway in Cypress, Texas. The site covers 239,580 square feet of Harris County land, with an estimated cost of $2,500,000. This project is registered with TDLR and involves public funds, public land, or a Federally funded roadway component.

The scope of work includes concrete paving, enhanced concrete paving, a concrete seat wall, and site grading. These elements suggest infrastructure improvements focused on trail access and site preparation. The project was registered with TDLR in September 2026, with construction start scheduled for November 2026. Completion is targeted for April 2027.

Project Context and Comparison

In Harris County, the median estimated cost for new construction filings is $750,000. This project’s $2,500,000 estimate is above that median, placing it in the top quarter of similar filings. The median size for new construction in the county is 9,000 square feet, while this project is significantly larger at 239,580 square feet. The median cost per square foot in the county is $88, whereas this project is estimated at $10 per square foot, which is below the county median.

Bridgeland Development is the owner of record and has six other TDLR-registered projects in the area, totaling $27,050,000. These include the Bridgeland Prairieland Section 45 Amenity and Neighborhood Park, valued at $20,000,000, and several other landscape and amenity projects in Cypress. Clark Condon is the design firm of record for this project and has six other TDLR-registered projects totaling $27,523,964, including developments in Katy, Cypress, and Richmond.

Robert W Green is the registered accessibility specialist for this project. The construction window is scheduled for 154 days, which is shorter than the county median of 219 days for new construction projects. The area profile for ZIP code 77433, based on U.S. Census ACS 2023 five-year estimates, shows a population of about 112,211, a median household income of $137,348, and a median owner-occupied home value of $384,400.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77433 (Cypress)

One email per change. Unsubscribe in one click. Privacy.

Bridgeland Central Josey Lake Trail Extension Site Improvements is a New Construction project located at 20100 Bridgeland Creek Parkway, Cypress, TX 77433 in Cypress, Texas. The project has an estimated value of $2.5M covering 239,580 sq ft. Bridgeland Development is the property owner and Clark Condon is the design firm of record. The project was registered with TDLR on September 22, 2026.

Frequently Asked Questions

What is the status of the Bridgeland Central Josey Lake Trail Extension project?

The project was registered with TDLR in September 2026. Construction is scheduled to start in November 2026, and completion is targeted for April 2027.

Who is the owner and design firm for this project?

Bridgeland Development is the owner of record, and Clark Condon is the design firm of record for the project.

What is included in the scope of work?

The scope includes concrete paving, enhanced concrete paving, a concrete seat wall, and site grading.

Is the project open to the public?

The project is under construction and not yet open. Completion is targeted for April 2027.

What is Bridgeland Central Josey Lake Trail Extension Site Improvements?

Bridgeland Central Josey Lake Trail Extension Site Improvements is a new construction project at 20100 Bridgeland Creek Parkway in Cypress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete Paving, Enhanced Concrete Paving, Concrete Seat wall, Site Grading

Is Bridgeland Central Josey Lake Trail Extension Site Improvements open in Cypress?

Bridgeland Central Josey Lake Trail Extension Site Improvements is still under construction in Cypress, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is Bridgeland Central Josey Lake Trail Extension Site Improvements located?

Bridgeland Central Josey Lake Trail Extension Site Improvements is located at 20100 Bridgeland Creek Parkway, Cypress, TX, 77433, in Harris County.

Who is the owner or developer of Bridgeland Central Josey Lake Trail Extension Site Improvements?

Bridgeland Development is the property owner/developer of record for Bridgeland Central Josey Lake Trail Extension Site Improvements, per its TDLR project registration.

Who is the architect or design firm for Bridgeland Central Josey Lake Trail Extension Site Improvements?

Clark Condon is the design firm of record for Bridgeland Central Josey Lake Trail Extension Site Improvements, according to its TDLR filing.

How much does Bridgeland Central Josey Lake Trail Extension Site Improvements cost and how big is it?

Bridgeland Central Josey Lake Trail Extension Site Improvements has an estimated construction value of $2.5M and approximately 239,580 square feet (about $10/sqft), based on its TDLR filing.

Scope of Work

Concrete Paving, Enhanced Concrete Paving, Concrete Seat wall, Site Grading

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20100 Bridgeland Creek Parkway, Cypress, TX, 77433

29.93687, -95.74076

Watch all construction in 77433 (Cypress)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.