JR Phase 7 Section 51 & 55 Landscape
Jordan Crossing Blvd., Fulshear, TX, 77441
JR Phase 7 Section 51 & 55 Landscape is a new construction project at Jordan Crossing Blvd., Fulshear, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.3M across about 1 sq ft.
- Estimated project value
- $1.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1260.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
291 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
3 days after the preceding date shown.
Source: TDLR filing
View source record
📰About JR Phase 7 Section 51 & 55 Landscape
Open Space Landscape is a new construction project located on Jordan Crossing Blvd. in Fulshear, Texas. Filed under the specific name JR Phase 7 Section 51 & 55 Landscape, the work involves the installation of concrete trails, grading, grassing, irrigation, and landscape improvements. The project is registered with TDLR and is targeted for September 2026, with a scheduled start date of December 2025.
The estimated cost for this development is $1,260,000. This figure is above the county median for new construction filings in Fort Bend County, which stands at $700,000. The scheduled build window for this project is 294 days, a period longer than the county median of 199 days.
Ownership and Design
Fort Bend Jordan Ranch LP is the owner and developer of record for this project. The design firm of record is SWA, a firm that has six other TDLR-registered projects totaling $3,468,900 in the region. The registered accessibility specialist for the project is Laura Fulkerson. The filing indicates that the project involves public funds, public land, or is a Federally funded roadway project.
Fort Bend Jordan Ranch LP has six other TDLR-registered projects in the area, with a combined total value of $7,658,859. These other projects include various landscape and commercial developments in Fulshear, with statuses ranging from project registered to review complete. The presence of multiple registered projects under the same owner suggests an ongoing development effort in the Jordan Ranch area.
The project is located in ZIP code 77441, which has a population of about 32,905. The median household income for this area is $177,591, and the median owner-occupied home value is $557,300. Housing in this ZIP code is predominantly owner-occupied. The Fort Bend County unemployment rate was 5 percent in July 2026, which is higher than a year earlier.
The project was registered with TDLR in September 2026. Plan review is pending, and the completion date on the filing is September 2026. The scope of work is specific to landscape and trail infrastructure, rather than building construction, which explains the low square footage figure of 1 sq ft listed in the filing. The project is part of a larger development initiative by Fort Bend Jordan Ranch LP in Fulshear.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77441 (Fulshear)
One email per change. Unsubscribe in one click. Privacy.
JR Phase 7 Section 51 & 55 Landscape is a New Construction project located at Jordan Crossing Blvd., Fulshear, TX 77441 in Fulshear, Texas. The project has an estimated value of $1.3M covering 1 sq ft. Fort Bend Jordan Ranch LP is the property owner and SWA is the design firm of record. The project was registered with TDLR on September 25, 2026.
Frequently Asked Questions
What is the scope of work for Open Space Landscape in Fulshear?
The scope includes concrete trails, grading, grassing, irrigation, and landscape improvements. It is a new construction project focused on outdoor infrastructure rather than building structures.
Who is the developer and design firm for this project?
The developer of record is Fort Bend Jordan Ranch LP. The design firm of record is SWA, which has other registered projects in the region.
When is the project targeted for completion?
The project is targeted for September 2026. The construction start date per the filing is December 2025, and plan review is pending.
Is the project located in a flood zone?
It is designated as zone X according to the FEMA National Flood Hazard Layer.
What is the estimated cost of the project?
The estimated cost is $1,260,000. This is above the county median for new construction filings in Fort Bend County, which is $700,000.
What is JR Phase 7 Section 51 & 55 Landscape?
JR Phase 7 Section 51 & 55 Landscape is a new construction project at Jordan Crossing Blvd. in Fulshear, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete trails, grading, grassing, irrigation and landscape.
Is JR Phase 7 Section 51 & 55 Landscape open in Fulshear?
JR Phase 7 Section 51 & 55 Landscape was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is JR Phase 7 Section 51 & 55 Landscape located?
JR Phase 7 Section 51 & 55 Landscape is located at Jordan Crossing Blvd., Fulshear, TX, 77441, in Fort Bend County.
Who is the owner or developer of JR Phase 7 Section 51 & 55 Landscape?
Fort Bend Jordan Ranch LP is the property owner/developer of record for JR Phase 7 Section 51 & 55 Landscape, per its TDLR project registration.
Who is the architect or design firm for JR Phase 7 Section 51 & 55 Landscape?
SWA is the design firm of record for JR Phase 7 Section 51 & 55 Landscape, according to its TDLR filing.
How much does JR Phase 7 Section 51 & 55 Landscape cost and how big is it?
JR Phase 7 Section 51 & 55 Landscape has an estimated construction value of $1.3M and approximately 1 square feet (about $1260.00K/sqft), based on its TDLR filing.
Scope of Work
Concrete trails, grading, grassing, irrigation and landscape.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Jordan Crossing Blvd., Fulshear, TX, 77441
Related Projects
Same Owner
$3.9M totalNearby Projects
Within 1 kmWatch all construction in 77441 (Fulshear)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Fulshear?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.