Project intelligenceTDLR TABS2027002394New Construction
Funding type

This project is privately funded, on private land for private use.

Storage in Bastrop, TX

816 FM 1209, Bastrop, TX, 78602

Opening ~May 2027Project Registered

Storage is a new construction project at 816 FM 1209, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $7.0M across about 36,000 sq ft.

Estimated project value
$7.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
36,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$194/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 30, 2026240 days across supplied datesMay 28, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    214 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Storage

SpaceX is developing a new 36,000-square-foot storage facility at 816 FM 1209 in Bastrop, Texas. The project, identified as BA03 in TDLR records, represents a significant private investment with an estimated cost of $7,000,000.

The registered accessibility specialist for this filing is Robert Ronson. The project was registered with TDLR in September 2026, marking the formal start of the regulatory process. According to the filing, construction is scheduled to begin in October 2026. The current status indicates that plan review is pending, and the project is targeted for May 2027.

Project Scale and Context

At $194 per square foot, this project’s cost per unit area is above the county median of $156 for similar new construction filings. The total estimated cost places this development in the top quarter of Bastrop County projects by value. For comparison, the median estimated cost for new construction in the county is $1,000,000, with a median size of 10,650 square feet. The scheduled build window of 214 days is close to the county median of 245 days.

SpaceX has six other TDLR-registered projects totaling $290,750,000. These include BA01 and Bap1 in Bastrop, both with review complete, as well as the large Starbase project in Starbase. The BA03 project is privately funded on private land for private use. This development contributes to the local infrastructure landscape in Bastrop, a city with a population of approximately 35,786 and a median household income of $86,976, according to U.S. Census estimates for ZIP code 78602.

The project’s scope is strictly defined as storage. No residential or retail components are indicated in the filing. The construction timeline reflects a standard duration for a facility of this size. The registration confirms the project’s intent to proceed with new construction under state oversight. The pending plan review is a standard step before construction can fully commence. The completion date remains targeted for May 2027, providing a clear endpoint for this phase of development.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78602 (Bastrop)

One email per change. Unsubscribe in one click. Privacy.

Storage is a New Construction project located at 816 FM 1209, Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $7.0M covering 36,000 sq ft. SpaceX is the property owner. The project was registered with TDLR on September 30, 2026.

Frequently Asked Questions

Is the facility open?

The TDLR record shows the project is under new construction with plan review pending. It is not yet open or operating, as the filing targets completion for May 2027.

Who is the owner?

SpaceX is the owner and developer of record for this project. The facility is privately funded and located on private land in Bastrop.

What is the size of the building?

The new construction project spans 36,000 square feet. This is significantly larger than the county median size of 10,650 square feet for similar filings.

When will construction be finished?

The filing indicates construction is targeted for May 2027. The project was registered in September 2026, with a scheduled start in October 2026.

What is Storage?

Storage is a new construction project at 816 FM 1209 in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Storage

Is Storage open in Bastrop?

Storage is still under construction in Bastrop, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Storage located?

Storage is located at 816 FM 1209, Bastrop, TX, 78602, in Bastrop County.

Who is the owner or developer of Storage?

SpaceX is the property owner/developer of record for Storage, per its TDLR project registration.

How much does Storage cost and how big is it?

Storage has an estimated construction value of $7.0M and approximately 36,000 square feet (about $194/sqft), based on its TDLR filing.

Scope of Work

Storage

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

816 FM 1209, Bastrop, TX, 78602

30.15589, -97.40435

Related City Permits

Building permits found at or near this location

816 WALNUT CREEK DR
22.51 mi away

Replacement of complete existing central heat and air system with or without duct work hvac change out

ActiveMechanical PermitChange OutOct 2026
View Details
2026-129201 MP
New Abacus
816 WALNUT CREEK DR
22.51 mi away

Replacement of an existing water heater Changing out NG water heater like for like in closet

ActivePlumbing PermitChange OutSep 2026
View Details
2026-125320 PP
NEW ABACUS, LLC
816 W YAGER LN
23.51 mi away

Scheduled Outage Install a new 400 amp transocket meter base and the riser conductors rated at 400 amps.

FinalElectrical PermitUpgradeJul 2026
View Details
2026-092211 EP
Tejas Electric LLC
8169 CEBERRY DR
25.49 mi away

*Addressing active code violation* Addition/ remodel to existing 1-story single family residential to include: addition to existing garage new full bath covered front porch rear screened patio; 2nd floor addition to include game room full bath balcony and roof top deck.

ActiveElectrical PermitAddition and RemodelAug 2026
View Details
2023-082189 EP
Ault Electric
816 SUSANA ALMANZA ST

Duplex Unit #816 3-story 4 bed/2.5 bath with attached covered porch and patio

ActiveMechanical PermitNewAug 2026
View Details
2025-027856 MP
JCS HEATING AND COOLING

Watch all construction in 78602 (Bastrop)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.