Funding type
This project is privately funded, on private land for private use.
ASME Phase 2 - Building B
825 East Howard Lane, Austin, TX, 78753
ASME Phase 2 - Building B is a renovation/alteration project at 825 East Howard Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $450K across about 2,200 sq ft.
- Estimated project value
- $450K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,200 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $205/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source record
📰About ASME Phase 2 - Building B
Parmer Sector 8 is a 2,200 sq ft interior renovation project located at 825 East Howard Lane in Austin, Texas. The work involves the modification of existing tenant space within the building, with an estimated construction cost of $450,000. This project is privately funded on private land for private use.
The registered accessibility specialist for this filing is Robert Ronson, and the design firm of record is STG Design. The owner of record is Karlin 8.1 LLC. The project was registered with TDLR in September 2026, and plan review is pending. Construction is scheduled to begin in October 2026, with completion targeted for January 2027.
Project Scale and Cost
At $205 per square foot, the estimated cost for this renovation is above the county median of $103 per square foot for similar projects. The total estimated cost of $450,000 is also above the Travis County median of $298,117 for renovation and alteration filings. The scheduled build window of 91 days is close to the county median of 98 days for comparable work.
STG Design has six other TDLR-registered projects in the region, including Colorado Tower and Buildings 1 & 2, with a combined value of $31,902,000. This indicates the firm is active in various scale projects across Austin.
Location and Area Context
The surrounding area, ZIP code 78753, has a population of about 58,449 and a median household income of $62,334 according to U.S. Census ACS 2023 estimates. Housing in this area is mostly renter-occupied, with a median owner-occupied home value of $344,100.
City of Austin permit records show 19 permits on file at this street address between April 2021 and September 2026. These include electrical, mechanical, building, and plumbing permits, with several listed as interior remodels of existing facilities.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78753 (Austin)
One email per change. Unsubscribe in one click. Privacy.
ASME Phase 2 - Building B is a Renovation/Alteration project located at 825 East Howard Lane, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $450K covering 2,200 sq ft. Karlin 8.1 LLC is the property owner and STG Design is the design firm of record. The project was registered with TDLR on September 30, 2026.
Frequently Asked Questions
What is the estimated cost of the Parmer Sector 8 renovation?
The estimated cost for the 2,200 sq ft interior renovation is $450,000. This figure is above the Travis County median for similar renovation and alteration filings.
Who is the design firm for this Austin project?
STG Design is the design firm of record for Parmer Sector 8. They have several other registered projects in the Austin area, including work on Colorado Tower.
When is the construction expected to be completed?
The project is targeted for January 2027. Construction is scheduled to start in October 2026, following its registration with TDLR in September 2026.
Is the business at 825 East Howard Lane open?
The TDLR record indicates construction is pending and targeted for January 2027. It does not confirm that the business is open or operating.
What type of work is being done at Parmer Sector 8?
The scope of work is the modification of existing interior tenant space. This is classified as a renovation or alteration project on private land.
What is ASME Phase 2 - Building B?
ASME Phase 2 - Building B is a renovation/alteration project at 825 East Howard Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Modification of existing interior tenant space
Is ASME Phase 2 - Building B open in Austin?
ASME Phase 2 - Building B is still under construction in Austin, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Where is ASME Phase 2 - Building B located?
ASME Phase 2 - Building B is located at 825 East Howard Lane, Austin, TX, 78753, in Travis County.
Who is the owner or developer of ASME Phase 2 - Building B?
Karlin 8.1 LLC is the property owner/developer of record for ASME Phase 2 - Building B, per its TDLR project registration.
Who is the architect or design firm for ASME Phase 2 - Building B?
STG Design is the design firm of record for ASME Phase 2 - Building B, according to its TDLR filing.
How much does ASME Phase 2 - Building B cost and how big is it?
ASME Phase 2 - Building B has an estimated construction value of $450K and approximately 2,200 square feet (about $205/sqft), based on its TDLR filing.
Scope of Work
Modification of existing interior tenant space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
825 East Howard Lane, Austin, TX, 78753
Related Projects
Same Design Firm
$1.7M totalRelated City Permits
Building permits found at or near this location
Interior remodel existing facility
Interior remodel existing facility
Interior remodel existing facility
Interior remodel existing lt manuf. area.
Interior remodel existing lt manuf. area.
Watch all construction in 78753 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.