Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Woodworth Blvd Streetscape Improvements in Port Arthur, TX
3120 Central Mall Drive, Port Arthur, TX, 77642
Woodworth Blvd Streetscape Improvements is a renovation/alteration project at 3120 Central Mall Drive, Port Arthur, in Jefferson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $14.5M across about 131,000 sq ft.
- Estimated project value
- $14.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 131,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $111/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
870 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
13 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Woodworth Blvd Streetscape Improvements
The City of Port Arthur is leading a $14,500,000 renovation and alteration project for the Woodworth Blvd Streetscape Improvements. Located at 3120 Central Mall Drive in Port Arthur, Texas, this infrastructure upgrade covers 131,000 square feet of roadway, ramps, and sidewalks. The work involves comprehensive rehabilitation of the street surface and the installation of new pedestrian access points.
Project Scope and Design
Arceneaux Wilson & Cole, LLC serves as the design firm of record for this significant public works project. The scope of work, as detailed in the filing, includes roadway rehabilitation and the construction of new ramps and sidewalks. David Clark Teel is the registered accessibility specialist associated with the project, ensuring that the new infrastructure meets required standards. The project is classified as a renovation and alteration rather than a new construction build.
This project involves public funds, public land, or is a Federally funded roadway project. The estimated cost of $14,500,000 places the project well above the median estimated cost for similar renovation and alteration filings in Jefferson County. The cost per square foot is calculated at $111, which is above the county median of $88 for comparable projects. The scheduled build window for this project is 883 days, which is longer than the county median of 104 days for similar work.
The project was registered with TDLR in September 2026; plan review is pending and completion is targeted for October 2026. Construction start was scheduled for May 2024 according to the filing documents. The City of Port Arthur has six other TDLR-registered projects totaling $19,383,486, including the Rose Hill Park and Port Arthur Fire Station No. 2. This streetscape improvement is part of the city's broader infrastructure development efforts in Jefferson County.
The area surrounding the project, ZIP code 77642, has a population of about 38,051 residents according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $41,677, and there are 16,234 housing units. The Jefferson County unemployment rate was 5 percent in July 2026. This streetscape project will impact local traffic patterns and pedestrian access during the construction period, which is targeted for October 2026.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77642 (Port Arthur)
One email per change. Unsubscribe in one click. Privacy.
Woodworth Blvd Streetscape Improvements is a Renovation/Alteration project located at 3120 Central Mall Drive, Port Arthur, TX 77642 in Port Arthur, Texas. The project has an estimated value of $14.5M covering 131,000 sq ft. City of Port Arthur is the property owner and Arceneaux Wilson & Cole, LLC is the design firm of record. The project was registered with TDLR on September 30, 2026.
Frequently Asked Questions
What is the total cost of the Woodworth Blvd project?
The estimated cost for the Woodworth Blvd Streetscape Improvements is $14,500,000. This figure covers roadway rehabilitation, new ramps, and sidewalks across 131,000 square feet. The project is funded through public sources or federal roadway funding.
When is the project expected to be completed?
The project is targeted for October 2026. It was registered with TDLR in September 2026, and plan review is pending. Construction was scheduled to start in May 2024 according to the filing.
Who is the owner of this project?
The City of Port Arthur is the owner and developer of record. Arceneaux Wilson & Cole, LLC is the design firm, and David Clark Teel is the registered accessibility specialist for the project.
What work is included in the scope?
The scope includes roadway rehabilitation and the installation of new ramps and sidewalks. This is classified as a renovation and alteration project covering 131,000 square feet of public infrastructure in Port Arthur.
What is Woodworth Blvd Streetscape Improvements?
Woodworth Blvd Streetscape Improvements is a renovation/alteration project at 3120 Central Mall Drive in Port Arthur, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway rehabilitation, new ramps and sidewalks
Is Woodworth Blvd Streetscape Improvements open in Port Arthur?
Woodworth Blvd Streetscape Improvements was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Woodworth Blvd Streetscape Improvements located?
Woodworth Blvd Streetscape Improvements is located at 3120 Central Mall Drive, Port Arthur, TX, 77642, in Jefferson County.
Who is the owner or developer of Woodworth Blvd Streetscape Improvements?
City of Port Arthur is the property owner/developer of record for Woodworth Blvd Streetscape Improvements, per its TDLR project registration.
Who is the architect or design firm for Woodworth Blvd Streetscape Improvements?
Arceneaux Wilson & Cole, LLC is the design firm of record for Woodworth Blvd Streetscape Improvements, according to its TDLR filing.
How much does Woodworth Blvd Streetscape Improvements cost and how big is it?
Woodworth Blvd Streetscape Improvements has an estimated construction value of $14.5M and approximately 131,000 square feet (about $111/sqft), based on its TDLR filing.
Scope of Work
Roadway rehabilitation, new ramps and sidewalks
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3120 Central Mall Drive, Port Arthur, TX, 77642
Related Projects
Same Owner
$44.7M totalSame Design Firm
$29.0M totalNearby Projects
Within 1 kmWatch all construction in 77642 (Port Arthur)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Port Arthur?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.