Project intelligenceTDLR TABS2027002465New Construction
Funding type

This project is privately funded, on private land for private use.

Alta Gosling Road

24550 Gosling Road, Spring, TX, 77389

Opening ~Oct 2028Project Registered

Alta Gosling Road is a new construction project at 24550 Gosling Road, Spring, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2028. The project has an estimated value of $1.5M across about 4,877 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,877 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$308/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 1, 2026732 days across supplied datesOct 2, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    670 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Alta Gosling Road

A new 4,877 sq ft freestanding amenity building is under development at a for-rent multifamily complex located at 24550 Gosling Road in Spring, Texas. The project, registered with TDLR in October 2026, involves the new construction of a facility that includes a mail center. The estimated cost for this build is $1,500,000, which works out to $308 per square foot. Construction is scheduled to begin in December 2026, and the completion is targeted for October 2028.

WP West Acquisitions, LLC is the owner of record for this development. The firm has a significant presence in the region, with six other TDLR-registered projects totaling $9,000,000 in estimated costs. These include locations in Tomball, Denton, Georgetown, Katy, and San Antonio, indicating a consistent portfolio of similar-scale multifamily amenities. The design for the Spring project is handled by Design Balance, Inc, which has also worked on three other registered projects in Austin and Georgetown.

Cost and Scope Comparison

The financial scale of this project distinguishes it from the typical new construction filings in Harris County. Among 22,121 registered new construction projects in the county, the median estimated cost is $750,000. The $1,500,000 budget for the Alta Gosling Road building is above this county median. Similarly, the median size for these projects is 9,000 sq ft, meaning this 4,877 sq ft structure is smaller than the average. The cost per square foot of $308 is also above the county median of $88, reflecting the specialized nature of the amenity and mail center components.

The scheduled build window for this project is 670 days, which is longer than the county median of 220 days. This extended timeline allows for the detailed construction of a freestanding structure with specific functional requirements. The project is privately funded on private land for private use. Keith Lester is the registered accessibility specialist associated with the filing, ensuring the design meets necessary standards.

The Spring area, identified by ZIP code 77389, has a population of approximately 44,545 residents. According to U.S. Census ACS 2023 estimates, the median household income in this area is $145,228. The housing stock consists of about 15,138 units, with a median owner-occupied home value of $387,100. This demographic profile suggests a stable residential market where new multifamily amenities contribute to the local housing infrastructure.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77389 (Spring)

One email per change. Unsubscribe in one click. Privacy.

Alta Gosling Road is a New Construction project located at 24550 Gosling Road, Spring, TX 77389 in Spring, Texas. The project has an estimated value of $1.5M covering 4,877 sq ft. WP West Acquisitions, LLC is the property owner and Design Balance, Inc is the design firm of record. The project was registered with TDLR on October 1, 2026.

Frequently Asked Questions

What is the estimated cost of the Alta Gosling Road project?

The estimated cost for the new amenity building is $1,500,000. This figure is above the Harris County median of $750,000 for similar new construction filings.

Who is the owner of the multifamily complex?

WP West Acquisitions, LLC is the owner of record. The firm has five other closed or in-review projects in Texas, including locations in Katy and Georgetown.

When is the construction scheduled to be completed?

Construction is targeted for October 2028. The project was registered with TDLR in October 2026, with a scheduled start in December 2026.

What specific features are included in the new building?

The scope of work includes a freestanding amenity building with a mail center at a for-rent multifamily complex. The total size is 4,877 sq ft.

Is the business open for residents?

The project is in the construction phase. The TDLR record indicates the status is Project Registered, with completion targeted for October 2028.

What is Alta Gosling Road?

Alta Gosling Road is a new construction project at 24550 Gosling Road in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW CONSTRUCTION OF FREESTANDING AMENITY BUILDING WITH MAIL CENTER AT A FOR-RENT MULTIFAMILY COMPLEX.

Is Alta Gosling Road open in Spring?

Alta Gosling Road is still under construction in Spring, TX, with an estimated completion of Oct 2028 according to its TDLR registration.

Where is Alta Gosling Road located?

Alta Gosling Road is located at 24550 Gosling Road, Spring, TX, 77389, in Harris County.

Who is the owner or developer of Alta Gosling Road?

WP West Acquisitions, LLC is the property owner/developer of record for Alta Gosling Road, per its TDLR project registration.

Who is the architect or design firm for Alta Gosling Road?

Design Balance, Inc is the design firm of record for Alta Gosling Road, according to its TDLR filing.

How much does Alta Gosling Road cost and how big is it?

Alta Gosling Road has an estimated construction value of $1.5M and approximately 4,877 square feet (about $308/sqft), based on its TDLR filing.

Scope of Work

NEW CONSTRUCTION OF FREESTANDING AMENITY BUILDING WITH MAIL CENTER AT A FOR-RENT MULTIFAMILY COMPLEX.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

24550 Gosling Road, Spring, TX, 77389

30.12107, -95.50594

Watch all construction in 77389 (Spring)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.