Project intelligenceTDLR TABS2027002601New Construction
Funding type

This project is privately funded, on private land for private use.

Lightbridge Academy

Lot 1, corner of Jordan Rd and Virginia Pkwy., Mckinney, TX, 75070

Opening ~Aug 2027Project Registered

Lightbridge Academy is a new construction project at Lot 1, corner of Jordan Rd and Virginia Pkwy., Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $3.0M across about 14,600 sq ft.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
14,600 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$205/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 2, 2026303 days across supplied datesAug 1, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    290 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lightbridge Academy

Lightbridge Academy, McKinney is a new 14,600 sq ft child care center planned for the corner of Jordan Rd and Virginia Pkwy. The project is registered with TDLR and is targeted for August 2027. This new construction effort is privately funded on private land for private use, with an estimated cost of $3,000,000.

Project Scope and Design

Bryteside Investments LLC is the owner of record for this development in Collin County. Colliers Engineering & Design serves as the design firm of record. The scope of work is specifically defined as the new construction of the 14,600 sq ft facility. The estimated cost of $3,000,000 translates to $205 per square foot. This figure is above the county median of $120 per square foot for similar new construction filings in Collin County.

The scheduled build window for this project is 290 days, which is longer than the county median of 212 days. Colliers Engineering & Design is also the design firm for six other TDLR-registered projects, including a similar Lightbridge Academy location in Celina, Texas. That Celina project also has an estimated cost of $3,000,000 and is registered. The design firm’s portfolio includes projects in Dallas, Wylie, and San Antonio, with total values ranging from $142,000 to $3,000,000.

Location and Market Context

The site is located in ZIP code 75070, where the U.S. Census estimates a population of about 59,859. The median household income in this area is $106,549, and the median owner-occupied home value is $429,309. Housing in this ZIP code is an even mix of owner- and renter-occupied units. The total estimated cost of $3,000,000 places this project in the top quarter of new construction costs in Collin County, where the median is $800,000.

The site coordinates place the project inside a FEMA Special Flood Hazard Area, specifically zone AE which includes a floodway. This designation is relevant for construction planning and insurance considerations. The project was registered with TDLR in October 2026, and plan review is pending. The completion date on the filing is August 2027, aligning with the targeted timeline for the new child care center.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75070 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

Lightbridge Academy is a New Construction project located at Lot 1, corner of Jordan Rd and Virginia Pkwy., Mckinney, TX 75070 in Mckinney, Texas. The project has an estimated value of $3.0M covering 14,600 sq ft. Bryteside Investments LLC is the property owner and Colliers Engineering & Design is the design firm of record. The project was registered with TDLR on October 2, 2026.

Frequently Asked Questions

What is the estimated cost of the Lightbridge Academy project in McKinney?

The estimated cost for the new 14,600 sq ft child care center is $3,000,000. This amount is above the county median for new construction in Collin County, which is $800,000.

Who is the design firm for this project?

Colliers Engineering & Design is the design firm of record. They are also responsible for other registered projects, including a similar facility in Celina and a charging hub in Dallas.

When is the construction expected to be completed?

The project is targeted for August 2027. It was registered with TDLR in October 2026, and plan review is pending according to the filing.

Is the Lightbridge Academy in McKinney open yet?

No, the business is not open. The project is in the registration phase with TDLR, and construction is planned to start in October 2026 with completion targeted for August 2027.

What is the square footage of the new facility?

The new child care center is 14,600 sq ft. This is larger than the county median size of 7,066 sq ft for new construction projects in Collin County.

What is Lightbridge Academy?

Lightbridge Academy is a new construction project at Lot 1, corner of Jordan Rd and Virginia Pkwy. in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of a 14600 sq. ft. child care center.

Is Lightbridge Academy open in Mckinney?

Lightbridge Academy is still under construction in Mckinney, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Lightbridge Academy located?

Lightbridge Academy is located at Lot 1, corner of Jordan Rd and Virginia Pkwy., Mckinney, TX, 75070, in Collin County.

Who is the owner or developer of Lightbridge Academy?

Bryteside Investments LLC is the property owner/developer of record for Lightbridge Academy, per its TDLR project registration.

Who is the architect or design firm for Lightbridge Academy?

Colliers Engineering & Design is the design firm of record for Lightbridge Academy, according to its TDLR filing.

How much does Lightbridge Academy cost and how big is it?

Lightbridge Academy has an estimated construction value of $3.0M and approximately 14,600 square feet (about $205/sqft), based on its TDLR filing.

Scope of Work

New construction of a 14600 sq. ft. child care center.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Lot 1, corner of Jordan Rd and Virginia Pkwy., Mckinney, TX, 75070

33.16096, -96.60610

Watch all construction in 75070 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.