TIRZ 9 - S Post Oak Sidewalk Maintenance
Along South post oak from West Orem to Allum Road, Houston, TX, 77042
TIRZ 9 - S Post Oak Sidewalk Maintenance is a new construction project at Along South post oak from West Orem to Allum Road, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $400K across about 21,000 sq ft.
- Estimated project value
- $400K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 21,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $19/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
94 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
119 days after the preceding date shown.
Source: TDLR filing
View source record
📰About TIRZ 9 - S Post Oak Sidewalk Maintenance
Sidewalk maintenance along South Post Oak Road is a new construction project spanning 21,000 square feet in Houston, Texas. The work covers the northbound section of the roadway from West Orem to Allum Road in the 77042 ZIP code. The City of Houston TIRZ 9 is the owner of record for this infrastructure improvement. The estimated cost for the project is $400,000, which equates to $19 per square foot.
Project Scope and Timeline
The registered accessibility specialist for this filing is Kenneth Otten. The design firm of record is Huitt Zollars, Inc. The project was registered with TDLR in October 2026. Plan review is pending, and construction is scheduled to begin in January 2027. The completion date on the filing is targeted for May 2027. This scheduled build window of 119 days is shorter than the county median of 220 days for similar new construction filings in Harris County.
The project involves public funds and public land. The estimated cost is below the county median of $750,000 for new construction projects. The per-square-foot cost of $19 is below the county median of $88. The City of Houston TIRZ 9 has one other TDLR-registered project totaling $120,000, which is a traffic signal improvement project with review complete.
Local Context
The area profile for ZIP 77042 indicates a population of about 40,725 residents. The median household income is $57,745, and the median owner-occupied home value is $371,300. Housing in this area is predominantly renter-occupied. The Harris County unemployment rate was 5.2 percent in July 2026. This project is one of 3,031 registered new construction filings in Harris County in the last 24 months.
Huitt Zollars, Inc. has three other TDLR-registered projects totaling $40,797,000. These include a traffic signal improvement project in Houston, a residential development named Altura Residences, and a road project in Dickinson. The current status of the South Post Oak Road sidewalk project is Project Registered. The filing specifies the scope as sidewalk maintenance along the northbound side of the road between the two specified cross streets.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77042 (Houston)
One email per change. Unsubscribe in one click. Privacy.
TIRZ 9 - S Post Oak Sidewalk Maintenance is a New Construction project located at Along South post oak from West Orem to Allum Road, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $400K covering 21,000 sq ft. City of Houston TIRZ 9 is the property owner and Huitt Zollars, Inc is the design firm of record. The project was registered with TDLR on October 2, 2026.
Frequently Asked Questions
Where is the sidewalk maintenance project located?
The project is located along South Post Oak Road in Houston, Texas. It spans the northbound section from West Orem to Allum Road in the 77042 ZIP code.
Who is the owner of the project?
The owner of record is the City of Houston TIRZ 9. The design firm of record is Huitt Zollars, Inc.
What is the estimated cost of the project?
The estimated cost is $400,000. This equates to $19 per square foot for the 21,000 square feet of work.
When is the project targeted for completion?
The project is targeted for May 2027. Construction is scheduled to begin in January 2027.
What is TIRZ 9 - S Post Oak Sidewalk Maintenance?
TIRZ 9 - S Post Oak Sidewalk Maintenance is a new construction project at Along South post oak from West Orem to Allum Road in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk Maintenance along South Post Oak North bound from West Orem to Allum Road
Is TIRZ 9 - S Post Oak Sidewalk Maintenance open in Houston?
TIRZ 9 - S Post Oak Sidewalk Maintenance is still under construction in Houston, TX, with an estimated completion of May 2027 according to its TDLR registration.
Where is TIRZ 9 - S Post Oak Sidewalk Maintenance located?
TIRZ 9 - S Post Oak Sidewalk Maintenance is located at Along South post oak from West Orem to Allum Road, Houston, TX, 77042, in Harris County.
Who is the owner or developer of TIRZ 9 - S Post Oak Sidewalk Maintenance?
City of Houston TIRZ 9 is the property owner/developer of record for TIRZ 9 - S Post Oak Sidewalk Maintenance, per its TDLR project registration.
Who is the architect or design firm for TIRZ 9 - S Post Oak Sidewalk Maintenance?
Huitt Zollars, Inc is the design firm of record for TIRZ 9 - S Post Oak Sidewalk Maintenance, according to its TDLR filing.
How much does TIRZ 9 - S Post Oak Sidewalk Maintenance cost and how big is it?
TIRZ 9 - S Post Oak Sidewalk Maintenance has an estimated construction value of $400K and approximately 21,000 square feet (about $19/sqft), based on its TDLR filing.
Scope of Work
Sidewalk Maintenance along South Post Oak North bound from West Orem to Allum Road
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Along South post oak from West Orem to Allum Road, Houston, TX, 77042
Related Projects
Same Owner
$520K totalWatch all construction in 77042 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.