Project intelligenceTDLR TABS2027002965Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

King Cattle Phase II - ICE in Del Rio, TX

100 Ave T, Del Rio, TX, 78840

Opening ~Dec 2026Project Registered

King Cattle Phase II - ICE is a renovation/alteration project at 100 Ave T, Del Rio, in Val Verde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $74K across about 1,500 sq ft.

Estimated project value
$74K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$49/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 7, 202655 days across supplied datesDec 1, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About King Cattle Phase II - ICE

King Cattle LLC is renovating a 1,500 sq ft office space at 100 Ave T in Del Rio. The project, filed as King Cattle Phase II - ICE, involves a specific office space remodel with an estimated cost of $74,000.

The renovation is privately funded on private land for private use. Stephen A Meyer serves as the registered accessibility specialist for this filing. The project was registered with TDLR in October 2026, and plan review is pending. Construction start is listed for October 2026, with completion targeted for December 2026.

This project’s estimated cost of $74,000 is below the county median for renovation and alteration filings in Val Verde County. The median estimated cost for similar projects in the area is $343,548. The scheduled build window of 46 days is shorter than the county median of 98 days for comparable work.

Cost and Size Context

The estimated cost per square foot for this project is $49. This figure is below the county median of $68 per square foot for renovation and alteration projects. The total square footage of 1,500 sq ft is smaller than the median size of 4,592 sq ft for similar filings in Val Verde County.

Del Rio is located in Val Verde County. Census estimates for ZIP code 78840 indicate a population of about 47,053 and a median household income of $59,608. The area contains 18,438 housing units, with a median owner-occupied home value of $151,500. Housing in this ZIP code is mostly owner-occupied.

Val Verde County unemployment rate was 5.2 percent in August 2026, lower than a year earlier. The project status is Project Registered. The filing does not provide information on the specific design firm or detailed scope beyond the office space remodel. The owner of record is King Cattle LLC.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78840 (Del Rio)

One email per change. Unsubscribe in one click. Privacy.

King Cattle Phase II - ICE is a Renovation/Alteration project located at 100 Ave T, Del Rio, TX 78840 in Del Rio, Texas. The project has an estimated value of $74K covering 1,500 sq ft. King Cattle LLC is the property owner. The project was registered with TDLR on October 7, 2026.

Frequently Asked Questions

What is the status of the King Cattle office remodel?

The project was registered with TDLR in October 2026. Plan review is pending, and the completion date is targeted for December 2026.

Where is the King Cattle Phase II - ICE project located?

The project is located at 100 Ave T, Del Rio, TX 78840, in Val Verde County.

How much does the renovation cost?

The estimated cost for the office space remodel is $74,000. This is below the county median cost for similar renovation projects.

Who is the registered accessibility specialist?

Stephen A Meyer is the registered accessibility specialist listed on the TDLR filing for this project.

Is the business open?

The TDLR record tracks construction status, not business operations. The filing indicates plan review is pending and completion is targeted for December 2026.

What is King Cattle Phase II - ICE?

King Cattle Phase II - ICE is a renovation/alteration project at 100 Ave T in Del Rio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Office space remodel

Is King Cattle Phase II - ICE open in Del Rio?

King Cattle Phase II - ICE is still under construction in Del Rio, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is King Cattle Phase II - ICE located?

King Cattle Phase II - ICE is located at 100 Ave T, Del Rio, TX, 78840, in Val Verde County.

Who is the owner or developer of King Cattle Phase II - ICE?

King Cattle LLC is the property owner/developer of record for King Cattle Phase II - ICE, per its TDLR project registration.

How much does King Cattle Phase II - ICE cost and how big is it?

King Cattle Phase II - ICE has an estimated construction value of $74K and approximately 1,500 square feet (about $49/sqft), based on its TDLR filing.

Scope of Work

Office space remodel

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

100 Ave T, Del Rio, TX, 78840

Loading location map…
29.36152, -100.90951

Watch all construction in 78840 (Del Rio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.