Funding type
This project is privately funded, on private land for private use.
Caseys 4771 in Marlin, TX
107 HWY 6, Marlin, TX, 76661
Caseys 4771 is a renovation/alteration project at 107 HWY 6, Marlin, in Falls County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $1.1M across about 5,998 sq ft.
- Estimated project value
- $1.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,998 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $176/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
201 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
67 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Caseys 4771
Caseys Store #4771 is undergoing a comprehensive interior renovation at 107 HWY 6 in Marlin, Texas. The project, filed under the name Caseys 4771, involves a 5,998 sq ft facility that Casey's Marketing Company is preparing for updated operations. The estimated cost for this renovation and alteration work is $1,058,555, which calculates to $176 per square foot. The project was registered with TDLR in October 2026, and construction is targeted for July 2027.
The scope of work details a significant transformation of the interior space. The filing specifies an interior remodel that includes the minor demolition of existing interior slab, fixtures, equipment, mechanical, and electrical systems. This demolition will be followed by the installation of new interior slab patches, updated fixtures, and new equipment. The mechanical and electrical systems will be replaced or upgraded to support the new layout. A key addition to the facility includes new interior cooler and freezer boxes, as well as a new exterior mounted DOAS unit for climate control.
Project Context and Regional Comparison
Casey's Marketing Company is the owner of record for this project, which is privately funded on private land for private use. The company has three other TDLR-registered projects in the region, including Caseys Store #4767 in Marlin, Caseys Store #4707 in Hearne, and Caseys Store #4732 in Lexington. These other projects have estimated costs ranging from $790,330 to $873,909, indicating a consistent investment level across the company's recent filings in the area.
Within Falls County, this project stands out for its scale and cost relative to recent filings. The median estimated cost for renovation and alteration projects in the county is $405,000, while the median size is 4,500 sq ft. At $1,058,555, this project's cost is above the county median for its type, placing it in the top quarter of recent filings. The cost per square foot of $176 is also above the county median of $101. Despite the higher cost, the scheduled build window of 67 days is shorter than the county median of 90 days, suggesting an efficient construction timeline for the scope of work described.
The registered accessibility specialist for this project is Mark S Robinson. The project status is listed as Project Registered, with plan review pending. The construction start date per the filing is April 2027, and the completion is targeted for July 2027. This timeline allows for a focused period of construction work to complete the interior remodel, demolition, and new installations before the project is finished.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76661 (Marlin)
One email per change. Unsubscribe in one click. Privacy.
Caseys 4771 is a Renovation/Alteration project located at 107 HWY 6, Marlin, TX 76661 in Marlin, Texas. The project has an estimated value of $1.1M covering 5,998 sq ft. CASEY'S MARKETING COMPANY is the property owner. The project was registered with TDLR on October 7, 2026.
Frequently Asked Questions
What is the current status of the Caseys Store #4771 renovation?
The project is registered with TDLR, and plan review is pending. Construction is scheduled to start in April 2027 and is targeted for July 2027.
How much does the Caseys Store #4771 renovation cost?
The estimated cost for the renovation and alteration work is $1,058,555, which equates to $176 per square foot for the 5,998 sq ft facility.
What specific work is included in the scope of the Caseys Store #4771 project?
The scope includes interior remodel, minor demolition of interior slab, fixtures, equipment, mechanical, and electrical systems, followed by new installations including cooler and freezer boxes.
Who is the owner of the Caseys Store #4771 project in Marlin?
The owner of record is Casey's Marketing Company, which is privately funding the project on private land for private use.
What is Caseys 4771?
Caseys 4771 is a renovation/alteration project at 107 HWY 6 in Marlin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel, minor demolition of interior slab, fixtures, equipment, mechanical, electrical. New interior slab patches, fixtures, equipment, mechanical, electrical, new interior cooler and freezer boxes, new exterior mounted DOAS unit
Is Caseys 4771 open in Marlin?
Caseys 4771 is still under construction in Marlin, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is Caseys 4771 located?
Caseys 4771 is located at 107 HWY 6, Marlin, TX, 76661, in Falls County.
Who is the owner or developer of Caseys 4771?
CASEY'S MARKETING COMPANY is the property owner/developer of record for Caseys 4771, per its TDLR project registration.
How much does Caseys 4771 cost and how big is it?
Caseys 4771 has an estimated construction value of $1.1M and approximately 5,998 square feet (about $176/sqft), based on its TDLR filing.
Scope of Work
Interior remodel, minor demolition of interior slab, fixtures, equipment, mechanical, electrical. New interior slab patches, fixtures, equipment, mechanical, electrical, new interior cooler and freezer boxes, new exterior mounted DOAS unit
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
107 HWY 6, Marlin, TX, 76661
Related Projects
Same Owner
$3.5M totalWatch all construction in 76661 (Marlin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Marlin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.