Funding type
This project is privately funded, on private land for private use.
MHWT Cath Lab 11 Replacement in Houston, TX
6551 Bertner Ave, Level 04, Houston, TX, 77030
MHWT Cath Lab 11 Replacement is a renovation/alteration project at 6551 Bertner Ave, Level 04, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $650K across about 1,220 sq ft.
- Estimated project value
- $650K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,220 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $533/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
88 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
347 days after the preceding date shown.
Source: TDLR filing
View source record
📰About MHWT Cath Lab 11 Replacement
Houston Methodist Hospital - TMC (Walter Tower) is renovating a 1,220 sq ft catheterization laboratory located at 6551 Bertner Ave, Level 04, in Houston. The project, filed as MHWT Cath Lab 11 Replacement, involves the replacement of existing medical equipment within the current footprint without altering interior or exterior walls. This renovation/alteration work is estimated to cost $650,000, resulting in a cost of $533 per square foot.
The facility is owned by Houston Methodist Hospital - TMC (Walter Tower) and designed by THR3E Design. Courtney Lawren Chapman is the registered accessibility specialist for the project. The work is privately funded on private land for private use.
Construction is scheduled to begin in January 2027. The project was registered with TDLR in October 2026, and plan review is pending. Completion is targeted for December 2027. This timeline represents a scheduled build window of 347 days, which is longer than the 92-day median for similar renovation projects in Harris County. The estimated cost is above the county median of $250,000 for this type of work, placing it in the top quarter of recent filings.
Context and Comparisons
Houston Methodist Hospital - TMC (Walter Tower) has two other TDLR-registered projects totaling $1,280,000. One is another $650,000 project at the same location, and the other is a $630,000 project at Houston Methodist Walter Tower, which has completed inspection. THR3E Design has six other registered projects totaling $2,725,000, including work at Houston Methodist Emergency Care Center in Pearland and Houston Methodist Clear Lake Hospital in Nassau Bay. These projects range in cost from $250,000 to $750,000.
City of Houston permit records show two permits on file at this street address, issued between January 2026 and July 2026. While these permits are at the same address, they may relate to different tenants or suites and are not necessarily part of this specific Cath Lab 11 replacement project. The area profile for ZIP code 77030 indicates a population of about 12,976 and a median household income of $79,415, with housing mostly renter-occupied.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77030 (Houston)
One email per change. Unsubscribe in one click. Privacy.
MHWT Cath Lab 11 Replacement is a Renovation/Alteration project located at 6551 Bertner Ave, Level 04, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $650K covering 1,220 sq ft. Houston Methodist Hospital - TMC (Walter Tower) is the property owner and THR3E Design is the design firm of record. The project was registered with TDLR on October 8, 2026.
Frequently Asked Questions
What is the scope of work for this project?
The scope includes the renovation of an existing 1,220 sq ft Cath Lab to replace existing medical equipment. There are no changes to interior or exterior walls.
When is construction expected to finish?
Construction is scheduled to begin in January 2027, with completion targeted for December 2027. Plan review is pending.
Who is the design firm for this renovation?
THR3E Design is the design firm of record for this project. Courtney Lawren Chapman is the registered accessibility specialist.
Is the hospital open at this address?
The TDLR record covers construction status only. It does not confirm business opening hours or operational status. City permits at this address show recent renovation activity.
How does the cost compare to other projects in Harris County?
The estimated cost of $650,000 is above the county median of $250,000 for renovation/alteration projects. The cost per square foot is $533, which is above the county median of $80.
What is MHWT Cath Lab 11 Replacement?
MHWT Cath Lab 11 Replacement is a renovation/alteration project at 6551 Bertner Ave, Level 04 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope includes the renovation of an existing 1,220 SF Cath Lab to replace existing medical equipment, with no changes to interior or exterior walls.
Is MHWT Cath Lab 11 Replacement open in Houston?
MHWT Cath Lab 11 Replacement is still under construction in Houston, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is MHWT Cath Lab 11 Replacement located?
MHWT Cath Lab 11 Replacement is located at 6551 Bertner Ave, Level 04, Houston, TX, 77030, in Harris County.
Who is the owner or developer of MHWT Cath Lab 11 Replacement?
Houston Methodist Hospital - TMC (Walter Tower) is the property owner/developer of record for MHWT Cath Lab 11 Replacement, per its TDLR project registration.
Who is the architect or design firm for MHWT Cath Lab 11 Replacement?
THR3E Design is the design firm of record for MHWT Cath Lab 11 Replacement, according to its TDLR filing.
How much does MHWT Cath Lab 11 Replacement cost and how big is it?
MHWT Cath Lab 11 Replacement has an estimated construction value of $650K and approximately 1,220 square feet (about $533/sqft), based on its TDLR filing.
Scope of Work
The scope includes the renovation of an existing 1,220 SF Cath Lab to replace existing medical equipment, with no changes to interior or exterior walls.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6551 Bertner Ave, Level 04, Houston, TX, 77030
Related Projects
Same Owner
$1.9M totalNearby Projects
Within 1 kmRelated City Permits
Building permits found at or near this location
7,016 SF LOBBY/CORRIDOR/OFFICE REM. 1-21-1-I2-A -SPK-FA 21 IBC
1,313 SF HOSPITAL RMDL (CATH LAB #10) 1-21-1-I2-A-SPK/FA '21 IBC
Watch all construction in 77030 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.