Project intelligenceTDLR TABS2027003179Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Clear Creek High School Priority Repairs in League City, TX

2305 E Main St, League City, TX, 77573

Opening ~Aug 2028Project Registered

Clear Creek High School Priority Repairs is a renovation/alteration project at 2305 E Main St, League City, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $3.5M across about 580 sq ft.

Estimated project value
$3.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
580 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6.07K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 9, 2026669 days across supplied datesAug 8, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    651 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Clear Creek High School Priority Repairs

Clear Creek High School is undergoing a major renovation and alteration project at 2305 E Main St in League City. The work involves campus-wide facility upgrades, specifically including athletic field improvements and the demolition and replacement of existing flooring throughout the building. The project is registered with TDLR under the name Clear Creek High School Priority Repairs.

The estimated cost for this renovation is $3,522,000. The filing lists a square footage of 580 sq ft, resulting in a computed cost of $6,072 per square foot. This project involves public funds and is located on public land in Galveston County. The owner of record is Lindsay Davis, and William T Winning is the registered accessibility specialist.

Timeline and Status

The project was registered with TDLR in October 2026, and construction is also scheduled to start in October 2026. The completion date on the filing is targeted for August 2028. Plan review is pending. The total scheduled build window is 651 days, which is longer than the county median of 120 days for similar renovation filings.

Compared to 1,742 other renovation and alteration filings in Galveston County, this project’s cost is in the top quarter. The median estimated cost for these projects is $250,000, with a middle half ranging from $120,000 to $600,000. The median size for these projects is 3,995 sq ft, while the median cost per square foot is $74. This project’s $6,072 per square foot is significantly above that median.

The site is located in ZIP code 77573, which has a population of about 97,871 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $122,783, and the median owner-occupied home value is $342,000. Galveston County unemployment was 4.9 percent in August 2026, lower than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77573 (League City)

One email per change. Unsubscribe in one click. Privacy.

Clear Creek High School Priority Repairs is a Renovation/Alteration project located at 2305 E Main St, League City, TX 77573 in League City, Texas. The project has an estimated value of $3.5M covering 580 sq ft. Lindsay Davis is the property owner. The project was registered with TDLR on October 9, 2026.

Frequently Asked Questions

What is the estimated cost of the Clear Creek High School renovation?

The estimated cost is $3,522,000. This is above the county median for renovation projects, which is $250,000. The project involves campus-wide upgrades including flooring replacement and athletic field improvements.

When is the Clear Creek High School project targeted for completion?

The project is targeted for August 2028. It was registered with TDLR in October 2026, and construction is also scheduled to start in October 2026. Plan review is pending.

Who is the owner of record for this project?

Lindsay Davis is the owner of record. William T Winning is the registered accessibility specialist. The project is located at 2305 E Main St in League City, Texas.

Is the Clear Creek High School project in a flood zone?

It is designated as zone X according to the FEMA National Flood Hazard Layer by site coordinates.

What type of work is included in the scope?

The scope includes campus-wide renovations and facility upgrades. Specific work includes athletic field improvements and the demolition and replacement of existing flooring throughout the campus.

What is Clear Creek High School Priority Repairs?

Clear Creek High School Priority Repairs is a renovation/alteration project at 2305 E Main St in League City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project includes campus-wide renovations and facility upgrades such as athletic field improvements and the demolition and replacement of existing flooring thru ought the campus.

Is Clear Creek High School Priority Repairs open in League City?

Clear Creek High School Priority Repairs is still under construction in League City, TX, with an estimated completion of Aug 2028 according to its TDLR registration.

Where is Clear Creek High School Priority Repairs located?

Clear Creek High School Priority Repairs is located at 2305 E Main St, League City, TX, 77573, in Galveston County.

Who is the owner or developer of Clear Creek High School Priority Repairs?

Lindsay Davis is the property owner/developer of record for Clear Creek High School Priority Repairs, per its TDLR project registration.

How much does Clear Creek High School Priority Repairs cost and how big is it?

Clear Creek High School Priority Repairs has an estimated construction value of $3.5M and approximately 580 square feet (about $6.07K/sqft), based on its TDLR filing.

Scope of Work

The project includes campus-wide renovations and facility upgrades such as athletic field improvements and the demolition and replacement of existing flooring thru ought the campus.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2305 E Main St, League City, TX, 77573

Loading location map…
29.50107, -95.12206

Watch all construction in 77573 (League City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in League City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.