Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Crosby ISD Athletic Renovation
14703 FM 2100, Crosby, TX, 77532
Crosby ISD Athletic Renovation is a renovation/alteration project at 14703 FM 2100, Crosby, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $3.0M across about 12,050 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 12,050 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $249/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
64 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
212 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Crosby ISD Athletic Renovation
Crosby ISD Field House is the name of the renovation project located at 14703 FM 2100 in Crosby, Texas. Filed under the name Crosby ISD Athletic Renovation, the work involves the interior renovation of two existing one-story pre-engineered metal buildings that serve both the middle school and the high school within the district.
The project was registered with TDLR in October 2026, with construction scheduled to begin in December 2026 and completion targeted for July 2027. This timeline represents a scheduled build window of 212 days, which is longer than the county median of 92 days for similar renovation and alteration filings in Harris County.
Project Scope and Cost
The estimated cost for the Crosby ISD Field House renovation is $3,000,000. This figure places the project above the county median estimated cost of $250,000 for renovation and alteration projects. The resulting cost per square foot is $249, which is above the county median of $80 per square foot. The scope strictly involves interior renovation of the two existing structures, with no mention of new construction or exterior alterations in the filing.
William T Winning is listed as the registered accessibility specialist for the project. The funding source involves public funds, public land, or a Federally funded roadway project. The project status is Project Registered, with plan review pending.
Local Context
Crosby ISD serves a community in ZIP code 77532, which has a population of about 31,778 residents. The median household income in this area is $89,740, and the median owner-occupied home value is $243,700. Housing in the area is predominantly owner-occupied. The Harris County unemployment rate was 5 percent in August 2026, a figure lower than a year earlier.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77532 (Crosby)
One email per change. Unsubscribe in one click. Privacy.
Crosby ISD Athletic Renovation is a Renovation/Alteration project located at 14703 FM 2100, Crosby, TX 77532 in Crosby, Texas. The project has an estimated value of $3.0M covering 12,050 sq ft. Crosby ISD is the property owner. The project was registered with TDLR on October 12, 2026.
Frequently Asked Questions
What is the status of the Crosby ISD Field House renovation?
The project was registered with TDLR in October 2026. Plan review is pending, and construction is targeted for July 2027.
How much does the Crosby ISD Athletic Renovation cost?
The estimated cost is $3,000,000. This is above the Harris County median for renovation projects, which is $250,000.
What is the square footage of the renovation?
The project involves 12,050 sq ft of interior renovation across two existing one-story metal buildings.
When is construction scheduled to start?
Construction start is scheduled for December 2026, with completion targeted for July 2027.
What is Crosby ISD Athletic Renovation?
Crosby ISD Athletic Renovation is a renovation/alteration project at 14703 FM 2100 in Crosby, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE PROJECT IS LOCATED AT 14703 FM 2100, CROSBY, TEXAS 77532, AND INCLUDES INTERIOR RENOVATION OF TWO, 1 STORY, EXISTING PRE-ENGINEERED METAL BUILDINGS SERVING BOTH THE MIDDLE SCHOOL AND THE HIGH SCHOOL IN CROSBY ISD.
Is Crosby ISD Athletic Renovation open in Crosby?
Crosby ISD Athletic Renovation is still under construction in Crosby, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is Crosby ISD Athletic Renovation located?
Crosby ISD Athletic Renovation is located at 14703 FM 2100, Crosby, TX, 77532, in Harris County.
Who is the owner or developer of Crosby ISD Athletic Renovation?
Crosby ISD is the property owner/developer of record for Crosby ISD Athletic Renovation, per its TDLR project registration.
How much does Crosby ISD Athletic Renovation cost and how big is it?
Crosby ISD Athletic Renovation has an estimated construction value of $3.0M and approximately 12,050 square feet (about $249/sqft), based on its TDLR filing.
Scope of Work
THE PROJECT IS LOCATED AT 14703 FM 2100, CROSBY, TEXAS 77532, AND INCLUDES INTERIOR RENOVATION OF TWO, 1 STORY, EXISTING PRE-ENGINEERED METAL BUILDINGS SERVING BOTH THE MIDDLE SCHOOL AND THE HIGH SCHOOL IN CROSBY ISD.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
14703 FM 2100, Crosby, TX, 77532
Related Projects
Watch all construction in 77532 (Crosby)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Crosby?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.