Project intelligenceTDLR TABS2027003345Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

5430 Brystone - Phase II in Houston, TX

5430 Brystone Dr., Houston, TX, 77041

Opening ~Feb 2028Project Registered

5430 Brystone - Phase II is a additions to existing building project at 5430 Brystone Dr., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $3.8M across about 30,185 sq ft.

Estimated project value
$3.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
30,185 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$124/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 12, 2026491 days across supplied datesFeb 15, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    126 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 5430 Brystone - Phase II

Diamond Brystone Properties, LLC is expanding its Houston facility at 5430 Brystone Dr. by adding 30,185 square feet of pre-engineered building space to an existing metal structure. The project, registered with TDLR in October 2026, focuses on creating additional capacity for the assembly of metal parts. Completion is targeted for February 2028.

The construction scope involves integrating a new pre-engineered building section into the current facility footprint. This addition is specifically designed to support industrial assembly operations, increasing the total usable area for metal part production. The work is classified as an addition to an existing building under Harris County regulations.

The estimated cost for this expansion is $3,750,000. This figure places the project above the median estimated cost for similar additions in Harris County, which stands at $442,758. The per-square-foot cost of $124 is also higher than the county median of $100 per square foot for comparable filings.

Timeline and Status

Construction is scheduled to begin in February 2027. The planned build window spans 365 days, which is longer than the county median scheduled build window of 182 days for this type of work. The project remains in the registration phase with plan review pending.

William T Winning is the registered accessibility specialist of record for this project. The funding is private, and the land is privately owned for private use. The project is located in a ZIP code area with a median household income of $79,164 and a median owner-occupied home value of $269,000, according to U.S. Census estimates.

Project Details

The expansion adds significant industrial capacity to the existing site. The pre-engineered nature of the new structure suggests a modular construction approach, potentially allowing for efficient assembly. The focus on metal parts assembly indicates a specialized manufacturing or distribution function within the broader facility.

With a total square footage of 30,185 sq ft, this addition represents a substantial increase in the facility's footprint. The project is privately funded and will not be open to the public as a retail or service location. The construction timeline aligns with standard industrial expansion schedules in the region.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77041 (Houston)

One email per change. Unsubscribe in one click. Privacy.

5430 Brystone - Phase II is a Additions to Existing Building project located at 5430 Brystone Dr., Houston, TX 77041 in Houston, Texas. The project has an estimated value of $3.8M covering 30,185 sq ft. Diamond Brystone Properties, LLC is the property owner. The project was registered with TDLR on October 12, 2026.

Frequently Asked Questions

What is the purpose of the new building addition?

The addition is used for the assembly of metal parts. It expands the existing pre-engineered metal building at 5430 Brystone Dr. in Houston.

When is the project targeted for completion?

The project is targeted for February 2028. Construction is scheduled to start in February 2027, with a planned build window of 365 days.

Who owns the facility at 5430 Brystone Dr.?

Diamond Brystone Properties, LLC is the owner and developer of record. The project is privately funded on private land for private use.

Is the business open to the public?

No, the facts state this is a private industrial addition for metal parts assembly. It is not a public retail or service location.

What is 5430 Brystone - Phase II?

5430 Brystone - Phase II is a additions to existing building project at 5430 Brystone Dr. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: adding 30,185 sf of a pre-engineered building to an existing pre-engineered metal building. Addition to be used for assembly of metal parts

Is 5430 Brystone - Phase II open in Houston?

5430 Brystone - Phase II is still under construction in Houston, TX, with an estimated completion of Feb 2028 according to its TDLR registration.

Where is 5430 Brystone - Phase II located?

5430 Brystone - Phase II is located at 5430 Brystone Dr., Houston, TX, 77041, in Harris County.

Who is the owner or developer of 5430 Brystone - Phase II?

Diamond Brystone Properties, LLC is the property owner/developer of record for 5430 Brystone - Phase II, per its TDLR project registration.

How much does 5430 Brystone - Phase II cost and how big is it?

5430 Brystone - Phase II has an estimated construction value of $3.8M and approximately 30,185 square feet (about $124/sqft), based on its TDLR filing.

Scope of Work

adding 30,185 sf of a pre-engineered building to an existing pre-engineered metal building. Addition to be used for assembly of metal parts

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5430 Brystone Dr., Houston, TX, 77041

Loading location map…
29.84682, -95.57967

Watch all construction in 77041 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.