Funding type
This project is privately funded, on private land for private use.
Power Up BTS in San Antonio, TX
3667 Global Way, San Antonio, TX, 78235
Power Up BTS is a new construction project at 3667 Global Way, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2028. The project has an estimated value of $25.0M across about 500,000 sq ft.
- Estimated project value
- $25.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 500,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $50/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
445 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Power Up BTS
San1 is a 500,000 square foot warehouse shell project at 3667 Global Way in San Antonio. The new construction includes a 25,000 square foot mezzanine and is privately funded on private land for private use. The filing identifies the project name as Power Up BTS.
Project Scope and Design
One FourTwo Architecture, P.C. serves as the design firm of record for San1. The estimated cost for the project is $25,000,000, which computes to $50 per square foot. This cost per square foot is below the county median of $115 for similar new construction filings in Bexar County, while the total estimated cost is above the county median for its type.
Kam-hung Kenneth Woo is the registered accessibility specialist associated with the TDLR filing for San1. The project was registered with TDLR in October 2026, and plan review was completed in the same month. Construction start is recorded as October 2026. The status of the TDLR record is Review Complete, indicating that the regulatory review phase has concluded.
Timeline and Location Context
The scheduled build window is 445 days, which is longer than the county median of 206 days for new construction projects. The project is scheduled to finish in January 2028.
The surrounding ZIP code 78235 has a population of about 2,440 residents, according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $64,919, and there are 1,279 housing units. Bexar County had an unemployment rate of 4.6 percent in August 2026, which was lower than a year earlier. These demographic and economic figures provide context for the local environment in which this large-scale industrial development is taking place.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78235 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
Power Up BTS is a New Construction project located at 3667 Global Way, San Antonio, TX 78235 in San Antonio, Texas. The project has an estimated value of $25.0M covering 500,000 sq ft. San Antonio Global I, LLC is the property owner and One FourTwo Architecture, P.C. is the design firm of record. The project was registered with TDLR on October 13, 2026.
Frequently Asked Questions
What is the total size of the San1 project?
The project is 500,000 square feet, including a 25,000 square foot mezzanine within the warehouse shell.
Who is the owner of record?
San Antonio Global I, LLC is the owner and developer of record for this construction project.
What is the estimated cost per square foot?
The estimated cost is $50 per square foot, based on a total project cost of $25,000,000.
When is construction scheduled to finish?
Construction is scheduled to finish in January 2028, with work starting in October 2026.
What is Power Up BTS?
Power Up BTS is a new construction project at 3667 Global Way in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: warehouse shell with 25K SF mezzanine
Is Power Up BTS open in San Antonio?
Power Up BTS is still under construction in San Antonio, TX, with an estimated completion of Jan 2028 according to its TDLR registration.
Where is Power Up BTS located?
Power Up BTS is located at 3667 Global Way, San Antonio, TX, 78235, in Bexar County.
Who is the owner or developer of Power Up BTS?
San Antonio Global I, LLC is the property owner/developer of record for Power Up BTS, per its TDLR project registration.
Who is the architect or design firm for Power Up BTS?
One FourTwo Architecture, P.C. is the design firm of record for Power Up BTS, according to its TDLR filing.
How much does Power Up BTS cost and how big is it?
Power Up BTS has an estimated construction value of $25.0M and approximately 500,000 square feet (about $50/sqft), based on its TDLR filing.
Scope of Work
warehouse shell with 25K SF mezzanine
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3667 Global Way, San Antonio, TX, 78235
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 78235 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.