Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Destination Trails Segment 1B in Houston, TX
Brays Bayou Greenway Trl, Houston, TX 77021, Houston, TX 77002, Houston, TX, 77021
Destination Trails Segment 1B is a renovation/alteration project at Brays Bayou Greenway Trl, Houston, TX 77021, Houston, TX 77002, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $1.5M across about 13,000 sq ft.
- Estimated project value
- $1.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 13,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $115/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
6 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
57 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
105 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Destination Trails Segment 1B
The Harris County Engineer Department is leading a $1,500,000 renovation project for the Destination Trails Segment 1B on Brays Bayou Greenway Trail in Houston. This 13,000 sq ft initiative focuses on adding additional trail infrastructure and retaining walls beneath a bridge. The work is classified as a renovation or alteration and is scheduled to finish in March 2027.
Project Scope and Location
The filing specifies that the primary scope involves constructing new trail sections and retaining walls that go under a bridge. The project site is located in Harris County, with addresses listed for both Houston, TX 77021, and Houston, TX 77002. The estimated cost of $1,500,000 translates to $115 per square foot. This figure is above the county median of $80 per square foot for similar renovation filings in Harris County.
Timeline and Status
TDLR completed the plan review in October 2026. Construction is scheduled to begin in December 2026 and is scheduled to finish in March 2027. The total build window is 105 days, which is close to the county median of 92 days for comparable projects. The TDLR status is listed as Review Complete.
Owner and Funding
Harris County Engineering is the owner of record for this project. The filing indicates that the project involves public funds, public land, or is a Federally funded roadway project. Robert W Green is the registered accessibility specialist associated with the filing. This is one of several projects managed by Harris County Engineering, which has six other TDLR-registered projects totaling $43,777,930 in the region.
Area Context
The project is situated in a FEMA Special Flood Hazard Area, specifically zone AE, according to the National Flood Hazard Layer. Census estimates for ZIP code 77021 indicate a population of about 24,884 and a median household income of $45,034. The area has 12,819 housing units, with a median owner-occupied home value of $203,900. The Harris County unemployment rate was 5 percent in August 2026, lower than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77021 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Destination Trails Segment 1B is a Renovation/Alteration project located at Brays Bayou Greenway Trl, Houston, TX 77021, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $1.5M covering 13,000 sq ft. Harris County Engineering is the property owner. The project was registered with TDLR on October 14, 2026.
Frequently Asked Questions
What is the estimated cost of this project?
The estimated cost for the Destination Trails Segment 1B renovation is $1,500,000. This amount is above the median estimated cost for renovation projects in Harris County.
When is construction scheduled to start and finish?
Construction is scheduled to start in December 2026. The project is scheduled to finish in March 2027, following a 105-day build window.
Who is the owner of record?
Harris County Engineering is listed as the owner or developer of record for this specific accessibility and trail renovation project.
Is the project located in a flood zone?
Yes, the site is inside a FEMA Special Flood Hazard Area, specifically zone AE, according to the National Flood Hazard Layer data.
What specific work is being done?
The scope of work includes adding additional trail sections and retaining walls that go under a bridge as part of the Destination Trails Segment 1B.
What is Destination Trails Segment 1B?
Destination Trails Segment 1B is a renovation/alteration project at Brays Bayou Greenway Trl, Houston, TX 77021, Houston, TX 77002 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additional trail and retaining walls to be added going under bridge
Is Destination Trails Segment 1B open in Houston?
Destination Trails Segment 1B is still under construction in Houston, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is Destination Trails Segment 1B located?
Destination Trails Segment 1B is located at Brays Bayou Greenway Trl, Houston, TX 77021, Houston, TX 77002, Houston, TX, 77021, in Harris County.
Who is the owner or developer of Destination Trails Segment 1B?
Harris County Engineering is the property owner/developer of record for Destination Trails Segment 1B, per its TDLR project registration.
How much does Destination Trails Segment 1B cost and how big is it?
Destination Trails Segment 1B has an estimated construction value of $1.5M and approximately 13,000 square feet (about $115/sqft), based on its TDLR filing.
Scope of Work
Additional trail and retaining walls to be added going under bridge
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Brays Bayou Greenway Trl, Houston, TX 77021, Houston, TX 77002, Houston, TX, 77021
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 77021 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.