Greenway Trail and Thoroughfare Connector Trail in Temple, TX

20702 SE H K Dodgen Loop, Temple, TX, 76501

Opening ~Sep 2028Project Registered

Greenway Trail and Thoroughfare Connector Trail is a new construction project at 20702 SE H K Dodgen Loop, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2028. The project has an estimated value of $2.8M across about 8,200 sq ft.

Estimated project value
$2.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$341/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 16, 2026686 days across supplied datesSep 1, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    320 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    366 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Greenway Trail and Thoroughfare Connector Trail

Greenway Trail and Thoroughfare Connector Trail is an 8,200-foot new construction project located at 20702 SE H K Dodgen Loop in Temple, Texas. The development is registered with TDLR and is targeted for September 2028. This privately funded trail is aligned with the city's master planning, serving as a dedicated thoroughfare connector within Bell County.

The project is owned by Rowan Stampede, LLC, which has engaged Langan, LLC as the design firm of record. Elaine K Andersen serves as the registered accessibility specialist for the build. The estimated cost for this construction is $2,800,000. This valuation places the project above the median estimated cost for new construction filings in the region, reflecting the significant infrastructure investment involved in the trail's development.

Construction Timeline and Scale

Construction is scheduled to begin in September 2027, following a registration date of October 2026. The planned build window spans 366 days, which is longer than the county median of 242 days for similar projects. This extended timeline allows for the careful alignment of the 8,200-square-foot trail with existing land use plans. The cost per square foot is calculated at $341, a figure that exceeds the county median of $151 for new construction work.

This location detail is relevant for long-term infrastructure planning and maintenance. The project is privately funded and intended for private use, distinguishing it from public municipal works. The registration status remains active, with plan review pending as the team prepares for the start of physical construction in the coming year.

Resident and business interest in this area is supported by the local economic profile. Census estimates for ZIP code 76501 indicate a population of approximately 17,223 and a median household income of $50,764. The housing stock consists of 7,298 units, with the majority being owner-occupied. The median owner-occupied home value is estimated at $151,000. These figures provide context for the community in which this new trail infrastructure will be integrated.

Bell County's labor market remains stable, with an unemployment rate of 5.2 percent in August 2026. This rate is lower than the figure recorded a year earlier, suggesting a steady workforce availability for the construction phase. The project's registration with TDLR ensures compliance with state accessibility standards, a critical component for trail infrastructure. The final completion date is targeted for September 2028, marking the end of the scheduled construction period.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76501 (Temple)

One email per change. Unsubscribe in one click. Privacy.

Greenway Trail and Thoroughfare Connector Trail is a New Construction project located at 20702 SE H K Dodgen Loop, Temple, TX 76501 in Temple, Texas. The project has an estimated value of $2.8M covering 8,200 sq ft. Rowan Stampede, LLC is the property owner and Langan, LLC is the design firm of record. The project was registered with TDLR on October 16, 2026.

Frequently Asked Questions

What is the estimated cost of the Greenway Trail project?

The estimated cost for the Greenway Trail and Thoroughfare Connector Trail is $2,800,000. This amount covers the new construction of the 8,200-foot trail aligned with city master planning in Temple, Texas.

When is construction scheduled to start and finish?

Construction is scheduled to start in September 2027. The project is targeted for September 2028 completion, following a 366-day build window that is longer than the county median.

Who is the owner and design firm for this trail?

Rowan Stampede, LLC is the owner of record. Langan, LLC serves as the design firm, while Elaine K Andersen is the registered accessibility specialist for the project.

Is the Greenway Trail located in a flood zone?

The location is classified as zone X according to the FEMA National Flood Hazard Layer.

How does the cost per square foot compare to the county median?

The project's cost per square foot is $341. This is above the county median of $151 for new construction filings in Bell County.

What is Greenway Trail and Thoroughfare Connector Trail?

Greenway Trail and Thoroughfare Connector Trail is a new construction project at 20702 SE H K Dodgen Loop in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 8,200-ft trail aligned with city master planning.

Is Greenway Trail and Thoroughfare Connector Trail open in Temple?

Greenway Trail and Thoroughfare Connector Trail is still under construction in Temple, TX, with an estimated completion of Sep 2028 according to its TDLR registration.

Where is Greenway Trail and Thoroughfare Connector Trail located?

Greenway Trail and Thoroughfare Connector Trail is located at 20702 SE H K Dodgen Loop, Temple, TX, 76501, in Bell County.

Who is the owner or developer of Greenway Trail and Thoroughfare Connector Trail?

Rowan Stampede, LLC is the property owner/developer of record for Greenway Trail and Thoroughfare Connector Trail, per its TDLR project registration.

Who is the architect or design firm for Greenway Trail and Thoroughfare Connector Trail?

Langan, LLC is the design firm of record for Greenway Trail and Thoroughfare Connector Trail, according to its TDLR filing.

How much does Greenway Trail and Thoroughfare Connector Trail cost and how big is it?

Greenway Trail and Thoroughfare Connector Trail has an estimated construction value of $2.8M and approximately 8,200 square feet (about $341/sqft), based on its TDLR filing.

Scope of Work

A 8,200-ft trail aligned with city master planning.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20702 SE H K Dodgen Loop, Temple, TX, 76501

Loading location map…
31.07159, -97.31662

Watch all construction in 76501 (Temple)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.