MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS in Bunker Hill Village, TX

Memorial Dr from Tealwood N to Plantation Rd Memorial Drive at Gessner Road, Bunker Hill Village, TX, 77024

Opening ~Feb 2029Project Registered

MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS is a new construction project at Memorial Dr from Tealwood N to Plantation Rd Memorial Drive at Gessner Road, Bunker Hill Village, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2029. The project has an estimated value of $7.7M across about 233,000 sq ft.

Estimated project value
$7.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
233,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$33/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 19, 2026836 days across supplied datesFeb 1, 2029

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    470 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    366 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS

The City of Bunker Hill Village is undertaking a full roadway reconstruction of Memorial Drive and Gessner Road, a project with an estimated cost of $7,655,000. This new construction effort covers 233,000 sq ft of infrastructure in Harris County. The work is targeted for February 2029, following a scheduled start in February 2028. The project was registered with TDLR in October 2026, and plan review is pending.

The scope includes concrete pavement, sidewalks, driveways, storm sewer, water lines, sanitary sewer, and traffic signal improvements. This comprehensive upgrade addresses multiple utility and surface components simultaneously. The site is located in Bunker Hill Village, TX 77024, specifically from Tealwood N to Plantation Rd. The project involves public funds and is situated on public land. It is a Federally funded roadway project.

Project Scale and Cost Context

At $7,655,000, this project’s cost is above the county median for its type in Harris County. The median estimated cost for similar new construction filings is $750,000. The scheduled build window of 366 days is longer than the county median of 223 days. However, the cost per square foot is $33, which is below the county median of $88. This indicates a large-scale infrastructure investment with a lower per-unit cost typical of roadway projects.

The registered accessibility specialist for this filing is Holly Respondek. The City of Bunker Hill Village is the owner of record. This status ensures the site is not subject to specific floodplain development restrictions. The project is part of a broader municipal effort to improve local infrastructure.

The City of Bunker Hill Village has one other TDLR-registered project, the Public Works and Disaster Operations Building, which is closed. That project had a cost of $1,500,000. The current roadway project is significantly larger in scope and budget. The area profile for ZIP 77024 shows a population of about 37,647 and a median household income of $142,039. These Census estimates provide context for the community served by this improvement. The Harris County unemployment rate was 5 percent in August 2026.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77024 (Bunker Hill Village)

One email per change. Unsubscribe in one click. Privacy.

MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS is a New Construction project located at Memorial Dr from Tealwood N to Plantation Rd Memorial Drive at Gessner Road, Bunker Hill Village, TX 77024 in Bunker Hill Village, Texas. The project has an estimated value of $7.7M covering 233,000 sq ft. City of Bunker Hill Village is the property owner. The project was registered with TDLR on October 19, 2026.

Frequently Asked Questions

When is the Memorial Drive and Gessner Road project expected to finish?

The completion date on the filing is targeted for February 2029. Construction is scheduled to begin in February 2028. The project was registered with TDLR in October 2026. Plan review is pending.

What is the total estimated cost of this roadway reconstruction?

The estimated cost is $7,655,000. This figure covers full roadway reconstruction including pavement, utilities, and traffic signals. The cost per square foot is $33. This is below the Harris County median of $88 per square foot.

Who is the owner of record for this project?

The City of Bunker Hill Village is the owner/developer of record. Holly Respondek is the registered accessibility specialist. The project involves public funds and is a Federally funded roadway project. It is located in Bunker Hill Village, Texas.

Is the project located in a flood zone?

It is designated as zone X. This means the location is not within the mapped area of highest flood risk. This status is based on FEMA National Flood Hazard Layer data.

What specific improvements are included in the scope of work?

The scope includes concrete pavement, sidewalk, driveway, storm sewer, water line, sanitary sewer, and traffic signal improvement. This is a full roadway reconstruction. The project covers 233,000 sq ft of new construction infrastructure in Harris County.

What is MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS?

MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS is a new construction project at Memorial Dr from Tealwood N to Plantation Rd Memorial Drive at Gessner Road in Bunker Hill Village, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Full roadway reconstruction, including concrete pavement, sidewalk, driveway, storm sewer, Water line, sanitary sewer, and traffic signal improvement

Is MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS open in Bunker Hill Village?

MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS is still under construction in Bunker Hill Village, TX, with an estimated completion of Feb 2029 according to its TDLR registration.

Where is MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS located?

MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS is located at Memorial Dr from Tealwood N to Plantation Rd Memorial Drive at Gessner Road, Bunker Hill Village, TX, 77024, in Harris County.

Who is the owner or developer of MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS?

City of Bunker Hill Village is the property owner/developer of record for MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS, per its TDLR project registration.

How much does MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS cost and how big is it?

MEMORIAL DRIVE AND GESSNER ROAD IMPROVEMENTS has an estimated construction value of $7.7M and approximately 233,000 square feet (about $33/sqft), based on its TDLR filing.

Scope of Work

Full roadway reconstruction, including concrete pavement, sidewalk, driveway, storm sewer, Water line, sanitary sewer, and traffic signal improvement

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Memorial Dr from Tealwood N to Plantation Rd Memorial Drive at Gessner Road, Bunker Hill Village, TX, 77024

Loading location map…
29.81198, -95.37412

Watch all construction in 77024 (Bunker Hill Village)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Bunker Hill Village?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.