This project involves public funds, public land, or is a Federally funded roadway project.
E Dove Road Sidewalk in Southlake, TX
1400 Main St, Southlake, TX, 76092
E Dove Road Sidewalk is a new construction project at 1400 Main St, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $27.2M across about 90,000 sq ft.
- Estimated project value
- $27.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 90,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $302/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
20 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
233 days after the preceding date shown.
Source: TDLR filing
View source record
📰About E Dove Road Sidewalk
The E Dove Road Sidewalk project in Southlake, Texas, involves the installation of a new sidewalk along 90,000 square feet of public right-of-way. The City of Southlake is the owner of record for this new construction work. The project is registered with the Texas Department of Licensing and Regulation (TDLR) and involves public funds.
The estimated cost for the E Dove Road Sidewalk is $27,160,894. This places the project in the top quarter of estimated costs for new construction filings in Tarrant County, where the median cost is $800,000. The cost per square foot is $302, which is above the county median of $120. The scope of work is specifically the installation of new sidewalk infrastructure.
Construction for the E Dove Road Sidewalk is scheduled to begin in November 2026. The project was registered with TDLR in October 2026, and plan review is pending. Completion is targeted for June 2027. The scheduled build window is 233 days, which is close to the county median of 214 days for similar projects.
Project Details and Location
The site is located at 1400 Main St, Southlake, TX 76092, in Tarrant County. The City of Southlake has six other TDLR-registered projects totaling $45,130,900, including the Municipal Service Center and Public Safety Training Tower.
Southlake has a population of about 31,344, according to U.S. Census ACS 2023 five-year estimates for ZIP 76092. The median household income is $250,001, and the median owner-occupied home value is $956,200. The Tarrant County unemployment rate was 4.4 percent in August 2026, lower than a year earlier. Gerald A Ward is the registered accessibility specialist for the E Dove Road Sidewalk project.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76092 (Southlake)
One email per change. Unsubscribe in one click. Privacy.
E Dove Road Sidewalk is a New Construction project located at 1400 Main St, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $27.2M covering 90,000 sq ft. City of Southlake is the property owner. The project was registered with TDLR on October 20, 2026.
Frequently Asked Questions
What is the estimated cost of the E Dove Road Sidewalk project?
The estimated cost is $27,160,894. This is above the Tarrant County median for new construction, which is $800,000. The cost per square foot is $302.
When is the E Dove Road Sidewalk project expected to be completed?
Completion is targeted for June 2027. Construction is scheduled to start in November 2026, and plan review is pending.
Who is the owner of the E Dove Road Sidewalk project?
The City of Southlake is the owner/developer of record. The project involves public funds and public land.
Is the E Dove Road Sidewalk project in a flood zone?
It is designated as zone X according to the FEMA National Flood Hazard Layer.
How large is the E Dove Road Sidewalk project?
The project covers 90,000 square feet. This is significantly larger than the Tarrant County median size of 8,296 square feet for new construction.
What is E Dove Road Sidewalk?
E Dove Road Sidewalk is a new construction project at 1400 Main St in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of new sidewalk
Is E Dove Road Sidewalk open in Southlake?
E Dove Road Sidewalk is still under construction in Southlake, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is E Dove Road Sidewalk located?
E Dove Road Sidewalk is located at 1400 Main St, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of E Dove Road Sidewalk?
City of Southlake is the property owner/developer of record for E Dove Road Sidewalk, per its TDLR project registration.
How much does E Dove Road Sidewalk cost and how big is it?
E Dove Road Sidewalk has an estimated construction value of $27.2M and approximately 90,000 square feet (about $302/sqft), based on its TDLR filing.
Scope of Work
Installation of new sidewalk
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1400 Main St, Southlake, TX, 76092
Related Projects
Watch all construction in 76092 (Southlake)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Southlake?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.