Project intelligenceTDLR TABS2027004094New Construction
Funding type

This project is privately funded, on private land for private use.

Morgan's Inclusion Tunnel in San Antonio, TX

5235 David Edwards Drive, San Antonio, TX, 78233

Opening ~Nov 2027Project Registered

Morgan's Inclusion Tunnel is a new construction project at 5235 David Edwards Drive, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $1.4M across about 36,760 sq ft.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
36,760 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$38/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 21, 2026386 days across supplied datesNov 11, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    21 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Morgan's Inclusion Tunnel

A new 13.5-foot diameter accessibility tunnel is being constructed at 5235 David Edwards Drive in San Antonio. The project, filed under the name Morgan's Inclusion Tunnel, is a new construction effort for Morgan's Wonderland. It covers a total area of 36,760 square feet and is estimated to cost $1,400,000.

The work is privately funded and located on private land for private use. Gordon Hartman is the owner of record, while Stephen A Meyer serves as the registered accessibility specialist. The project was registered with TDLR in October 2026, and plan review is pending. Construction is scheduled to begin in November 2026.

Project Scope and Economics

The estimated cost of $1,400,000 places this project above the median estimated cost of $600,000 for new construction filings in Bexar County. The size of 36,760 square feet exceeds the county median of 6,358 square feet. However, the computed cost per square foot of $38 is below the county median of $115 per square foot.

The scheduled build window is 365 days, which is longer than the county median of 207 days. Completion is targeted for November 2027. This timeline and scale distinguish the project from typical local filings, reflecting the specialized nature of the accessibility infrastructure being built.

Local Context and Permitting

The site is located in ZIP code 78233, where the U.S. Census estimates the population at about 47,172. The median household income in this area is $68,157, and the median owner-occupied home value is $185,800. City of San Antonio records show three permits on file at this street address, issued between December 2025 and October 2026. These include two Electrical TML Permits and one Electrical General Permit.

The Bexar County unemployment rate was 4.6 percent in August 2026, lower than a year earlier. The project status remains Project Registered with TDLR, with no indication of completion beyond the targeted date.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78233 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

Morgan's Inclusion Tunnel is a New Construction project located at 5235 David Edwards Drive, San Antonio, TX 78233 in San Antonio, Texas. The project has an estimated value of $1.4M covering 36,760 sq ft. Gordon Hartman is the property owner. The project was registered with TDLR on October 21, 2026.

Frequently Asked Questions

What is the exact address of the project?

The project is located at 5235 David Edwards Drive, San Antonio, TX 78233. This address is in Bexar County, Texas.

Who is the owner of record?

Gordon Hartman is listed as the owner or developer of record for this project. Stephen A Meyer is the registered accessibility specialist.

What is the estimated cost?

The estimated cost for the new construction is $1,400,000. This figure is for the 13.5-foot diameter accessibility tunnel.

Is the project open to the public?

The project is under construction and not open. It is privately funded and for private use. Completion is targeted for November 2027.

When is construction scheduled to start?

Construction is scheduled to begin in November 2026, according to the TDLR filing. The project was registered in October 2026.

What is Morgan's Inclusion Tunnel?

Morgan's Inclusion Tunnel is a new construction project at 5235 David Edwards Drive in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 13.5' OD accessibility tunnel for Morgan's Campus

Is Morgan's Inclusion Tunnel open in San Antonio?

Morgan's Inclusion Tunnel is still under construction in San Antonio, TX, with an estimated completion of Nov 2027 according to its TDLR registration.

Where is Morgan's Inclusion Tunnel located?

Morgan's Inclusion Tunnel is located at 5235 David Edwards Drive, San Antonio, TX, 78233, in Bexar County.

Who is the owner or developer of Morgan's Inclusion Tunnel?

Gordon Hartman is the property owner/developer of record for Morgan's Inclusion Tunnel, per its TDLR project registration.

How much does Morgan's Inclusion Tunnel cost and how big is it?

Morgan's Inclusion Tunnel has an estimated construction value of $1.4M and approximately 36,760 square feet (about $38/sqft), based on its TDLR filing.

Scope of Work

13.5' OD accessibility tunnel for Morgan's Campus

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5235 David Edwards Drive, San Antonio, TX, 78233

Loading location map…
29.53820, -98.39336

Related City Permits

Building permits found at or near this location

5235 DAVID EDWARDS DR, City of San Antonio, TX 78233

SPC Tunnel

IssuedElectrical TOPS PermitNewOct 2026
SAT-COM-BLG-PMT26-40200523
5235 DAVID EDWARDS DR, City of San Antonio, TX 78233

TML 2 Boring Machine

IssuedElectrical TML PermitOct 2026
SAT-MEP-TML-PMT26-44028583
5235 DAVID EDWARDS DR, City of San Antonio, TX 78233

Boring Job Trailer TML#T1

IssuedElectrical TML PermitSep 2026
SAT-MEP-TML-PMT26-44028201
5235 DAVID EDWARDS DR, City of San Antonio, TX 78233

10808 Quarry Park

IssuedElectrical General PermitDec 2025
SAT-MEP-ELE-PMT25-33336017

Watch all construction in 78233 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.