Project intelligenceTDLR TABS2027004181Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Love's 542 EV Charging Station in Fort Stockton, TX

2723 East US Highway 290, Fort Stockton, TX, 79735

Opening ~Apr 2027Project Registered

Love's 542 EV Charging Station is a renovation/alteration project at 2723 East US Highway 290, Fort Stockton, in Pecos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $600K across about 1,600 sq ft.

Estimated project value
$600K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,600 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$375/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 22, 2026186 days across supplied datesApr 26, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    130 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Love's 542 EV Charging Station

Loves Travel Stop #542 in Fort Stockton is undergoing a renovation focused on electric vehicle infrastructure. The project, filed with the Texas Department of Licensing and Regulation as "Love's 542 EV Charging Station -Fort Stockton, TX," involves the installation of four single electric vehicle charging stations, one power cabinet, and one 2000a electrical switchgear. The work is located at 2723 East US Highway 290 in Pecos County.

The estimated cost for this alteration is $600,000, covering 1,600 sq ft of space. This results in a computed cost of $375 per sq ft. The project is privately funded on private land for private use. Loves Travel Stops is the owner and developer of record for this specific location.

Design and Timeline

Larson Design Group serves as the design firm of record. James J Heilman is the registered accessibility specialist associated with the filing. The construction start date per the filing is March 2027, with completion targeted for April 2027. The project was registered with TDLR in October 2026, and plan review is pending.

Compared to other renovation and alteration filings in Pecos County, this project’s cost is above the county median of $275,000 for its type. The scheduled build window of 56 days is shorter than the county median of 123 days. The $375 per sq ft cost is above the county median of $101 per sq ft. Larson Design Group has six other TDLR-registered projects totaling $4,651,943, including locations in Sweetwater, Edinburg, and Weimar.

The surrounding area, ZIP code 79735, has a population of about 12,962 according to U.S. Census ACS 2023 five-year estimates. The median household income is $69,902, and the median owner-occupied home value is $151,600. Housing in this area is predominantly owner-occupied. The Pecos County unemployment rate was 4.9 percent in August 2026.

Readers should note that the TDLR record reflects construction status and registration details. It does not confirm business hours, menu availability, or operational status. The project is registered, but specific operational details are not part of this filing.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79735 (Fort Stockton)

One email per change. Unsubscribe in one click. Privacy.

Love's 542 EV Charging Station is a Renovation/Alteration project located at 2723 East US Highway 290, Fort Stockton, TX 79735 in Fort Stockton, Texas. The project has an estimated value of $600K covering 1,600 sq ft. Loves Travel Stops is the property owner and Larson Design Group is the design firm of record. The project was registered with TDLR on October 22, 2026.

Frequently Asked Questions

Is Loves Travel Stop #542 open for business?

The TDLR record indicates the project is registered with a completion date targeted for April 2027. It does not confirm current operational status or business hours.

What is the scope of work for this project?

The scope includes the installation of four single electric vehicle charging stations, one power cabinet, and one 2000a electrical switchgear.

Who is the design firm for this project?

Larson Design Group is the design firm of record for the Loves Travel Stop #542 renovation in Fort Stockton.

What is the estimated cost of the project?

The estimated cost is $600,000, covering 1,600 sq ft of space with a computed cost of $375 per sq ft.

When is the project targeted for completion?

The project is targeted for April 2027, with a construction start date of March 2027 per the filing.

What is Love's 542 EV Charging Station?

Love's 542 EV Charging Station is a renovation/alteration project at 2723 East US Highway 290 in Fort Stockton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of four single electric vehicle charging stations, one power cabinet, one 2000a electrical switchgear.

Is Love's 542 EV Charging Station open in Fort Stockton?

Love's 542 EV Charging Station is still under construction in Fort Stockton, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is Love's 542 EV Charging Station located?

Love's 542 EV Charging Station is located at 2723 East US Highway 290, Fort Stockton, TX, 79735, in Pecos County.

Who is the owner or developer of Love's 542 EV Charging Station?

Loves Travel Stops is the property owner/developer of record for Love's 542 EV Charging Station, per its TDLR project registration.

Who is the architect or design firm for Love's 542 EV Charging Station?

Larson Design Group is the design firm of record for Love's 542 EV Charging Station, according to its TDLR filing.

How much does Love's 542 EV Charging Station cost and how big is it?

Love's 542 EV Charging Station has an estimated construction value of $600K and approximately 1,600 square feet (about $375/sqft), based on its TDLR filing.

Scope of Work

Installation of four single electric vehicle charging stations, one power cabinet, one 2000a electrical switchgear.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2723 East US Highway 290, Fort Stockton, TX, 79735

Loading location map…
30.89354, -102.85248

Watch all construction in 79735 (Fort Stockton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Stockton?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.