Project intelligenceTDLR TABS2027004218New Construction
Funding type

This project is privately funded, on private land for private use.

YES Prep. North Rankin Secondary in Houston, TX

13750 Northborough Dr., Houston, TX, 77067

Opening ~Jul 2028Project Registered

YES Prep. North Rankin Secondary is a new construction project at 13750 Northborough Dr., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2028. The project has an estimated value of $20.0M across about 98,527 sq ft.

Estimated project value
$20.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
98,527 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$203/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 22, 2026618 days across supplied datesJul 1, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    191 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    427 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About YES Prep. North Rankin Secondary

YES Prep. North Rankin Secondary is a new 3-story secondary school building under construction at 13750 Northborough Dr. in Houston, Texas. The project spans 98,527 square feet and carries an estimated cost of $20,000,000.

Project Scope and Design

Element Architects serves as the design firm of record for this facility. The registered accessibility specialist listed in the filing is Tim Mullins. The project is privately funded and located on private land for private use. The construction phase began in May 2027, following the initial registration with the Texas Department of Licensing and Regulation in October 2026. Plan review is pending, and the completion date is targeted for July 2028.

This development is part of a broader portfolio managed by YES Prep. Public Schools. The owner has five other TDLR-registered projects in the region, including YES Prep. Northside Elementary and YES Prep. 5th Ward Elementary, each valued at $17,000,000. The total value of these six projects exceeds $69,450,000. Element Architects also designed YES Prep. Northside Elementary, which is registered with the state.

Market Context and Location

The estimated cost per square foot for this project is $203. This figure is above the Harris County median of $88 per square foot for new construction filings. The scheduled build window of 427 days is longer than the county median of 223 days. The estimated total cost is in the top quarter of recent filings in the area, where the median cost for new construction is $750,000.

The surrounding area in ZIP code 77067 has a population of about 31,800 according to U.S. Census American Community Survey 2023 five-year estimates. The median household income in this area is $51,278, and the median owner-occupied home value is $174,600. Housing in this region is mostly renter-occupied. The Harris County unemployment rate was 5 percent in August 2026, which is lower than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77067 (Houston)

One email per change. Unsubscribe in one click. Privacy.

YES Prep. North Rankin Secondary is a New Construction project located at 13750 Northborough Dr., Houston, TX 77067 in Houston, Texas. The project has an estimated value of $20.0M covering 98,527 sq ft. YES Prep. Public Schools is the property owner and Element Architects is the design firm of record. The project was registered with TDLR on October 22, 2026.

Frequently Asked Questions

Where is YES Prep. North Rankin Secondary located?

The project is located at 13750 Northborough Dr. in Houston, Texas 77067. It is a new 3-story secondary school building in Harris County.

When will construction be completed?

The completion date on the filing is targeted for July 2028. Construction started in May 2027, and plan review is pending.

Who is the design firm for this school?

Element Architects is the design firm of record. Tim Mullins is the registered accessibility specialist for the project.

Is the school open for enrollment?

The TDLR record indicates construction status, not operational status. The project is under construction with a completion date targeted for July 2028.

How much does the project cost?

The estimated cost is $20,000,000. This works out to $203 per square foot for the 98,527-square-foot building.

What is YES Prep. North Rankin Secondary?

YES Prep. North Rankin Secondary is a new construction project at 13750 Northborough Dr. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 3 story secondary school building

Is YES Prep. North Rankin Secondary open in Houston?

YES Prep. North Rankin Secondary is still under construction in Houston, TX, with an estimated completion of Jul 2028 according to its TDLR registration.

Who is the owner or developer of YES Prep. North Rankin Secondary?

YES Prep. Public Schools is the property owner/developer of record for YES Prep. North Rankin Secondary, per its TDLR project registration.

Who is the architect or design firm for YES Prep. North Rankin Secondary?

Element Architects is the design firm of record for YES Prep. North Rankin Secondary, according to its TDLR filing.

How much does YES Prep. North Rankin Secondary cost and how big is it?

YES Prep. North Rankin Secondary has an estimated construction value of $20.0M and approximately 98,527 square feet (about $203/sqft), based on its TDLR filing.

Scope of Work

New 3 story secondary school building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

13750 Northborough Dr., Houston, TX, 77067

Loading location map…
29.96324, -95.42583

Watch all construction in 77067 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.