Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr in Crowley, TX
400 Blk. Harvey St., 300-400 Blk. E Glendale St. 300-400 Blk. Bovell Dr., Crowley, TX, 76036
Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr is a new construction project at 400 Blk. Harvey St., 300-400 Blk. E Glendale St. 300-400 Blk. Bovell Dr., Crowley, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $180K across about 10,156 sq ft.
- Estimated project value
- $180K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,156 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $18/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
53 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
37 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr
The project, formally named Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr, involves new construction along the 400 block of Harvey Street, the 300-400 blocks of East Glendale Street, and the 300-400 blocks of Bovell Drive in Crowley. The scope includes the installation of 10,156 square feet of concrete sidewalk and lead walk, along with eight curb ramps. Work is targeted for November 2026, following a construction start date of August 2026.
Teague Nail and Perkins, Inc. serves as the design firm of record, with Mary Rae Davies listed as the registered accessibility specialist. The City of Crowley is the owner of record. The project was registered with the Texas Department of Licensing and Regulation in October 2026, and plan review is pending. The estimated total cost is $180,000, equating to $18 per square foot.
Project Context and Scale
This initiative is one of several public works projects managed by the City of Crowley, which has six other TDLR-registered projects totaling $10,100,490. Those previous projects, including Crowley City Hall and the Crowley Grove, are marked as closed. The estimated cost for this sidewalk project is below the county median for new construction filings in Tarrant County, which stands at $800,000. The scheduled build window of 90 days is shorter than the county median of 214 days.
The project involves public funds and public land. The surrounding area, ZIP code 76036, has a population of about 34,145 residents. Median household income in this area is estimated at $94,124, and the median owner-occupied home value is $288,700, according to U.S. Census estimates. The registration status confirms the project is moving forward in accordance with state accessibility requirements.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76036 (Crowley)
One email per change. Unsubscribe in one click. Privacy.
Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr is a New Construction project located at 400 Blk. Harvey St., 300-400 Blk. E Glendale St. 300-400 Blk. Bovell Dr., Crowley, TX 76036 in Crowley, Texas. The project has an estimated value of $180K covering 10,156 sq ft. City of Crowley is the property owner and Teague Nail and Perkins, Inc. is the design firm of record. The project was registered with TDLR on October 23, 2026.
Frequently Asked Questions
When is the sidewalk project expected to be completed?
The project is targeted for November 2026, with construction starting in August 2026.
Who is designing the new sidewalks on Harvey Street?
Teague Nail and Perkins, Inc. is the design firm of record for this project.
How much concrete sidewalk will be installed?
The project includes 10,156 square feet of concrete sidewalk and lead walk.
Is this project currently open for public use?
The project is in the construction phase, with completion targeted for November 2026.
What is Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr?
Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr is a new construction project at 400 Blk. Harvey St., 300-400 Blk. E Glendale St. 300-400 Blk. Bovell Dr. in Crowley, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 10,156 SF of Concrete sidewalk and lead walk, and 8 BRF's curb ramps.
Is Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr open in Crowley?
Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr is still under construction in Crowley, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr located?
Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr is located at 400 Blk. Harvey St., 300-400 Blk. E Glendale St. 300-400 Blk. Bovell Dr., Crowley, TX, 76036, in Tarrant County.
Who is the owner or developer of Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr?
City of Crowley is the property owner/developer of record for Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr, per its TDLR project registration.
Who is the architect or design firm for Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr?
Teague Nail and Perkins, Inc. is the design firm of record for Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr, according to its TDLR filing.
How much does Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr cost and how big is it?
Sidewalk Improve- Harvey St, E Glendale St, E Bovell Dr has an estimated construction value of $180K and approximately 10,156 square feet (about $18/sqft), based on its TDLR filing.
Scope of Work
10,156 SF of Concrete sidewalk and lead walk, and 8 BRF's curb ramps.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
400 Blk. Harvey St., 300-400 Blk. E Glendale St. 300-400 Blk. Bovell Dr., Crowley, TX, 76036
Related Projects
Same Owner
$2.1M totalSame Design Firm
$482K totalWatch all construction in 76036 (Crowley)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Crowley?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.