Project intelligenceTDLR TABS2027004303New Construction
Funding type

This project is privately funded, on private land for private use.

Eastwood Section 3 in Round Rock, TX

2007 Sam Bass Rd Suite 200, Round Rock, TX, 78681

Opening ~Jun 2027Project Registered

Eastwood Section 3 is a new construction project at 2007 Sam Bass Rd Suite 200, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $50K across about 6,500 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 23, 2026250 days across supplied datesJun 30, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    101 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    149 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Eastwood Section 3

Cyclone Development, Inc. is developing Eastwood Section 3, a new residential subdivision located at 2007 Sam Bass Rd Suite 200 in Round Rock. The project involves the construction of 77 single-family residential lots on a 17.194-acre parcel in Williamson County. This filing describes a new construction effort that includes associated public streets and a single lot designated for HOA, open space, and drainage easements.

Project Scope and Specifications

The estimated cost for this development is $50,000, with a reported size of 6,500 square feet. This places the cost per square foot at $8, which is below the median of $109 per square foot found in 4,692 similar new construction filings in Williamson County. The total estimated cost is also below the county median of $850,862 for this type of work. The scheduled build window is 149 days, shorter than the county median of 245 days for comparable projects.

Stephen A Meyer is the registered accessibility specialist for this project. Funding for the development is private, utilizing private land for private use. The project was registered with TDLR in October 2026, and plan review is pending.

Timeline and Local Context

Construction is scheduled to begin in February 2027, with completion targeted for June 2027. The Round Rock area, identified by ZIP code 78681, has a population of approximately 58,531 residents. The median household income in this area is $136,215, and the median value for owner-occupied homes is $460,000. The housing stock in this ZIP code is predominantly owner-occupied, with 20,817 total housing units recorded in Census estimates.

Williamson County’s unemployment rate was 4 percent in August 2026, a figure lower than the rate recorded a year earlier. The TDLR status for this specific filing is Project Registered. This registration confirms that the accessibility requirements for the 77 lots and associated infrastructure have been submitted for review under Texas accessibility standards.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78681 (Round Rock)

One email per change. Unsubscribe in one click. Privacy.

Eastwood Section 3 is a New Construction project located at 2007 Sam Bass Rd Suite 200, Round Rock, TX 78681 in Round Rock, Texas. The project has an estimated value of $50K covering 6,500 sq ft. Cyclone Development, Inc. is the property owner. The project was registered with TDLR on October 23, 2026.

Frequently Asked Questions

What is the construction status of Eastwood Section 3?

The project is registered with TDLR. Plan review is pending, and construction is scheduled to start in February 2027, with completion targeted for June 2027.

Who is the developer for this Round Rock project?

Cyclone Development, Inc. is the owner and developer of record. Stephen A Meyer serves as the registered accessibility specialist for the filing.

How many homes are included in Eastwood Section 3?

The scope includes 77 single-family residential lots. It also includes one lot for HOA, open space, and drainage easements, along with associated public streets.

What is the estimated cost of the project?

The estimated cost is $50,000. This figure is below the county median for similar new construction filings in Williamson County.

What is Eastwood Section 3?

Eastwood Section 3 is a new construction project at 2007 Sam Bass Rd Suite 200 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Section 3, consisting of 17.194 acres, proposes 77 single-family residential lots and 1 HOA/ Open space/ drainage easement lots including associated public streets.

Is Eastwood Section 3 open in Round Rock?

Eastwood Section 3 is still under construction in Round Rock, TX, with an estimated completion of Jun 2027 according to its TDLR registration.

Where is Eastwood Section 3 located?

Eastwood Section 3 is located at 2007 Sam Bass Rd Suite 200, Round Rock, TX, 78681, in Williamson County.

Who is the owner or developer of Eastwood Section 3?

Cyclone Development, Inc. is the property owner/developer of record for Eastwood Section 3, per its TDLR project registration.

How much does Eastwood Section 3 cost and how big is it?

Eastwood Section 3 has an estimated construction value of $50K and approximately 6,500 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

Section 3, consisting of 17.194 acres, proposes 77 single-family residential lots and 1 HOA/ Open space/ drainage easement lots including associated public streets.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2007 Sam Bass Rd Suite 200, Round Rock, TX, 78681

Loading location map…
30.52347, -97.70583

Related City Permits

Building permits found at or near this location

2007 RICHCREEK RD
12.15 mi away

BASE: Installing a backup battery system and additional meter socket.

FinalElectrical PermitAuxiliary PowerJul 2026
View Details
2026-092250 EP
Base Power
2007 PALO DURO RD
13.18 mi away

Total demo of SFR 1008 sq ft circa 1948 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***

ActivePlumbing PermitDemolitionOct 2026
View Details
2026-106914 PP
TRUJILLOS BROTHERS PLUMBING
2007 PALO DURO RD
13.18 mi away

Total demo of SFR 1008 sq ft circa 1948 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***

ActiveBuilding PermitDemolitionAug 2026
View Details
2026-106914 BP
Paradisa Homes, LLC***MAIN***
2007 ROBINHOOD TRL
16.09 mi away

Install Level 2 EV Charger

FinalElectrical PermitSpecial Inspections ProgramJul 2026
View Details
2026-097893 EP
Charge Pro LLC
2007 MEADOWRIDGE DR UNIT 2

New covered patio over existing wood deck area

FinalMechanical PermitAddition and RemodelAug 2026
View Details
2026-109397 MP
Austin Duct and Vent

Watch all construction in 78681 (Round Rock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Round Rock?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.