Project intelligenceTDLR TABS2027004505Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Navasota HS Additions - Phase 4A

1 Rattler Dr., Navasota, TX, 77868

Opening ~Aug 2028Project Registered

Navasota HS Additions - Phase 4A is a additions to existing building project at 1 Rattler Dr., Navasota, in Grimes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $6.0M across about 16,800 sq ft.

Estimated project value
$6.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$357/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 27, 2026645 days across supplied datesAug 2, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    66 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    579 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Navasota HS Additions - Phase 4A

Navasota High School is undertaking a significant expansion project located at 1 Rattler Dr., Navasota, TX 77868. The filing lists the work as Navasota HS Additions - Phase 4A, a major additions to existing building scope that encompasses 16,800 sq ft of new space. The estimated cost for this project is $6,000,000, which calculates to $357 per sq ft. Navasota ISD is the owner and developer of record, with GLS serving as the design firm of record.

Project Scope and Components

The construction involves several distinct additions to the high school campus. The scope includes a cafeteria expansion to accommodate growing student needs. It also adds five new classrooms to the existing educational infrastructure. A dance studio is part of the new construction, which includes gym and locker room space to support physical education and extracurricular activities. Additionally, a new maintenance and storage building is being constructed to support facility operations.

Registration and Timeline

The project was registered with TDLR in October 2026. Phillip Bertram Chapman is the registered accessibility specialist for this filing. Plan review is pending, and completion is targeted for August 2028. Construction start is scheduled for January 2027 per the filing. This project involves public funds, public land, or is a Federally funded roadway project.

Comparing this project to 12 TDLR-registered additions to existing building filings in Grimes County, the median estimated cost is $667,878. The middle half of those projects ranges from $381,250 to $1,725,000. The median size is 8,600 sq ft, and the median cost is $195 per sq ft. The median scheduled build window is 137 days. This project's cost is above the county median for its type, falling in the top quarter. Its scheduled build window of 579 days is longer than the county median of 137 days. Its $357 per sq ft is above the county median of $195.

Navasota ISD has one other TDLR-registered project totaling $200,000, which is closed. GLS has six other TDLR-registered projects totaling $42,256,641, including Troup High School in Troup, Fairview-Miss Jewell Elementary in Copperas Cove, MidTown Park in Bryan, Fain Theater in Livingston, and Wills Point Jr. High & High School CTE in Wills Point. The area profile for ZIP 77868 shows a population of about 18,863 and a median household income of $61,949. Grimes County unemployment rate is 5 percent.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77868 (Navasota)

One email per change. Unsubscribe in one click. Privacy.

Navasota HS Additions - Phase 4A is a Additions to Existing Building project located at 1 Rattler Dr., Navasota, TX 77868 in Navasota, Texas. The project has an estimated value of $6.0M covering 16,800 sq ft. Navasota ISD is the property owner and GLS is the design firm of record. The project was registered with TDLR on October 27, 2026.

Frequently Asked Questions

Who is the registered accessibility specialist for this project?

Phillip Bertram Chapman is the registered accessibility specialist for the Navasota High School additions.

Is the project finished?

The project is registered with TDLR. Plan review is pending and completion is targeted for August 2028.

Is the school open for classes?

The TDLR record covers construction only and does not record whether the business has started serving customers.

What is Navasota HS Additions - Phase 4A?

Navasota HS Additions - Phase 4A is a additions to existing building project at 1 Rattler Dr. in Navasota, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Cafeteria expansion; addition that includes 5 new classrooms; dance studio that includes gym & locker room space; new maintenance/storage building

Is Navasota HS Additions - Phase 4A open in Navasota?

Navasota HS Additions - Phase 4A is still under construction in Navasota, TX, with an estimated completion of Aug 2028 according to its TDLR registration.

Where is Navasota HS Additions - Phase 4A located?

Navasota HS Additions - Phase 4A is located at 1 Rattler Dr., Navasota, TX, 77868, in Grimes County.

Who is the owner or developer of Navasota HS Additions - Phase 4A?

Navasota ISD is the property owner/developer of record for Navasota HS Additions - Phase 4A, per its TDLR project registration.

Who is the architect or design firm for Navasota HS Additions - Phase 4A?

GLS is the design firm of record for Navasota HS Additions - Phase 4A, according to its TDLR filing.

How much does Navasota HS Additions - Phase 4A cost and how big is it?

Navasota HS Additions - Phase 4A has an estimated construction value of $6.0M and approximately 16,800 square feet (about $357/sqft), based on its TDLR filing.

Scope of Work

Cafeteria expansion; addition that includes 5 new classrooms; dance studio that includes gym & locker room space; new maintenance/storage building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1 Rattler Dr., Navasota, TX, 77868

Loading location map…
30.39989, -96.07018

Watch all construction in 77868 (Navasota)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Navasota?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.