Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
CPN106290 - 2026 Asphalt Resurfacing Contract 6 in Fort Worth, TX
100 Fort Worth Trail, Fort Worth, TX, 76102
CPN106290 - 2026 Asphalt Resurfacing Contract 6 is a renovation/alteration project at 100 Fort Worth Trail, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $139K across about 5,141 sq ft.
- Estimated project value
- $139K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,141 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $27/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
571 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
4 days after the preceding date shown.
Source: TDLR filing
View source record
📰About CPN106290 - 2026 Asphalt Resurfacing Contract 6
The City of Fort Worth has registered a renovation project at 100 Fort Worth Trail in Fort Worth, Tarrant County, to repair and replace sidewalks and ramps. The filing identifies the work as CPN106290 - 2026 Asphalt Resurfacing Contract 6. This accessibility improvement targets the Fort Worth City Hall building and its immediate surroundings. The project involves work at multiple specific locations, including Griggs Ave at E Berry St, Ada Avenue between S Ayers and Wallace St, and Ave J between S Ayers and Miller Ave. Additional work is planned for Hawlet St, Oakland Blvd between Arden Pl and Menzer Rd, and Primrose.
George A Patterson is the registered accessibility specialist for this filing. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in October 2026. Plan review is pending and completion is targeted for November 2026. The estimated cost is $138,582 for 5,141 sq ft of work. This results in a cost of $27 per square foot. The project involves public funds and public land, which requires specific regulatory oversight during the construction phase.
Project Scale and Local Context
When compared to other renovation or alteration projects in Tarrant County, this project is smaller in scale. The median estimated cost for similar filings is $250,000, with the middle half ranging from $125,000 to $600,000. This project's cost of $138,582 is below that county median. The median size for these projects is 3,902 sq ft, and the median cost is $79 per sq ft. The scheduled build window for this project is 575 days, which is longer than the county median of 92 days.
The City of Fort Worth has other TDLR-registered projects, including work at Old City Hall and the Fort Worth Convention Center. At this specific address, City of Fort Worth permit records show at least 25 permits on file. The most recent permits were issued between December 2025 and August 2026. These include commercial grading, plumbing, electrical, and building permits with declared valuations totaling $370,000. The area around ZIP 76102 has a median household income of $74,293 and is predominantly renter-occupied.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76102 (Fort Worth)
One email per change. Unsubscribe in one click. Privacy.
CPN106290 - 2026 Asphalt Resurfacing Contract 6 is a Renovation/Alteration project located at 100 Fort Worth Trail,, Fort Worth, TX 76102 in Fort Worth, Texas. The project has an estimated value of $139K covering 5,141 sq ft. City of Fort Worth is the property owner. The project was registered with TDLR on October 29, 2026.
Frequently Asked Questions
Is the Fort Worth City Hall sidewalk repair project finished?
The TDLR record covers construction only and does not record whether the business has started serving customers. The project is targeted for November 2026, and plan review is pending.
Who is the registered accessibility specialist for this project?
George A Patterson is listed as the registered accessibility specialist for the CPN106290 - 2026 Asphalt Resurfacing Contract 6 filing.
What is the total estimated cost of the project?
The estimated cost is $138,582. This covers 5,141 sq ft of sidewalk and ramp repairs at multiple locations around the City Hall.
When was the project registered with TDLR?
The project was registered with the Texas Department of Licensing and Regulation (TDLR) in October 2026.
What is CPN106290 - 2026 Asphalt Resurfacing Contract 6?
CPN106290 - 2026 Asphalt Resurfacing Contract 6 is a renovation/alteration project at 100 Fort Worth Trail in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Repair and replacement of sidewalks and ramps at multiple locations: Griggs Ave (at E Berry St), Ada Avenue (S Ayers - Wallace St), Ave J (S Ayers - Miller Ave), Hawlet St (S Ayers - Miller Ave), Oakland Blvd (Arden Pl - Menzer Rd), Prim…
Is CPN106290 - 2026 Asphalt Resurfacing Contract 6 open in Fort Worth?
CPN106290 - 2026 Asphalt Resurfacing Contract 6 is still under construction in Fort Worth, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is CPN106290 - 2026 Asphalt Resurfacing Contract 6 located?
CPN106290 - 2026 Asphalt Resurfacing Contract 6 is located at 100 Fort Worth Trail, Fort Worth, TX, 76102, in Tarrant County.
Who is the owner or developer of CPN106290 - 2026 Asphalt Resurfacing Contract 6?
City of Fort Worth is the property owner/developer of record for CPN106290 - 2026 Asphalt Resurfacing Contract 6, per its TDLR project registration.
How much does CPN106290 - 2026 Asphalt Resurfacing Contract 6 cost and how big is it?
CPN106290 - 2026 Asphalt Resurfacing Contract 6 has an estimated construction value of $139K and approximately 5,141 square feet (about $27/sqft), based on its TDLR filing.
Scope of Work
Repair and replacement of sidewalks and ramps at multiple locations: Griggs Ave (at E Berry St), Ada Avenue (S Ayers - Wallace St), Ave J (S Ayers - Miller Ave), Hawlet St (S Ayers - Miller Ave), Oakland Blvd (Arden Pl - Menzer Rd), Primrose
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
100 Fort Worth Trail, Fort Worth, TX, 76102
Related Projects
Nearby Projects
Within 0.6 miRelated City Permits
Building permits found at or near this location
Demo and addition of offices and break room remodel with wellness room added.
Watch all construction in 76102 (Fort Worth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Fort Worth?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.