Project intelligenceTDLR TABS2027005809New Construction
Funding type

This project is privately funded, on private land for private use.

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church in Irving, TX

1810 S. Story Road, Irving, TX, 75060

Opening ~Aug 2028Project Registered

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church is a new construction project at 1810 S. Story Road, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $980K across about 5,000 sq ft.

Estimated project value
$980K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$196/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 13, 2026657 days across supplied datesAug 31, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    292 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church

A new 5,000 sq ft church building is planned for 1810 S. Story Road in Irving, Texas. The project, formally titled Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church, involves the complete removal of the existing structure and its associated parking areas. The scope of work includes site improvements, new parking areas, sidewalks, and accessible routes to ensure compliance with accessibility standards.

The property owner of record is the Holy Three Hierarchs Serbian Orthodox Church. Design services are provided by PMG Design, while Richard Todd Lozano serves as the registered accessibility specialist. The project is privately funded and situated on private land for private use. The estimated total cost for this development is $980,000, which calculates to $196 per square foot.

According to the filing, construction is scheduled to begin in September 2027 with a completion date targeted for August 2028. The project was registered with the Texas Department of Licensing and Regulation in November 2026. Plan review is pending, and the current TDLR status is listed as Project Registered. This timeline indicates a build window of 365 days, which is longer than the Dallas County median of 243 days for new construction filings.

Financially, the estimated cost of $980,000 is close to the county median of $950,000 for its type. However, the cost per square foot of $196 is above the county median of $126. The project size of 5,000 sq ft is smaller than the Dallas County median of 9,625 sq ft for new construction. These figures are derived from 8,305 TDLR-registered new construction filings in the county, with 1,066 registered in the last 24 months.

The surrounding area, defined by ZIP code 75060, has an estimated population of about 47,170 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $69,708, and there are approximately 15,538 housing units. The median owner-occupied home value is reported at $224,100, indicating that housing is mostly owner-occupied. Dallas County unemployment was 2.8 percent in September 2026, lower than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75060 (Irving)

One email per change. Unsubscribe in one click. Privacy.

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church is a New Construction project located at 1810 S. Story Road, Irving, TX 75060 in Irving, Texas. The project has an estimated value of $980K covering 5,000 sq ft. Holy Three Hierarchs Serbian Orthodox Church is the property owner and PMG Design is the design firm of record. The project was registered with TDLR on November 13, 2026.

Frequently Asked Questions

Is the Holy Three Hierarchs Serbian Orthodox Church open in Irving?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project is registered with a completion date targeted for August 2028.

Who is the registered accessibility specialist for this project?

Richard Todd Lozano is the registered accessibility specialist for the Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church project in Irving.

What is the estimated cost per square foot?

The estimated cost per square foot is $196. This is calculated from the total estimated cost of $980,000 for the 5,000 sq ft building.

When does construction start?

Construction is scheduled to begin in September 2027 according to the project filing. The project was registered with TDLR in November 2026.

Is this project publicly funded?

No. This project is privately funded, on private land for private use. The owner of record is the Holy Three Hierarchs Serbian Orthodox Church.

What is Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church?

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church is a new construction project at 1810 S. Story Road in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Complete demolition of existing 5,000 SF church building and existing parking areas. Construction of a new 5,000 SF church building, including site improvements, new parking areas, sidewalks, and accessible routes.

Is Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church open in Irving?

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church is still under construction in Irving, TX, with an estimated completion of Aug 2028 according to its TDLR registration.

Where is Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church located?

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church is located at 1810 S. Story Road, Irving, TX, 75060, in Dallas County.

Who is the owner or developer of Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church?

Holy Three Hierarchs Serbian Orthodox Church is the property owner/developer of record for Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church, per its TDLR project registration.

Who is the architect or design firm for Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church?

PMG Design is the design firm of record for Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church, according to its TDLR filing.

How much does Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church cost and how big is it?

Demolition and New Construction of Holy Three Hierarchs Serbian Orthodox Church has an estimated construction value of $980K and approximately 5,000 square feet (about $196/sqft), based on its TDLR filing.

Scope of Work

Complete demolition of existing 5,000 SF church building and existing parking areas. Construction of a new 5,000 SF church building, including site improvements, new parking areas, sidewalks, and accessible routes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1810 S. Story Road, Irving, TX, 75060

Loading location map…
32.79446, -96.97703

Watch all construction in 75060 (Irving)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.