Project intelligenceTDLR TABS2027006278Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

DISD - Bryan Adams HS Culinary Renovation in Dallas, TX

2101 Millmar Drive, Dallas, TX, 75228

Opening ~Jul 2027Review Complete

DISD - Bryan Adams HS Culinary Renovation is a renovation/alteration project at 2101 Millmar Drive, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $1.4M across about 5,000 sq ft.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$285/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 19, 2026224 days across supplied datesJul 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    22 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    197 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About DISD - Bryan Adams HS Culinary Renovation

The Dallas Independent School District is undertaking a culinary renovation at Bryan Adams High School, located at 2101 Millmar Drive in Dallas. This project, formally filed as DISD - Bryan Adams HS Culinary Renovation, involves altering 5,000 sq ft of space with an estimated cost of $1,424,613. The work is registered with the Texas Department of Licensing and Regulation (TDLR) as a TABS project, ensuring accessibility standards are met during the construction phase. Glenn Thomas Comtois serves as the registered accessibility specialist for this initiative.

Project Scope and Timeline

PBK Architects, Inc. is the design firm of record for this alteration. The project involves significant financial investment relative to the square footage, resulting in a cost of $285 per sq ft. TDLR completed the plan review in November 2026, and construction is scheduled to finish in July 2027, with work starting December 2026. This build window of 197 days is longer than the county median of 92 days for similar renovation/alteration filings in Dallas County.

Market Context and Comparison

The estimated cost of $1,424,613 places this project above the county median of $250,000 for its type, landing in the top quarter of comparable filings. The $285 per sq ft figure is also above the county median of $73. Dallas ISD has six other TDLR-registered projects totaling $15,263,494, including work at Central Elementary School and Victor H Hexter Elementary School. PBK Architects, Inc. has also registered six other projects totaling $86,953,483, including work at Little Elm High School and St. Catherine's Montessori.

The site is located in ZIP code 75228, where the U.S. Census ACS 2023 five-year estimates indicate a population of about 69,288 and a median household income of $59,617. The area contains 27,329 housing units with a median owner-occupied home value of $259,500. Housing in this ZIP code is an even mix of owner- and renter-occupied. The project involves public funds and public land. The site is outside the FEMA Special Flood Hazard Area (zone X). Dallas County unemployment rate (FRED, September 2026): 2.8 percent, lower than a year earlier. The TDLR status is listed as Review Complete.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75228 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

DISD - Bryan Adams HS Culinary Renovation is a Renovation/Alteration project located at 2101 Millmar Drive, Dallas, TX 75228 in Dallas, Texas. The project has an estimated value of $1.4M covering 5,000 sq ft. Dallas ISD is the property owner and PBK Architects, Inc. is the design firm of record. The project was registered with TDLR on November 19, 2026.

Frequently Asked Questions

Who is the registered accessibility specialist for this project?

Glenn Thomas Comtois is the registered accessibility specialist for the Bryan Adams High School culinary renovation project in Dallas.

What is the total estimated cost of the renovation?

The estimated cost for the DISD - Bryan Adams HS Culinary Renovation is $1,424,613 for 5,000 sq ft of work.

When does construction start and end?

Construction is scheduled to start in December 2026 and is scheduled to finish in July 2027, following plan review completion in November 2026.

Is the school currently open for classes?

The TDLR record covers construction only and does not record whether the business has started serving customers or if the school is open.

Which architect is designing this project?

PBK Architects, Inc. is the design firm of record for this culinary renovation project at Bryan Adams High School.

What is DISD - Bryan Adams HS Culinary Renovation?

DISD - Bryan Adams HS Culinary Renovation is a renovation/alteration project at 2101 Millmar Drive in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Culinary Renovation

Is DISD - Bryan Adams HS Culinary Renovation open in Dallas?

DISD - Bryan Adams HS Culinary Renovation is still under construction in Dallas, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is DISD - Bryan Adams HS Culinary Renovation located?

DISD - Bryan Adams HS Culinary Renovation is located at 2101 Millmar Drive, Dallas, TX, 75228, in Dallas County.

Who is the owner or developer of DISD - Bryan Adams HS Culinary Renovation?

Dallas ISD is the property owner/developer of record for DISD - Bryan Adams HS Culinary Renovation, per its TDLR project registration.

Who is the architect or design firm for DISD - Bryan Adams HS Culinary Renovation?

PBK Architects, Inc. is the design firm of record for DISD - Bryan Adams HS Culinary Renovation, according to its TDLR filing.

How much does DISD - Bryan Adams HS Culinary Renovation cost and how big is it?

DISD - Bryan Adams HS Culinary Renovation has an estimated construction value of $1.4M and approximately 5,000 square feet (about $285/sqft), based on its TDLR filing.

Scope of Work

Culinary Renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2101 Millmar Drive, Dallas, TX, 75228

Loading location map…
32.82658, -96.68260

Watch all construction in 75228 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.