Iraan, TX Construction Projects

What's being built in Iraan11 projects on file from Texas public records

11
Total Projects
$58.0M
Total Investment
7
New Construction
4
Renovations
84K
Total Sq Ft
$5.3M
Avg. Value

What is being built in Iraan, Texas?

Iraan, Texas has 11 construction and development projects on file worth $58.0M — 7 new construction and 4 renovations or remodels, 1 of them filed in the last six months. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

What new businesses are coming to Iraan?

The most recently filed new-construction projects in Iraan are Iraan Community Center ($3.5M), Athletic Upgrades - Prop D ($2.9M), Ag Facility - Prop C ($3.6M), District Wide Improvements - Prop A ($31.3M). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens, so this list leads street-level visibility rather than following it.

Pecos County Economy

Driving Iraan construction · FRED

Unemployment:5.0%
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 11 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Iraan
Estimated construction value$58MSum of 11 shown records with value
Records in view11 / 11Ready to inspect and compare
Largest record’s share54%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value
Iraan

Comparisons use only these 11 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

Construction & Development in Iraan, Texas

Iraan is experiencing significant construction and development activity with 11 registered projects valued at $58.0M. The city's development portfolio includes 7 new construction projects and 4 renovation projects, representing 83,581 square feet of built space across commercial, residential, and mixed-use developments.

Development Activity

  • 7 new construction projects (64%)
  • 4 renovation/remodel projects (36%)
  • Average project value: $5.3M
  • 1 new projects in last 6 months

Key Players

Iraan's construction market features 5 major property owners and 5 active design firms driving development across the city.

Leading developers include Iraan/sheffield ISD and Pecos County, working with architecture firms such as Claycomb Associates and JSA Architects, Inc..

Our database tracks all TDLR-registered construction projects in Iraan. Projects span Pecos and Crockett counties, providing comprehensive coverage of commercial construction, residential development, and infrastructure improvements throughout Iraan and the surrounding area.

1 New Projects
Registered in the last 6 months

All Projects

11 TDLR · 0 Site Plans

Showing 11 of 11 listed TDLR filings

Closed
$2.6M

Big Sampson Wind

600 County Road 310, Iraan, TX 77354

7,473 sqftOct 15, 2024
Closed
$900K

NEW BUILDING

421 SOUTH HARTE, Iraan, TX 79744

Jul 24, 2017

Iraan construction questions

How many construction projects are there in Iraan, Texas?
There are 11 registered construction projects in Iraan, Texas with a total estimated value of $58.0M and 83,581 square feet of development. The average project is valued at $5.3M.
What kind of construction is happening in Iraan?
Iraan has 7 new construction projects (64%) and 4 renovation or remodel projects (36%) on file, together totaling 83,581 square feet. Work spans commercial, residential and mixed-use development.
Who is building in Iraan?
The most active property owners on file in Iraan are Iraan/sheffield ISD, Pecos County, Michael Meek - Iraan-Sheffield ISD. The architecture and design firms appearing most often on Iraan filings are Claycomb Associates, JSA Architects, Inc., Francis Zordilla - Glaycomb Associates, Architects.
Where does this Iraan construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.

Figures on this page are counted from the Iraan filings themselves and change as new records are registered. How Zabalist sources Texas construction records.