Property Owner

220 NORTHPOINT DRIVE HOLDINGS

900 19TH ST NW 8TH FL, WASHINGTON, Washington D.C 20006
Ryan Stephens

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 1 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

1
Total Projects
$163K
Portfolio Value
0
Not closed · shown
2,668
Sq ft · shown
1
Cities · shown
$163K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time 220 NORTHPOINT DRIVE HOLDINGS files a new project.

Export full work history

Download 220 NORTHPOINT DRIVE HOLDINGS's complete project record — and companies like it — as a CSV.

Browse data lists
Related to 220 NORTHPOINT DRIVE HOLDINGS

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About 220 NORTHPOINT DRIVE HOLDINGS

220 NORTHPOINT DRIVE HOLDINGS is named as an owner in 1 construction filings in the Houston area, with a reported portfolio value of $163K. The 1 loaded filings include 1 new construction records and 0 renovation/alteration records, representing 2,668 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $163K
  • Square footage in shown records: 2,668 sq ft

Market Presence

  • Houston1 projects

Among these 1 loaded filings, 0 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including Arte Architecture. These are filing statuses, not independent observations of work on site.

Activity Over Time

2019
1
Median project: $163KAvg cost/sqft: $61/sqftPeak year: 2019 (1 projects)

Activity Timeline

First Project
Oct 2019
Latest Project
Oct 2019
0
Not closed
1
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$163K combined

Project Status

Closed
1(100%)

All Projects

1 total · Sorted by date