Property Owner2 not closed in shown records

Bob Hope School

304 N. Pruett St., Baytown, Texas 77520

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$16.5M
Portfolio Value
2
Not closed · shown
86,133
Sq ft · shown
2
Cities · shown
$8.3M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Bob Hope School files a new project.

Export full work history

Download Bob Hope School's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Bob Hope School

Every company with $10M+ in tracked project value and a record in the last 24 months

6,500+ recordsCSV download, updated monthly
$299
Subscribers save up to 25% — see plans · view all fields

About Bob Hope School

Bob Hope School is named as an owner in 2 construction filings in the Houston area, with a reported portfolio value of $16.5M. The 2 loaded filings include 2 new construction records and 0 renovation/alteration records, representing 86,133 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $8.3M
  • Square footage in shown records: 86,133 sq ft

Market Presence

  • Baytown1 projects
  • Pasadena1 projects

Among these 2 loaded filings, 2 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 2 cities and name design firms including Sigma Engineers, Inc., Sigma Engineers. These are filing statuses, not independent observations of work on site.

Activity Over Time

2024
1
2025
1
Median project: $10.5MAvg cost/sqft: $209/sqftPeak year: 2024 (1 projects)

Activity Timeline

First Project
Jul 2024
Latest Project
Aug 2025
2
Not closed
0
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$16.5M combined

Project Status

Review Complete
2(100%)