Property Owner1 not closed in shown records

Brant Mullen

4809 Cole Ave Suite 330, Dallas, Texas 75205

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$360K
Portfolio Value
1
Not closed · shown
3,828
Sq ft · shown
2
Cities · shown
$180K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Brant Mullen files a new project.

Export full work history

Download Brant Mullen's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Brant Mullen

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Brant Mullen

Brant Mullen is named as an owner in 2 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $360K. The 2 loaded filings include 0 new construction records and 2 renovation/alteration records, representing 3,828 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 2 renovation projects (100%)
  • Average disclosed value in shown filings: $180K
  • Square footage in shown records: 3,828 sq ft

Market Presence

  • Dallas1 projects
  • Southlake1 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 2 cities and name design firms including Sunset Drafting Design, JZW Architects. These are filing statuses, not independent observations of work on site.

Activity Over Time

2019
1
2024
1
Median project: $200KAvg cost/sqft: $115/sqftPeak year: 2019 (1 projects)

Activity Timeline

First Project
Aug 2019
Latest Project
Apr 2024
1
Not closed
1
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$360K combined

Project Status

Closed
1(50%)
Inspection Complete
1(50%)