Property Owner1 not closed in shown records

BVA SPM SPE LLC & SOUTHPARK MEADOWS SPE HL LLC

6501 LEGACY DR STE B100, PLANO, Texas 75024
Angela Reyes

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$1.0M
Portfolio Value
1
Not closed · shown
10,023
Sq ft · shown
1
Cities · shown
$500K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time BVA SPM SPE LLC & SOUTHPARK MEADOWS SPE HL LLC files a new project.

Export full work history

Download BVA SPM SPE LLC & SOUTHPARK MEADOWS SPE HL LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to BVA SPM SPE LLC & SOUTHPARK MEADOWS SPE HL LLC

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About BVA SPM SPE LLC & SOUTHPARK MEADOWS SPE HL LLC

BVA SPM SPE LLC & SOUTHPARK MEADOWS SPE HL LLC is named as an owner in 2 construction filings in the Austin-Central Texas area, with a reported portfolio value of $1.0M. The 2 loaded filings include 0 new construction records and 2 renovation/alteration records, representing 10,023 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 2 renovation projects (100%)
  • Average disclosed value in shown filings: $500K
  • Square footage in shown records: 10,023 sq ft

Market Presence

  • Austin2 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including Michael Hsu Office of Architecture, Oculus Inc. These are filing statuses, not independent observations of work on site.

Activity Over Time

2021
2
Median project: $900KAvg cost/sqft: $80/sqftPeak year: 2021 (2 projects)

Activity Timeline

First Project
Apr 2021
Latest Project
Jul 2021
1
Not closed
1
Source closed

Project Locations

Project Status

Review Complete
1(50%)
Closed
1(50%)