Property Owner2 not closed in shown records

Centurion Foundation Lamar Boulevard, LLC

3050 Peachtree Rd NW Ste 580, Atlanta, Georgia 30305
Angela Eloff

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$1.1M
Portfolio Value
2
Not closed · shown
1,200
Sq ft · shown
1
Cities · shown
$525K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Centurion Foundation Lamar Boulevard, LLC files a new project.

Export full work history

Download Centurion Foundation Lamar Boulevard, LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Centurion Foundation Lamar Boulevard, LLC

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About Centurion Foundation Lamar Boulevard, LLC

Centurion Foundation Lamar Boulevard, LLC is named as an owner in 2 construction filings in the Austin-Central Texas area, with a reported portfolio value of $1.1M. The 2 loaded filings include 0 new construction records and 2 renovation/alteration records, representing 1,200 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 2 renovation projects (100%)
  • Average disclosed value in shown filings: $525K
  • Square footage in shown records: 1,200 sq ft

Market Presence

  • Austin2 projects

Among these 2 loaded filings, 2 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including Polkinghorn Group Architects. These are filing statuses, not independent observations of work on site.

Activity Over Time

2025
1
2026
1
Median project: $1.0MAvg cost/sqft: $705/sqftPeak year: 2025 (1 projects)

Activity Timeline

First Project
Dec 2025
Latest Project
Sep 2026
2
Not closed
0
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$1.1M combined

Project Status

Registered
1(50%)
Review Complete
1(50%)